Building Construction Department Govt. of Bihar - State Health ...
Building Construction Department Govt. of Bihar - State Health ...
Building Construction Department Govt. of Bihar - State Health ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The number <strong>of</strong> points to be given under each <strong>of</strong> the evaluation criteria are:<br />
(i) Firms relevant experience<br />
Points<br />
(a) No <strong>of</strong> years in which supervision Consultancy <strong>of</strong> work worth more than Rs. 70 Crore<br />
Project Cost Value conducted in the last 10 years.<br />
-----20<br />
(b) No. <strong>of</strong> supervision Consultancy projects in which more than 50 engineers deployed<br />
for supervision in a single Project in the last 10 years<br />
----- 20<br />
___________<br />
Total 40 points<br />
(ii) Adequacy <strong>of</strong> the proposed work plan and methodology in responding to the<br />
TOR<br />
(a) Understanding TOR 5<br />
(b) Work Programme and Manning Schedule 5<br />
…………………………<br />
Total 10<br />
(iii) Qualification and competence <strong>of</strong> the key staff for adequacy <strong>of</strong> the<br />
Assignment 50<br />
SL. No. Key personnel Points<br />
1 Team Leader 40<br />
2 Structural Design Expert-1 20<br />
3 Structural Design Expert - 2 20<br />
3 Quality Assurance cum Material Engineer 20<br />
Total<br />
100<br />
15