Capital Programme <strong>2012</strong>/2013<br />
Total Cost<br />
$<br />
Roads<br />
Bus Bays-121 Seven Mile Beach Road and 208/216 Acton Road 40,000<br />
Rosny Bus Mall - traffic management works 120,000<br />
Howrah Rec Centre Overflow Car Park 88,000<br />
Multi Story Car park Rosny Park - Concept investigation 15,000<br />
Car Park <strong>Clarence</strong> Street as per DA for 4a <strong>Clarence</strong> Street 168,250<br />
Dampier St Soccer Field Car Park Sealing 30,000<br />
Begonia Street/Flagstaff Gully Intersection - Construct Traffic Calming measure 40,000<br />
Esplanade, Lindisfarne - Multiuser pathway - Stage 2 300,000<br />
<strong>Clarence</strong> Street Cycle Way/Multi User Path - Bellerive to Howrah. Undertake<br />
community consultation 20,000<br />
Bicycle U frames 5,000<br />
Construction of Multi User path Tasman Highway - Stage 2 from Conara Road to<br />
Riawena Road. 150,000<br />
Install DDA compliant ramps various 45,000<br />
Installation of kerb ramps various 20,000<br />
Installation of kerb ramps - pedestrian refuge 20,000<br />
Monaco Place - Rock fall fencing 6,000<br />
Seven Mile Beach footpaths 177,000<br />
Rural Footpath - Seven Mile Beach to Cambridge, Stage 2 - Estate Drive to<br />
Cambridge 230,000<br />
Replace aged kerb and gutter - various 50,000<br />
Footpath/Kerb and Gutter Remediation Program 1,200,000<br />
Gravel Road Sealing - Napoleon St Richmond 20,000<br />
South Arm - seal exist gravel road to jetty and provide footpath 35,000<br />
Kangaroo Bay-construct signalised intersection Alma Street/Cambridge Road -<br />
including temporary connection to Kangaroo Bay Drive 516,000<br />
Queen Street, centre median kerb and gutter replacement between Crown and<br />
Petchy Streets 75,000<br />
Road Reseal Program 1,750,000<br />
Replace treated pine retaining walls with masonry retaining wall near frontage of no<br />
204 Tranmere Road 40,000<br />
Major Digouts/ Reconstruction - Annual Program 3,500,000<br />
Grange Road West - Seal the gravel car park and landscaping of surrounds 20,000<br />
Laneway Sealing 40,000<br />
Construct a walking track along <strong>Council</strong> reserve from 141 Tranmere Road to 580<br />
Oceana Drive 21,000<br />
Install traffic island corner Tilanbi and Yarram Streets 15,000<br />
TOTAL $8,756,250<br />
Stormwater<br />
Drainage Minor Construction 52,000<br />
Pipe open drain at 141 Tranmere Road 31,000<br />
Stormwater Upgrade from the National Fitness Centre car park to Montagu Bay<br />
Road 215,000<br />
Install new headwall and silt trap outside 504 Cambridge Road 7,000<br />
Cremorne Stormwater Drainage Improvement Works 180,000<br />
Oscars Place Stormwater extension 50,000<br />
Upgrade existing 150 mm dia stormwater main in Correa Street 15,000<br />
Lauderdale Oval - drainage works 30,000<br />
Simmons Park - Beach Road Outfall 125,000<br />
Replace the existing 100 dia Stormwater line with 225 dia line at 37 Esplanade<br />
Lindisfarne 12,000<br />
Risdon Vale Rivulet - Stage 2 - creek remediation 64,000<br />
Page 4