DESCRIPTION OF SERVICES<br />

7.2.1 PROVIDE PRE CONSTRUCTION SERVICES :<br />

(a) Preparation <strong>of</strong> Bidding Document & Inviting Tenders . This activity shall not<br />

include preparation <strong>of</strong> DPRs, estimates or BOQs.<br />

(b) Assist Employer in I.F.B. Draft Notice <strong>of</strong> tender will be worked out.<br />

(c) Assist Employer in the pre-tender conference in handling Contractor’s queries.<br />

Prepare proceeding <strong>of</strong> the meeting and hand over to Employer and all<br />

attendances.<br />

7.2.2 TENDER OPENING SERVICES :<br />

(a) Assistance in organising and conducting tender opening meeting. Assist in<br />

checking the validity <strong>of</strong> the tender.<br />

(b) Arithmetic check will be conducted and exact total bid value arrived.<br />

(c) A report to be submitted to Employer on tender opening.<br />

(d) The Employer will hand over one set <strong>of</strong> the tender documents to Team<br />

Leader <strong>of</strong> evaluation on the same day.<br />

7.2.3. BID EVALUATION :<br />

(i) Evaluation <strong>of</strong> Bidding Document & providing assistant in selection <strong>of</strong> contractors<br />

including preparation <strong>of</strong> technical and financial comparative chart <strong>of</strong> bids for<br />

construction work.<br />

The Consultant would assist the Client with independent evaluation <strong>of</strong> bids,<br />

negotiations (not on price) and contract awards to the extent required by the<br />

client. The Consultant would submit their bid evaluation reports as soon as<br />

possible, to expedite construction, but in any event not later than 15 days after bid<br />

opening.<br />

Depending on the amount <strong>of</strong> information which Contractors are required to<br />

submit in accordance with the Bid Documents. Bid evaluation report would<br />

typically cover the following :<br />

• Conformity <strong>of</strong> bid with requirements :<br />

• Arithmetic accuracy:<br />

• General distribution and applicability <strong>of</strong> rates and prices (i.e no front end<br />

loading)<br />

• Exceptionally high and low rates.<br />

• Adequacy <strong>of</strong> resources and equipment for the particular type <strong>of</strong> work.<br />

• Work plan.<br />