2 8<br />
In the Netherlands, the work done on the tender for the<br />
Houten rail tunnels led to the award of the project, which<br />
has now entered its construction design phase.<br />
In addition, working together with colleagues from<br />
Dredging International and VINCI Construction Grands<br />
Projets, consulting work has been done for the preliminary<br />
design for a DBFM (Design-Build-Finance-Maintenance)<br />
type contract for the second “Coentunnel” in Amsterdam<br />
and construction design has continued on the mixed-use<br />
bridge in Utrecht.<br />
In Luxembourg, the European Investment Bank (EIB) bene-<br />
fited from the department’s technical assistance during the<br />
construction of the building’s complex concrete structure.<br />
For this reason, one of the engineers joined the site team<br />
on a full-time basis to manage the technical challenges.<br />
The increase in business at Bageci has also had an impact<br />
on the design department. The start upon the Sclessin<br />
water treatment station and work for the RER (commuter<br />
train network) at Ottignies have lead to a series of activities<br />
in the area of preparing construction methods and means<br />
of execution. During project bidding, the Vortex sewer<br />
project required the most attention.<br />
Christophe Giannone, 26 years<br />
Engineer Design Department<br />
As the structural engineer on the European Investment<br />
Bank (EIB) project in Luxembourg, I am responsible for<br />
coordinating soil stability studies and, during construction<br />
I develop technical solutions with the site team.<br />
Working on a complex “design and construct” project with<br />
numerous participants from different nationalities and<br />
cultures, my greatest challenge is to be able to juggle<br />
priorities while communicating efficiently and effectively<br />
with all players (general contractor, design offices, techni-<br />
cal inspection services, site team and construction work-<br />
ers) to find solutions and answers that will meet every-<br />
body’s requirements and expectations.<br />
The Sclessin water treatment station also required consid-<br />
erable design work for <strong>CFE</strong> EcoTech to devise processes<br />
and coordinate the various technologies.<br />
At <strong>CFE</strong> Brabant, it was the office project for AXA, at Place<br />
Schuman in Brussels that required the most design work.<br />
Both during the bidding on the second contract at the<br />
beginning of the year and at the time of the start-up of the<br />
Bouwteam-type partnership after the order was awarded,<br />
the department worked together with our partners on<br />
optimizing the foundations and the concrete structure.<br />
Among the numerous projects carried out in Brussels,<br />
most noteworthy are the collaborative effort with the<br />
traffic management unit of the SNCB at the South station,<br />
and the construction works at the Central Station and at<br />
the Sand Court buildings.<br />
In addition to our major customers, all other departments<br />
and branches were able to use our services over the past<br />
year. Whether in Poland, Hungary or Slovakia, the engi-<br />
neering department of the construction division was asked<br />
on numerous occasions to provide assistance either from<br />
Brussels or on site. Through <strong>CFE</strong> International, the first<br />
international tenders were made in Africa and the Middle<br />
East.<br />
This project is very enriching for me as I am at the heart<br />
of the action. I discovered techniques with which I was<br />
not very familiar and I have the opportunity to work with<br />
people from various professional backgrounds and differ-<br />
ent cultures.