30.01.2013 Views

The Army Maintenance Management System (TAMMS) Users Manual

The Army Maintenance Management System (TAMMS) Users Manual

The Army Maintenance Management System (TAMMS) Users Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contents—Continued<br />

Missing historical information or records 5–2, page 130<br />

DA Form 2408–4 5–3, page 130<br />

DA Form 2408–4 used for recording armament system and subsystems 5–4, page 131<br />

DA Form 2408–5 (Equipment Modification Record) 5–5, page 132<br />

Usage reporting through ULLS-G 5–6, page 133<br />

DA Form 2408–9 5–7, page 133<br />

DA Form 2408–20 (Oil Analysis Log) 5–8, page 140<br />

DD Form 1650 (Ammunition Data Card) 5–9, page 140<br />

Equipment logbook binder (historical records) 5–10, page 140<br />

Records that go with equipment 5–11, page 141<br />

Chapter 6<br />

Watercraft and Amphibious Lighters Records and Procedures, page 165<br />

General 6–1, page 165<br />

Reporting of accidents/incidents 6–2, page 166<br />

Component record 6–3, page 166<br />

Request for disposition and/or waiver 6–4, page 167<br />

Chapter 7<br />

Rail Equipment Records and Procedures, page 171<br />

General rail equipment forms 7–1, page 171<br />

Preparation of forms 7–2, page 172<br />

DD Form 862 (Daily Inspection Worksheet for Diesel Electronic Locomotives and Locomotive Cranes) 7–3,<br />

page 172<br />

DD Form 1335 7–4, page 172<br />

Form FRA F6180–49A 7–5, page 172<br />

Chapter 8<br />

Ammunition Records and Reporting Procedures, page 179<br />

Records and reports 8–1, page 179<br />

Special instructions 8–2, page 179<br />

General instructions 8–3, page 180<br />

DA Form 2415 (Ammunition Condition Report) (RCS CSGLD–1202) 8–4, page 180<br />

ACR submission flow and preparation 8–5, page 181<br />

Chapter 9<br />

Supply and <strong>Maintenance</strong> Assessment and Review Team (SMART), page 184<br />

General 9–1, page 184<br />

Procedures 9–2, page 184<br />

Chapter 10<br />

Submitting Equipment Improvement Reports and Product Quality Deficiency Reports and Reporting<br />

Initial Failure of Stock-Funded, Depot-Level Reparables, page 184<br />

Reporting 10–1, page 184<br />

Use and preparation of an SF 368 10–2, page 185<br />

Exhibits 10–3, page 187<br />

Addresses for the SF 368 10–4, page 187<br />

Reporting initial failure of SFDLR 10–5, page 187<br />

Appendixes<br />

A. References, page 201<br />

B. Codes and Conversion Tables, page 208<br />

C. Warranty Control offices and Logistics Assistance Offices, page 239<br />

D. Julian/Ordinal Date Calendar, page 245<br />

DA PAM 750–8 22 August 2005<br />

iii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!