DRAFT<br />

Figure 2.4.135: Zoom of the schematic of cryogenic distribution in the Pre- and Main-<strong>Separator</strong>.<br />

The zoom of the branching out of the Main-<strong>Separator</strong> to the individual experimental areas is shown<br />

in Figure 2.4.136, (a) panel. Like the beam optics, the cryogenic transfer is required to divide here<br />

into three branches. Therefore two helium distribution boxes are necessary to fulfill the requirement,<br />

one box (S1) may be located at the starting area of the Ring Branch and another box (S2) may<br />

be located in between the last multiplet and the R 3 B detector in the High-Energy experimental cave.<br />

The helium distribution boxes S1 and S2 are required to carry out not only the function of making<br />

the helium flow separation but also the full control functionality to cope with the <strong>Super</strong>-FRS construction<br />

planning and different commissioning requests. In fact, the installation of the Ring<br />

Branch or the Low-Energy Branch may be planned to start after the complete finish of the<br />

High-Energy Branch including the R 3 B experiment construction, and it may be required to start the<br />

cryogenic commissioning much earlier than the full installation of the <strong>Super</strong>-FRS is finished and to<br />

proceed by one branch after another according to the installation planning.<br />

Figure 2.4.136 (panels (b) and (c)) show the flow schemes of these two distribution boxes S1 and<br />

S2, respectively. The cryogenic main supply from the FAIR refrigerator CRYO1 is planned to be<br />

connected via the distribution box S1 to the <strong>Super</strong>-FRS cryogenic installation. The design of the<br />

distribution box S1 allows the cryogenic commissioning and maintenance to be done for the<br />

Main-<strong>Separator</strong>, the Ring Branch and the High- and Low-Energy Branches in a fully independent<br />

way. The four on/off valves in the flow scheme of the distribution box S2 work as the interface<br />

between the <strong>Super</strong>-FRS installation and the R 3 B experiment facilities in terms of cryogenic connection.<br />

The R 3 B detector will be equipped with its own cryogenic installation with full functionality.<br />

In addition the distribution box S2 is designed to further isolate the cryogenic supply of the<br />

low energy branch from that of the High-Energy-Branch. By shutting off of all the valves to and<br />

from the low energy branch and the R 3 B experiment in the distribution box S2, the cryogenic<br />

commissioning and maintenance could be done for the High-Energy-Branch only with the help of<br />

the two other temperature controlled valves (TCF). Because the distance between the last two<br />

multiplets in the High-Energy Branch is quite large (up to 20 m), two feedboxes are needed, i.e. one<br />

for each multiplet to control the cryogenic supply.<br />