3. Geometry tests<br />

For cryostated magnets the geometry of the bore and the position of reference surfaces on the<br />

cold mass are measured with respect to the fiducials of the cryostat.<br />

Stage 2 - Tests at Operation Temperature<br />

All magnets have to be tested in operating conditions to warrant the full functionality, as testing is<br />

considered cheaper than identifying a troublemaker in the ring and having it repaired.<br />

During the tests all safety parameters and requirements have to be checked and fulfilled not to risk<br />

to loose a magnet during the power test (e. g. a coil to coil short burning the conductors of the<br />

magnet).<br />

After all tests at operating temperature have been performed, the preliminary evaluation of the test<br />

results has to be done.<br />

The main steps of the tests performed at the operating temperature are outlined in the following:<br />

1. Tests before Cooling Down<br />

• Insulation Tests.<br />

• Vacuum and Leakage Tests<br />

• Check of purity of the helium process gas<br />

• Resistance and Inductance Tests.<br />

• Continuity and Instrumentation Tests.<br />

2. Tests before Power Test at cold<br />

• Insulation Tests.<br />

• Vacuum and Leakage Tests<br />

• Continuity and Instrumentation Tests.<br />

3. Power Test<br />

• Training the magnet up to the nominal current - First Thermal Cycle Criterion<br />

• 'Fast' excitation and de-excitation<br />

• Training during the second thermal-cycle if the First Thermal Cycle Criterion is not<br />

fulfilled - Second Thermal Cycle Criterion<br />

• measurement of the resistance of all joints in the magnet<br />

• Temperature margin<br />

• AC and DC losses measurements<br />

• Vacuum and Leakage Tests during all measurements<br />

4. Cold Magnetic Measurements<br />

• ∫ Bdl<br />

, ∫ Gdl<br />

, harmonics, axis<br />

• Field at DC at least at injection, maximum field and at the geometrical middle<br />

• For ramped magnets (SIS 100 / SIS 300) also the AC components<br />

5. Tests after Power Test at cold<br />

• Insulation Tests.<br />

• Continuity and Instrumentation Tests.<br />

6. Test after Warming Up<br />

• Insulation Tests.<br />