30.01.2013 Views

Indian Summer in Siemensstadt Wincor Nixdorf moves into a new ...

Indian Summer in Siemensstadt Wincor Nixdorf moves into a new ...

Indian Summer in Siemensstadt Wincor Nixdorf moves into a new ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

News<br />

After the conversion and modernization<br />

measures of the ex-mail-order bus<strong>in</strong>ess build<strong>in</strong>g,<br />

the build<strong>in</strong>g works on the Technopark site<br />

are go<strong>in</strong>g <strong>in</strong>to the next round with number 16.<br />

So at the end of July the development work on<br />

Unit 1 will be restarted. Here a total of 10 000<br />

square metres of offi ce space will be created –<br />

a scheme that started off seven years ago but<br />

has not yet been brought to completion. “The<br />

build<strong>in</strong>g site has been half asleep s<strong>in</strong>ce the year<br />

2000, now we have raised the money to be able<br />

to create <strong>new</strong> offi ce space,“ says Simone Kastner,<br />

project leader <strong>in</strong> the Siemens Technopark.<br />

Accord<strong>in</strong>g to Siemens Technopark Manag<strong>in</strong>g<br />

Director Thorsten Kuhfeld, about 50 percent of<br />

the <strong>new</strong> spaces have already been rented out.<br />

“By March 2008 we will be able to hand over the<br />

fi rst rooms to Fujitsu Siemens, who are already<br />

tenants <strong>in</strong> Unit 1 but will move <strong>in</strong>to an area<br />

twice as large on the fi fth fl oor,” adds Kastner.<br />

A complex of offi ces has also been planned for<br />

the eng<strong>in</strong>eers of the neighbour<strong>in</strong>g measur<strong>in</strong>g<br />

<strong>in</strong>struments factory.<br />

But not only offi ce spaces are planned. Particularly<br />

the ground fl oor area is gett<strong>in</strong>g a complete<br />

facelift. Thus the foyer is be<strong>in</strong>g extended<br />

What is happen<strong>in</strong>g on the Siemens Technopark site. Here you will fi nd reports about<br />

the development on the site, what construction activities are planned or <strong>in</strong> progress<br />

and what the plann<strong>in</strong>g for the green spaces and the <strong>in</strong>frastructure looks like.<br />

Start of build<strong>in</strong>g for the<br />

10 000 square metre <strong>new</strong> spaces <strong>in</strong> Unit 1<br />

After a gap <strong>in</strong> build<strong>in</strong>g of seven years, offi ces and a <strong>new</strong> connect<strong>in</strong>g walkway are go<strong>in</strong>g up.<br />

Prospect of even more offi ce space <strong>in</strong> Unit 1<br />

by a connect<strong>in</strong>g walkway to the east. The Wellenste<strong>in</strong><br />

Company and also part of BCD Travel<br />

are mov<strong>in</strong>g <strong>in</strong> there. “And perhaps even more<br />

service providers will go <strong>in</strong> there with their customer<br />

offi ces,” says Kuhfeld.<br />

TACR needs more room and is extend<strong>in</strong>g Unit 8<br />

The 7500 square metre production<br />

and offi ce space that<br />

the TACR Company is us<strong>in</strong>g at<br />

the moment <strong>in</strong> Units 8, 27 and<br />

28 of the Siemens Technoparks<br />

are hardly suffi cient even now.<br />

In the com<strong>in</strong>g one to two years<br />

they are go<strong>in</strong>g to be even<br />

more cramped. The reason is<br />

that thousands of gas turb<strong>in</strong>e<br />

airfoils that have been produced<br />

<strong>in</strong> previous years <strong>in</strong> the<br />

Moabiter gas turb<strong>in</strong>e factory<br />

are com<strong>in</strong>g to TACR for recondition<strong>in</strong>g.<br />

Just about enough time to<br />

enlarge. So the company has<br />

decided to extend its offi ces<br />

<strong>in</strong> Unit 8. “It is planned to extend<br />

the build<strong>in</strong>g by add<strong>in</strong>g<br />

an extra storey. Thus the whole<br />

adm<strong>in</strong>istrative area can be<br />

put together <strong>in</strong> one complex,”<br />

says Jacquel<strong>in</strong>e Larsson from<br />

the fi rm of architects responsible<br />

“larsson architekten”. At<br />

The offi ces of TACR will be built up on top of the exist<strong>in</strong>g build<strong>in</strong>g.<br />

Photo: larsson architekten<br />

the moment TACR has accommodated<br />

its offi ces <strong>in</strong> various<br />

build<strong>in</strong>gs as an <strong>in</strong>termediate<br />

solution. This <strong>in</strong>termediate<br />

solution is to come to an end<br />

shortly. Larsson is nam<strong>in</strong>g the<br />

second week <strong>in</strong> January for the<br />

start of build<strong>in</strong>g and, as it is<br />

be<strong>in</strong>g done by dry construction,<br />

it is anticipated that TACR<br />

will be mov<strong>in</strong>g <strong>in</strong>to the <strong>new</strong><br />

rooms as soon as July 2008.<br />

New signs<br />

for good orientation<br />

On the Siemens Technopark<br />

site a real forest of<br />

signs fl ourishes – and yet it is<br />

still diffi cult to fi nd your way<br />

around. That is set to change <strong>in</strong><br />

October. The fi rm of architects<br />

„larsson architekten“ has worked<br />

out a standard signpost<strong>in</strong>g<br />

system for the Technopark to<br />

guide the visitor to his dest<strong>in</strong>ation<br />

without detours. “There<br />

will be a system of pylons that<br />

are built up <strong>in</strong> four levels,” expla<strong>in</strong>s<br />

architect Jacquel<strong>in</strong>e Larsson.<br />

So at both entrances Rohrdamm<br />

and Nonnendammallee<br />

there will be three-metre high<br />

pylons that will fi rst of all offer<br />

an overview of the various<br />

tenants <strong>in</strong> sectors A-D. On arrival<br />

<strong>in</strong> the correspond<strong>in</strong>g area,<br />

signpost<strong>in</strong>g pylons will help<br />

you fi nd the right build<strong>in</strong>g. In<br />

front of the build<strong>in</strong>gs there are<br />

build<strong>in</strong>g pylons 2.40 metres<br />

high and 60 centimetres wide<br />

that list all the tenants <strong>in</strong> the<br />

correspond<strong>in</strong>g build<strong>in</strong>g, while<br />

directly on the build<strong>in</strong>g 60 by<br />

60-centimetre-large signs are<br />

affi xed with numbers and entrance<br />

<strong>in</strong>structions.<br />

With the alum<strong>in</strong>ium, plastic-coated<br />

signs, the signpost<strong>in</strong>g<br />

system <strong>in</strong> the Technopark<br />

should not only guide you<br />

more easily around the site,<br />

it should also present a uniform<br />

picture. And if there is a<br />

change of tenant, the names<br />

on foil can be simply taken off<br />

and replaced.<br />

Signpost<strong>in</strong>g pylons.<br />

Photo: larsson architekten<br />

Gerhard Schiller.<br />

S<strong>in</strong>ce 2004 he has been development manager of the retail department of W<strong>in</strong>cor <strong>Nixdorf</strong><br />

and also manages the headquarters of the company <strong>in</strong> the Siemens Technopark.<br />

IT solutions made <strong>in</strong> Berl<strong>in</strong><br />

W<strong>in</strong>cor <strong>Nixdorf</strong> provides banks and companies world<br />

wide with software, hardware and consult<strong>in</strong>g services<br />

Park <strong>new</strong>s: Mr Schiller fi rst<br />

of all can you please expla<strong>in</strong><br />

to us what W<strong>in</strong>cor <strong>Nixdorf</strong> produces?<br />

Schiller: W<strong>in</strong>cor <strong>Nixdorf</strong><br />

is one of the lead<strong>in</strong>g sellers<br />

worldwide of IT solutions for<br />

retail bank<strong>in</strong>g and trad<strong>in</strong>g<br />

companies. The comprehensive<br />

portfolio of the company,<br />

consist<strong>in</strong>g of hardware, software,<br />

consult<strong>in</strong>g services and<br />

services is aimed at optimiz<strong>in</strong>g<br />

bus<strong>in</strong>ess processes for banks<br />

and retail cha<strong>in</strong>s that have a<br />

far-reach<strong>in</strong>g network of subsidiaries,<br />

reduc<strong>in</strong>g costs and<br />

complexity and improv<strong>in</strong>g the<br />

service to the end customer.<br />

This <strong>in</strong>cludes system solutions<br />

for lottery companies, petrol<br />

station operators, community<br />

cater<strong>in</strong>g or <strong>in</strong>dustrial companies.<br />

The range of products<br />

for retail bank<strong>in</strong>g covers the<br />

complete spectrum from automation<br />

and self-service systems<br />

such as cash mach<strong>in</strong>es,<br />

<strong>in</strong>formation and transaction<br />

term<strong>in</strong>als or receipt pr<strong>in</strong>ters.<br />

For the operation of self-service<br />

mach<strong>in</strong>es W<strong>in</strong>cor <strong>Nixdorf</strong><br />

offers software solutions with<br />

which not only their own but<br />

also the mach<strong>in</strong>es of other manufacturers<br />

can be operated.<br />

We have also developed an <strong>in</strong>-<br />

ternationally-geared software<br />

solution for <strong>in</strong>ternet or telephone<br />

bank<strong>in</strong>g.<br />

W<strong>in</strong>cor <strong>Nixdorf</strong> offers retail<br />

companies till systems and the<br />

correspond<strong>in</strong>g software for sales,<br />

<strong>in</strong>formation systems and<br />

also solutions for branch automation<br />

such as electronic shelf<br />

labell<strong>in</strong>g and reverse vend<strong>in</strong>g<br />

mach<strong>in</strong>e systems. A further focus<br />

consists <strong>in</strong> the <strong>in</strong>tegration<br />

of the branches <strong>in</strong> the company-wide<br />

IT <strong>in</strong>frastructure.<br />

PN: How long has your<br />

company been on the Siemens<br />

Technopark site?<br />

Schiller: Our <strong>in</strong>novation<br />

and development centre has<br />

been on the <strong>Siemensstadt</strong> site<br />

s<strong>in</strong>ce 1995.<br />

PN: Why move now?<br />

Schiller: On the one hand<br />

our present lease contract on<br />

the Siemens Campus, Unit 4<br />

was end<strong>in</strong>g and we had the<br />

task of gear<strong>in</strong>g ourselves to<br />

the market <strong>in</strong> Berl<strong>in</strong> and Brandenburg.<br />

Furthermore we are<br />

burst<strong>in</strong>g out at the seams with<br />

regard to space and process<strong>in</strong>g.<br />

As we work <strong>in</strong> various<br />

build<strong>in</strong>gs on the campus, we<br />

had long ways to go. This led<br />

to <strong>in</strong>terrupted processes <strong>in</strong> development<br />

and quality control<br />

and therefore higher cost.<br />

PN: How many staff do you<br />

employ and <strong>in</strong> what areas?<br />

Schiller: The <strong>in</strong>novation<br />

and development centre <strong>in</strong><br />

Berl<strong>in</strong> with 200 staff at present<br />

is an essential component of<br />

our growth strategy, responsible<br />

for the development and<br />

provision of future solutions,<br />

systems and products and onsite<br />

support. Highly qualifi ed<br />

people are work<strong>in</strong>g on this<br />

ma<strong>in</strong>ly mould<strong>in</strong>g the <strong>in</strong>novations<br />

with their knowledge of<br />

the trade. Furthermore here<br />

on site about 50 members of<br />

Redesign<strong>in</strong>g on the Quellweg <strong>in</strong> full sw<strong>in</strong>g<br />

The reorganization works of the car<br />

parks on the Quellweg will last until<br />

the end of the year. Siemens Technopark<br />

Manag<strong>in</strong>g Director Thorsten Kuhfeld <strong>in</strong>formed<br />

us. S<strong>in</strong>ce August extensive roadworks<br />

have been carried out <strong>in</strong> this spot,<br />

which has caused annoyance <strong>in</strong> many<br />

places “Perhaps we should have given our<br />

tenants rather more extensive <strong>in</strong>formation<br />

about these measures,” admits Kuhfeld.<br />

The fact rema<strong>in</strong>s however that <strong>in</strong> this<br />

spot car park<strong>in</strong>g spaces and bicycle stands<br />

had to be removed as these were on a plot<br />

of land that had already been sold <strong>in</strong> June<br />

2006. “Previously neither the build<strong>in</strong>g on<br />

it nor the land itself was be<strong>in</strong>g used with<br />

the result that the Siemens Technopark<br />

The <strong>new</strong> home of W<strong>in</strong>cor <strong>Nixdorf</strong><br />

could cont<strong>in</strong>ue to use the park<strong>in</strong>g spaces,”<br />

expla<strong>in</strong>s Kuhfeld. The situation has now<br />

changed however and <strong>new</strong> roads, green<br />

spaces and replacement park<strong>in</strong>g spaces<br />

will have to be created. About 30 park<strong>in</strong>g<br />

spaces are planned – that is about two<br />

thirds of the previous spaces - that are<br />

placed on both sides of the road. In addition<br />

to that <strong>new</strong> bicycle stands will be provided<br />

as the old ones were already about<br />

40 years old and are <strong>in</strong> urgent need of modernization.<br />

“Moreover the gate system<br />

will get a further entrance and the fence<br />

<strong>in</strong> this spot will be re<strong>new</strong>ed <strong>in</strong> such a way<br />

that it fi ts <strong>in</strong>to the total appearance of the<br />

Technopark fenc<strong>in</strong>g,” Kuhfeld goes on.<br />

The Berl<strong>in</strong> water companies are us<strong>in</strong>g the<br />

Interview<br />

staff from the bus<strong>in</strong>ess consult<strong>in</strong>g<br />

sector with a focus on<br />

trade and bank<strong>in</strong>g, the service<br />

division, responsible for the<br />

customer-support of the IT solutions<br />

and also the relevant<br />

sales departments.<br />

PN: What advantages does<br />

the Siemens Technopark offer<br />

for your company?<br />

Schiller: Our <strong>new</strong> home<br />

offers us the most up-to-date<br />

<strong>in</strong>frastructure <strong>in</strong> an optimal<br />

space for development, quality<br />

control, service, sales and<br />

consult<strong>in</strong>g with short routes<br />

and ideal connection to public<br />

transport such as Tegel Airport<br />

and the railway stations. Moreover<br />

the management of the<br />

Berl<strong>in</strong> Siemens Technopark<br />

was able to offer us a lease <strong>in</strong><br />

l<strong>in</strong>e with market prices over a<br />

period realistic for plann<strong>in</strong>g<br />

and therefore received our<br />

acceptance.<br />

present build<strong>in</strong>g operations to renovate<br />

their foul and storm water sewers. In addition<br />

here too the green and recreational<br />

spaces will be redesigned.<br />

Further <strong>in</strong>formation can be obta<strong>in</strong>ed from<br />

the Project Leader Simone Kastner,<br />

telephone number: 386 31621,<br />

Mail: simone.kastner@siemens.com<br />

2 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!