a. SAMS–1 Customer Work Order Reconciliation, PCN AHN–004.<br />

(1) This reconciliation report verifies that the equipment listed is physically in the possession of the supporting<br />

maintenance activity (fig 3–48).<br />

(2) <strong>The</strong> report should be provided to the non-ULLS unit on a weekly basis.<br />

b. SAMS–2 Equipment Deadlined Over NNN Days by Battalion, PCN AHO–026.<br />

(1) This report provides a list of WOs that are more than a specified number of days old (NNN). <strong>The</strong> SAMS–2<br />

manager when requesting the report enters the specified number of days (fig 3–49).<br />

(2) This report is divided into three parts: Part I lists all DA Form 2406 reportable items on deadline; Part II lists all<br />

command maintenance-significant items on deadline; and Part III is a summary of the complete report, which lists the<br />

Parent UIC and name, reportable items, ERC A, pacing items, maintenance-significant items, and gives a command<br />

total within each area per battalion.<br />

(3) When the number of days (NNN) is set to 00 (or blank), the report is a current reverse side DA Form 2406.<br />

c. SAMS–2 Work Order Status and Parts Listing, PCN AHO–032.<br />

(1) <strong>The</strong> Work Order Status and Parts Listing Report is selective by UIC (support or unit), WO status, and ECC or<br />

EIC for open work orders which, by priority, exceed the number of days set when requesting the report (fig 3–50). This<br />

report also provides a listing of parts by WO or ECC for each EIC.<br />

(2) Listing Information is sorted by support UIC or customer UIC, support ECC, or work order number (WON).<br />

d. SAMS–2 <strong>Maintenance</strong> Cost by Customer, PCN AHO–022.<br />

(1) This report is produced to provide the customer with an exact cost for the repair of unit equipment by WON<br />

when SAMS–1 master files are completed with current labor rates and parts costs (fig 3–51).<br />

(2) Information is sorted in order by UIC support, UIC customer, and WON.<br />

Legend for Figure 3–1;<br />

completion instructions follow.<br />

1. FILE INPUT ACT CD. File Input Action Code A for Addition of a New Inoperative Record.<br />

2. UNIT WORK ORDER NO. (ORG WON). <strong>The</strong> ORG WON assigned from the unit DA Form 2405.<br />

3. ID. A for NSN.<br />

4. NSN OF DEADLINED ITEM. NSN for the inoperative item.<br />

Figure 3–1. Sample DA Form 5409<br />

54 DA PAM 750–8 22 August 2005