Figure 2.4.137: Zoom of the schematic of cryogenic distribution for the low energy experimental area.<br />

In summary, the main cryogenic facilities for the overall <strong>Super</strong>-FRS installation are listed in Table<br />

2.4.32.<br />

Table 2.4.32: Main cryogenic facilities for the <strong>Super</strong>-FRS.<br />

Main Components Number / Length [m]<br />

Feedbox without endbox integrated 22 (9 for dipoles+13 for multiplets)<br />

Feedbox with endbox integrated 4 (for multiplets)<br />

Helium distribution box 2 (S1 and S2)<br />

Cryogenic transfer line in sections [m]<br />

(length of feedbox units and cryogenic transfer line<br />

from CRYO1 excluded)<br />

~ 135 (~ 30 sections)<br />

Warm helium/quench gas return piping [m] ~ 500<br />

Instrumentation setups and warm gas control panes<br />

for feedboxes and helium distribution boxes<br />

28 = 22 + 4 + 2<br />

154