• Capabilities and experience <strong>of</strong> the contractor. In this respect the consultant<br />

would take into account the overall need to develop and effective local<br />

construction industry by allowing the maximum number <strong>of</strong> local<br />

contractors to gain experience, and. If applicable, benefit from<br />

participation in the training programme.<br />

• Financial standing <strong>of</strong> company.<br />

• Submission <strong>of</strong> evaluation report in the prescribed format. Evaluate the<br />

bids <strong>of</strong> all Bidders irrespective <strong>of</strong> the fact whether they are responsive /<br />

non responsive.<br />

The analyzed report will be prepared on a Computer in spread sheet from.<br />

7.2.4 Quality Control Management:<br />

(i) Quality Control Management as per requirement including Evaluation, Monitoring &<br />

suggestion to improve the quality <strong>of</strong> works.<br />

Principal responsibilities will be generally to carry out all the duties <strong>of</strong> the Engineer as<br />

specified in the construction Contract documents, within the limitations specified therein,<br />

but not limited to the following. In case <strong>of</strong> any disparity, the stipulations made in the<br />

civil construction contract documents will prevail in the order <strong>of</strong> precedence mentioned<br />

therein.<br />

(i) to approve the Contractor’s key superintendent personnel, construction<br />

mobilization programs, temporary land to be occupied by the Contractor<br />

(ii) to approve the contractor’s work program including activity scheduling and<br />

resource programming<br />

(iii) give the order to commence the work;<br />

(iv) ensure that the construction works are in accordance with the technical<br />

specifications, and other stipulation <strong>of</strong> construction contract documents and the<br />

construction methods proposed by the contractor are in compliance with the<br />

above stipulations particularly, in relation to Contractor’s construction<br />

equipment and other resource deployment,.<br />

(v) to approve setting out <strong>of</strong> the works<br />

(vi) to verify and if necessary order correction <strong>of</strong> the as staked drawings<br />

supplied by the Contractor<br />

(vii) ensure a system <strong>of</strong> Quality Assurance <strong>of</strong> works, approve materials and sources <strong>of</strong><br />

materials, review all bituminous mix designs and concrete mix designs proposed by<br />

the contractor and approve/suggest modifications in the mix design, laying<br />

methods, sampling and testing procedure and Quality Control measures to ensure<br />

required standard and consistency in quality, at the commencement <strong>of</strong> item<br />