Cryo2<br />

Cryo3<br />

CryoST<br />

DB 3<br />

DRAFT<br />

Compressors<br />

Figure 2.4.154: Helium transfer lines and distribution and feed boxes.<br />

Table 2.4.38: Helium transfer lines and their lengths.<br />

DB 2<br />

Cold connection<br />

Cryo1<br />

CryoHeSu<br />

DB 1<br />

Helium Transfer Line Length [m] Type<br />

CRYO1 to distribution box 1 (DB 1) 130 TL-1<br />

CRYO1 to distribution box 2 (DB 2) 350 TL-1<br />

DB 2 to <strong>Super</strong>FRS 10 TL-1<br />

CRYO2 to DB 2 180 TL-1<br />

CRYO2 to DB 3 30 TL-2<br />

DB 3 to Feedbox 1, SIS 100 110 TL-2<br />

DB 3 to Feedbox 2, SIS 100 460 TL-2<br />

DB 3 to Feedbox 3, SIS 100 460 TL-2<br />

DB 3 to Feedbox , SIS 300 110 TL-1<br />

DB 3 to HEBT 170 TL-2<br />

SUM 2010<br />

2.4.A4.3.1 Cold Electrical connections<br />

As the current lead boxes will be placed near by the power supplies within the buildings 1, 2, 3 cold<br />

electrical connections between the current lead boxes and the local feed boxes at the synchrotron<br />

level are required. In Figure 2.4.155 the simplified flow diagram for the cooling of one current<br />