30.01.2013 Views

The Army Maintenance Management System (TAMMS) Users Manual

The Army Maintenance Management System (TAMMS) Users Manual

The Army Maintenance Management System (TAMMS) Users Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WPN SYS MODEL OR NOUN/END ITEM MODEL. Name or model number of the item of equipment (WPN SYS not shown on Part II). /<br />

Serial number of the weapon system/end item.<br />

END ITEM MODEL OR NOUN BUMPER NO. Name or model number of the item of equipment. Bumper number is a locally assigned<br />

number used to identify the item.<br />

SYS DL. Weapon <strong>System</strong> Deadlined Code for the item (not shown on Part II). Codes are: Y—Deadlined <strong>System</strong> (NMC), N—Not <strong>System</strong><br />

Applicable (does not deadline system), P—Impairs system (partial mission capable). Aviation only; not currently used in SAMS.<br />

SERIAL NUMBER. <strong>System</strong> serial number.<br />

WO CD. <strong>The</strong> Work Request Status Code, indicating the status of work being done.<br />

STA DATE. <strong>The</strong> Status Date indicates when the status code was last changed.<br />

WON. Work Order Number, assigned to identify and track the maintenance request.<br />

MH–RMN. Man-hours remaining. Estimate of the number of man-hours still required to complete the work order.<br />

DATE DL. Date the item was deadlined at unit level or date accepted at support.<br />

MALFUNCTION DESCRIPTION. A brief description of the problem.<br />

ERC. Equipment Readiness Code of the item is a code used to show whether the item is: A—primary weapons and equipment (PWE),<br />

B—Auxiliary Equipment (AE), C—Admin Support Equipment (ASE), P—Pacing Item (item so important it is subject to continuous<br />

monitoring.)<br />

DAYS DL. Total number of days (as of the prepared date) the item has been deadlined. <strong>The</strong> following parts data fill follow each work<br />

order on subsequent lines.<br />

DOC NO. Document number of the supply transaction requesting repair parts for the work order.<br />

REPAIR PART NOUN AND NSN. Name and number of the repair part needed.<br />

QTY RQD. Quantity Required. Quantity of the part needed to accomplish the repair.<br />

QTY OH. Quantity on hand. Quantity of the part available to issue to the work order.<br />

SRCE. Supply source code indicates where the part comes from.<br />

PD. Priority designator. Priority assigned to the supply transaction.<br />

STATUS CD AND DATE. Last status of the supply transaction and the date the status was assigned.<br />

ESD. Estimated shipping date. This is the estimated date the part will be shipped (if provided by the supply source).<br />

MAINT LEVEL. Level at which maintenance is being performed: O—Organization, S—Support.<br />

Figure 3–49. Sample SAMS–2 Equipment Deadlined Over NNN Days by Battalion<br />

Legend for Figure 3–50;<br />

completion instructions follow.<br />

Figure 3–50. Sample SAMS–2 Work Order Status and Parts<br />

122 DA PAM 750–8 22 August 2005

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!