30.01.2013 Views

Building Construction Department Govt. of Bihar - State Health ...

Building Construction Department Govt. of Bihar - State Health ...

Building Construction Department Govt. of Bihar - State Health ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The number <strong>of</strong> points to be given under each <strong>of</strong> the evaluation criteria are:<br />

(i) Firms relevant experience<br />

Points<br />

(a) No <strong>of</strong> years in which supervision Consultancy <strong>of</strong> work worth more than Rs. 70 Crore<br />

Project Cost Value conducted in the last 10 years.<br />

-----20<br />

(b) No. <strong>of</strong> supervision Consultancy projects in which more than 50 engineers deployed<br />

for supervision in a single Project in the last 10 years<br />

----- 20<br />

___________<br />

Total 40 points<br />

(ii) Adequacy <strong>of</strong> the proposed work plan and methodology in responding to the<br />

TOR<br />

(a) Understanding TOR 5<br />

(b) Work Programme and Manning Schedule 5<br />

…………………………<br />

Total 10<br />

(iii) Qualification and competence <strong>of</strong> the key staff for adequacy <strong>of</strong> the<br />

Assignment 50<br />

SL. No. Key personnel Points<br />

1 Team Leader 40<br />

2 Structural Design Expert-1 20<br />

3 Structural Design Expert - 2 20<br />

3 Quality Assurance cum Material Engineer 20<br />

Total<br />

100<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!