30.01.2013 Views

Building Construction Department Govt. of Bihar - State Health ...

Building Construction Department Govt. of Bihar - State Health ...

Building Construction Department Govt. of Bihar - State Health ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4 Submissions <strong>of</strong> Proposals<br />

4.1 The Applicants shall submit the details on issued/downloaded Application and in<br />

hard bound form with all pages numbered serially and by giving an index <strong>of</strong><br />

submissions. Applications submitted in other forms like spiral bound form; loose<br />

form etc shall be rejected. Copies <strong>of</strong> Applications shall not be submitted and<br />

considered.<br />

4.2 You must submit original proposal as indicated in the Data Sheet. Each proposal<br />

will be sealed in an outer envelope which will bear the address and information<br />

indicated in the Data Sheet. The envelope must be clearly marked:<br />

Project Name …………………………..<br />

Do not open, except in presence <strong>of</strong> the evaluation committee<br />

4.2.1 This outer envelope will contain two separate envelopes, one clearly marked<br />

‘Technical Proposal’ and the second clearly marked ‘Financial Proposal’ (The<br />

two envelopes indicating ‘ORIGINAL’).<br />

4.2.2 The technical and financial proposal must be prepared in indelible ink and must<br />

be signed by the authorized representative <strong>of</strong> the consultants. The letter <strong>of</strong><br />

authorization must be confirmed by a written power <strong>of</strong> attorney accompanying the<br />

proposals. All pages <strong>of</strong> the technical and financial proposals must be initialed by<br />

the person or persons signing the proposal.<br />

4.3 The proposal must contain no interlineations or overwriting except as necessary to<br />

correct errors made by the Consultants themselves, in which cases such<br />

corrections must be initialed by the person or persons signing the proposal.<br />

4.4 Your completed Technical and Financial proposal must be delivered on or before<br />

the time and date stated in Data Sheet.<br />

4.5 Your proposal must be valid for the number <strong>of</strong> days stated in the Data Sheet from<br />

the closing date <strong>of</strong> submission <strong>of</strong> proposal.<br />

5 Proposal Evaluation<br />

5.1 A three-stage procedure will be adopted in evaluating the proposal. In the first<br />

stage, eligibility <strong>of</strong> the firm will be ascertained on the basis <strong>of</strong> experience<br />

certificates, firms’ turnover and equipments available with the firm as indicated in<br />

datasheet. In the second stage, a technical evaluation, which will be carried out<br />

prior to opening any financial proposal. The technical proposal should score at<br />

least 50 points out <strong>of</strong> 100 to be considered for financial evaluation. The <strong>Building</strong><br />

<strong>Construction</strong> <strong>Department</strong>, however, reserves the right to make changes in<br />

technical requirement if no firm is able to score minimum 50 points. In the third<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!