31.01.2013 Views

National Calculation Methodology (NCM) - Scottish Government

National Calculation Methodology (NCM) - Scottish Government

National Calculation Methodology (NCM) - Scottish Government

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Activity Database<br />

6 <strong>NCM</strong> Databases.<br />

88. The <strong>NCM</strong> requires the activity definitions for a building to be defined by selection<br />

from a set of standardised activities. For this purpose, the <strong>NCM</strong> Activity Database<br />

was developed. The database contains a list of building types (see Table 9 for the<br />

full list of building types) and the space types (activities) that typically exist in each<br />

one (see Table 10 for the full list of activity). Each building type has a selection of<br />

the total available activity types to choose from.<br />

89. The <strong>NCM</strong> divides each building up into a series of zones (following the zoning<br />

rules in paragraphs 83 - 86), each of which may have different internal conditions<br />

or durations of operation. This enables the calculation to be more analytical about<br />

the energy consumption of a mix of uses in a particular building, rather than relying<br />

on a generic type such as “office” or “school”. For instance, an “office” may mean<br />

anything between a set of cellular offices, meeting rooms, and circulation spaces<br />

that are only occupied during the normal working day, and a dedicated 24-hour<br />

call centre. The approach of setting up multiple activity areas allows such buildings<br />

to be defined more correctly.<br />

90. In order to achieve consistency in assessing compliance and producing Energy<br />

Performance Certificates for non-domestic buildings, when the buildings are used<br />

in different actual operating patterns, a number of parameters for each of the<br />

activity areas are fixed for each activity and building type rather than left to the<br />

discretion of users. These parameters 28 are mainly:<br />

a. Heating and cooling temperatures and humidity set points - The heating and<br />

cooling set-points define the conditions which the selected HVAC system will<br />

be assumed to maintain for the period defined by the heating and cooling<br />

schedules.<br />

b. Lighting standards - The illuminance levels (in Lux) which need to be<br />

maintained in each activity area for the period defined by the lighting<br />

schedules. This level of illumination is then provided by the lighting system<br />

selected by the user. In addition to general lighting, some activities are<br />

assumed to have display lighting. The Lux levels, along with the user selected<br />

lighting system, are used to calculate the heat gains from lighting.<br />

c. Ventilation standards - The required fresh air rate for each activity for the<br />

occupied period. This value is used along with the occupancy to calculate the<br />

quantity of ambient air which then needs to be heated or cooled to the required<br />

heating or cooling set-point. Whether or not the activity will include high<br />

28<br />

The data was drawn from respected sources, such as CIBSE recommendations, supplemented and<br />

modified where necessary to cover activity areas not listed in such sources.<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!