3. Geometry tests<br />
For cryostated magnets the geometry of the bore and the position of reference surfaces on the<br />
cold mass are measured with respect to the fiducials of the cryostat.<br />
Stage 2 - Tests at Operation Temperature<br />
All magnets have to be tested in operating conditions to warrant the full functionality, as testing is<br />
considered cheaper than identifying a troublemaker in the ring and having it repaired.<br />
During the tests all safety parameters and requirements have to be checked and fulfilled not to risk<br />
to loose a magnet during the power test (e. g. a coil to coil short burning the conductors of the<br />
magnet).<br />
After all tests at operating temperature have been performed, the preliminary evaluation of the test<br />
results has to be done.<br />
The main steps of the tests performed at the operating temperature are outlined in the following:<br />
1. Tests before Cooling Down<br />
• Insulation Tests.<br />
• Vacuum and Leakage Tests<br />
• Check of purity of the helium process gas<br />
• Resistance and Inductance Tests.<br />
• Continuity and Instrumentation Tests.<br />
2. Tests before Power Test at cold<br />
• Insulation Tests.<br />
• Vacuum and Leakage Tests<br />
• Continuity and Instrumentation Tests.<br />
3. Power Test<br />
• Training the magnet up to the nominal current - First Thermal Cycle Criterion<br />
• 'Fast' excitation and de-excitation<br />
• Training during the second thermal-cycle if the First Thermal Cycle Criterion is not<br />
fulfilled - Second Thermal Cycle Criterion<br />
• measurement of the resistance of all joints in the magnet<br />
• Temperature margin<br />
• AC and DC losses measurements<br />
• Vacuum and Leakage Tests during all measurements<br />
4. Cold Magnetic Measurements<br />
• ∫ Bdl<br />
, ∫ Gdl<br />
, harmonics, axis<br />
• Field at DC at least at injection, maximum field and at the geometrical middle<br />
• For ramped magnets (SIS 100 / SIS 300) also the AC components<br />
5. Tests after Power Test at cold<br />
• Insulation Tests.<br />
• Continuity and Instrumentation Tests.<br />
6. Test after Warming Up<br />
• Insulation Tests.<br />