10 LIKELY ADDITIONAL SERVICE<br />

10.1 The consultants may be required to carry out the following in the event <strong>of</strong> the<br />

contingencies arising for them on the request <strong>of</strong> the employer as per terms negotiated<br />

then. No financial cost should be provided against them in the present financial<br />

proposal. The events are:<br />

(i) preparation <strong>of</strong> reports or additional contract documents for consideration <strong>of</strong> proposals<br />

for carrying out additional work;<br />

(ii) any other specialist services by the Engineer or by other specialists, pertaining to the<br />

works contract supervised by the consultant as may be agreed upon<br />

11. REPORTING REQUIREMENTS<br />

11.1 The consultant will prepare and submit the following reports in hard and s<strong>of</strong>t copies<br />

to the Employer on the format prepared by the consultants and as approved by the<br />

Employer.<br />

A. Progress Report and other important issues:<br />

i) Progress on Consultant’s mobilization Monthly 10<br />

Copies<br />

ii) Contract-wise performance reports<br />

covering all aspects<br />

Monthly 10 Copies<br />

iii) Progress summary (Physical and Financial<br />

Progress report)<br />

Monthly 10 Copies<br />

iv) Update <strong>of</strong> Implementation schedules, cost.<br />

tables and financial forecasting.<br />

Quarterly 10 Copies<br />

v) Bid Evaluation reports Within 21 days days <strong>of</strong><br />

bid opening<br />

3 Copies<br />

vi) Compliance <strong>of</strong> vigilance/audit remarks etc. Within 15 days days <strong>of</strong><br />

receipt <strong>of</strong> the letter<br />

3 Copies<br />

vii) Labour reports and other issues Monthly or as required 6 Copies<br />

B. Completion reports & other records<br />

On completion <strong>of</strong> works and finalization <strong>of</strong> accounts, for each contract package.<br />

the following record on site should be handed over to the Executive Engineer :<br />

i) completion drawings <strong>of</strong> all structures;<br />

ii) revised estimate (work completion report) as per actual execution with<br />

regions for major deviations;<br />

iii) quality control record and field level books. Measurement books.<br />

Correspondence files etc: and<br />

iv) contractor’s claims etc.<br />

v)<br />

28