30.01.2013 Views

The Army Maintenance Management System (TAMMS) Users Manual

The Army Maintenance Management System (TAMMS) Users Manual

The Army Maintenance Management System (TAMMS) Users Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SHOP. Name of installation.<br />

CLASS. Classification of Installation. For example Type 1, 2, and so on.<br />

INSPECTION LOCATION. City and State where located.<br />

DATE. Current day’s calendar date.<br />

CAR NUMBER. Assigned USA or DODX number.<br />

TEST. Mark dates tested for tank and valve.<br />

PRESSURE. Mark tank pressure from 60 to 300 PSI, valve pressure 25 to 100 PSI.<br />

GAL. Capacity in gallons.<br />

LWT. Weight of car when not loaded.<br />

LDMT. Weight of car loaded.<br />

AIR DATE. Date of last air test.<br />

JOURNAL PADS. Date pads were last changed, if applicable.<br />

TYPE. Name of pad.<br />

DATE BUILT. <strong>The</strong> year the car was built.<br />

DATE LAST INSP. Date of last inspection performed.<br />

ACI. Leave blank.<br />

ITEM. Complete as necessary.<br />

CONDITION. Make a check mark in the blocks marked satisfactory, repair, or renew, as they apply.<br />

REMARKS (Check). Check appropriate block to match materials in item and condition columns.<br />

SIGNATURE OF EQUIPMENT SPECIALIST. Signature of qualified rail equipment inspector.<br />

APPROVED. Signature of approving official.<br />

Figure 7–2. Sample DD Form 1335<br />

DA PAM 750–8 22 August 2005<br />

177

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!