DRAFT<br />

Figure 2.4.88: Pillow seal positions in the <strong>Super</strong>-FRS Pre-<strong>Separator</strong> and required sizes.<br />

Figure 2.4.89: Pillow seal test stand.<br />

It is expected that downstream from the mid-plane of the Pre-<strong>Separator</strong> (PF2) much less activation<br />

can be expected (at least 2-3 orders of magnitude), which is equivalent to dose rates similar to the<br />

present FRS. Consequently, the same concepts developed and applied successfully for FRS will be<br />

foreseen there.<br />