30.01.2013 Views

PELAN PENGURUSAN PERSISIRAN PANTAI BERSEPADU ...

PELAN PENGURUSAN PERSISIRAN PANTAI BERSEPADU ...

PELAN PENGURUSAN PERSISIRAN PANTAI BERSEPADU ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PUTRA KONSULT<br />

JABATAN PENGAIRAN DAN SALIRAN<br />

<strong>PELAN</strong> <strong>PENGURUSAN</strong> <strong>PERSISIRAN</strong><br />

<strong>PANTAI</strong> <strong>BERSEPADU</strong><br />

(INTEGRATED SHORELINE MANAGEMENT<br />

PLAN) PULAU PINANG<br />

Taklimat kepada Kerajaan Negeri Pulau<br />

Pinang/ Stakeholders<br />

22 Mei 2008<br />

ANGKASA CONSULTING<br />

SERVICES SDN BHD<br />

DHI KONSULT SDN.<br />

BHD.


Objectives of Presentation<br />

• Explain what is ISMP<br />

• Why ISMP is critical in the management of<br />

Penang’s shorelines<br />

• Request Penang Government and departments<br />

to assist JPS & consultants in the study<br />

especially in providing key data<br />

• Importance for the Penang Government to adopt<br />

the recommendations of the ISMP & to<br />

implement them in tandem with Penang<br />

Structural Plan and Local Plans in managing the<br />

coastal resources of Penang


� What and why ISMP?<br />

� Objectives and scope of ISMP Penang<br />

� Study approach & methodology<br />

� Coastal issues affecting Penang &<br />

preliminary findings<br />

� Preliminary strategic proposals<br />

� Implementation schedule and status<br />

� Expected output (ISMP Penang)


What is ISMP??<br />

Integrated Shoreline Management Plan<br />

Pelan Pengurusan Persisiran Pantai<br />

Bersepadu


ZON <strong>PANTAI</strong> MALAYSIA<br />

Selat Melaka<br />

Semenanjung Malaysia<br />

Laut Cina Selatan<br />

Sarawak<br />

Total land area : 329,293 sq km<br />

Length of coastline : 4,809 km<br />

Sabah<br />

National Coastal Erosion Study (1986)<br />

1,372 km (28%) faced erosion problem !!


Beach<br />

Erosion<br />

Status in<br />

Penang<br />

Kategori I<br />

(42.4 km)<br />

Kategori II<br />

(19.7 km)<br />

Kategori III<br />

(1.1 km)


Kategori I – Hakisan Kritikal<br />

� kegiatan ekonomi dijejas<br />

� memusnahkan harta benda dan kemudahan awam<br />

� Tindakan segera perlu diambil<br />

Pantai Sabak Kerian, Perak Pantai Manikar, Labuan


Hakisan Kategori I di Pulau Pinang<br />

Some areas experiencing Erosion Category I


Hakisan Kategori II – Hakisan Ketara<br />

� Belum sampai tahap kritikal<br />

� Impak terhadap kegiatan ekonomi dan harta<br />

benda adalah kurang<br />

Pantai Tk Kemang, Port Dickson


Hakisan Kategori III<br />

� Menghadapi masalah hakisan tetapi kawasan<br />

belum lagi dimajukan atau didiami


1. Currently approx. 30% of Malaysian coastlines under various stages or<br />

threat of erosion<br />

2. properties and livelihoods lost or threatened<br />

3. In Penang most of the economic developments occur in the coastal zone<br />

> therefore, very critical to properly manage the shorelines<br />

4. Many studies and reports in the past<br />

> adhoc, very specific & localized (need a more regional approach)<br />

5. Gov & Dept need guidelines to:<br />

- make informed decisions on coastal matters<br />

- better manage the coastal zone of Penang to ensure sustainable<br />

development<br />

* holistic guidelines encompassing engineering, town planning & landuse,<br />

socio- economics & environmental considerations are required *


Objectives of ISMP<br />

1. Formulate guidelines to effectively managed<br />

the coastlines of Penang<br />

2. Assist Penang Gov/ dept in making informed<br />

decisions<br />

3. Improve & enhance quality of tourist beaches<br />

** ISMP is to supplement Structural Plan and Local<br />

Plans not supplant them


Main Scope of ISMP for Penang<br />

� reappraise & re-categorize coastline erosion status under<br />

National Coastal Erosion Study 1985<br />

� coastal erosion control: formulate options, assess impacts<br />

& recommend optimum erosion control measures<br />

� formulate & select most appropriate coastal development<br />

management strategies for the shoreline<br />

� formulate specific guidelines for development activities<br />

along the shoreline<br />

� formulate Beach Beautification and Restoration Plan for<br />

key areas<br />

� set up spatial and non-spatial information management<br />

system


Organizational<br />

Structure<br />

Stakeholders<br />

Engagement thro’<br />

KKPG<br />

Natural<br />

Environment<br />

Consultant<br />

Human Environment Consultants<br />

-Land use planner<br />

-Socio -economist<br />

-Tourism<br />

State Planning Committee<br />

Coordination Committee<br />

YBs<br />

State agencies<br />

NGOs<br />

ISMP Consultants<br />

PK/ ACS/ DHI<br />

Coastal Engineers &<br />

Hydrodynamic Modeler<br />

Legal & Institutional<br />

Beach Beautification<br />

and Restoration<br />

Consultant<br />

Info Management<br />

System Consultant


Approach & Methodology<br />

Phases of<br />

ISMP<br />

Phase 1 –<br />

Data<br />

Collection and<br />

Analysis<br />

Phase 2<br />

Management<br />

Unit<br />

Phase 3<br />

ISMP<br />

Formulation<br />

Output Reports Stakeholder<br />

Consultation<br />

Results of data collection<br />

and analysis carried out<br />

Set management<br />

objectives for the<br />

shorelines<br />

•Shoreline classification<br />

•Coastal defense options<br />

•Coastal development<br />

management strategies<br />

KKPG = Kumpulan Kerja Pengurusan Garispantai<br />

Inception Report<br />

Interim Report<br />

Phase 1 Report<br />

Phase 2 Report<br />

(draft)<br />

Phase 2 Report<br />

(Final)<br />

KKPG #1<br />

KKPG #2<br />

Draft ISMP Report KKPG #3


Coastal Defense Options<br />

ii.Do nothing<br />

iii.Hold existing profile<br />

iv.Advance existing coastline<br />

v.Retreat existing coastlines<br />

Coastal Development Management Strategies<br />

iii.Protected<br />

iv.Development prohibited<br />

v.Development restricted<br />

vi.Development with setback<br />

vii.Urban development<br />

viii.Resort development


Example of coastal defense measures: Rock Revetment


Example of coastal defense measures: Concrete Slab


Example of coastal defense measures: Groyne


Example of coastal defense measures: Breakwaters


STAKEHOLDER CONSULTATION<br />

Kumpulan Kerja Pengurusan Garispantai (KKPG)<br />

Objectives<br />

� to gauge community responses and to encourage greater public<br />

participation.<br />

Participants<br />

� Government departments<br />

� NGOs<br />

� Other stakeholders – fishermen groups, etc<br />

Phase 1 KKPG<br />

� To obtain additional information and solicit views to help formulate<br />

the strategies<br />

Phase 2 and Phase 3 KKPG<br />

� provide a forum for stakeholders to voice their opinions and<br />

concerns and to express their support or objection for certain<br />

options.


P6=7.2km<br />

P5=19.7km<br />

P4=5.1km<br />

P7=12.5km<br />

P Kendir<br />

PSS3 = 3.4km<br />

9 cells on Island<br />

PENANG<br />

ISLAND<br />

P3=16.2km<br />

P Rimau<br />

P1=15.6km<br />

P2=30.9km<br />

P8=10.6km<br />

P Jerejak<br />

PSS2 = 3.6km<br />

M1=23.7km<br />

P Gedong<br />

P Aman<br />

P9=8.9km<br />

Length of Cells<br />

Mainland = 66.4km<br />

Island = 126.7km<br />

Small Islands = 8.3km<br />

Total = 201.4km<br />

M2=42.7km<br />

2 cells on Mainland


Scope of ISMP VS Scope of ICZM<br />

Integrated River<br />

Basin Management<br />

Land<br />

River system<br />

Integrated<br />

Shoreline<br />

Shoreline<br />

Management<br />

Sea<br />

Marine Management


Spatial Limit of ISMP<br />

LAND<br />

≈ 1 km<br />

Shoreline<br />

≈ 3 nautical miles<br />

SEA


Examples of coastal<br />

management issues in<br />

Penang


Gurney Drive<br />

* Siltation / mudflat problem<br />

* Water quality problem<br />

Coastal Management Issues (Cell P1)


Weld Quay &Church Street Pier<br />

& Marina<br />

* Siltation Problem<br />

Sg Pinang<br />

*Water pollution<br />

Channel b/w Penang Island & P Jerejak<br />

*Siltation problem<br />

* Water quality pollution from rivers<br />

Coastal Management Issues (Cell P2 & P8)


Kg Pasir Panjang<br />

•Beach erosion<br />

Gertak Sanggul<br />

* Water quality problem<br />

Teluk Kumbar<br />

*Beach erosion<br />

*Siltation at Sg Batu river mouth<br />

*Sg Bayan Lepas bank erosion<br />

problem<br />

Coastal Management Issues (Cell P3 & P4)


Sg Pinang<br />

*Encroachment of<br />

aquaculture into mangrove<br />

areas<br />

Pulau Betong<br />

*Encroachment of<br />

aquaculture into mangrove<br />

areas<br />

Coastal Management Issues (Cell P5)


Muka Head<br />

* Water pollution from<br />

offshore disposal site on<br />

coastlines to be<br />

assessed<br />

Batu Feringghi<br />

•River pollution<br />

(Sg Satu, Sg Mas, Sg Bt<br />

Feringghi)<br />

* River mouth closure<br />

Coastal Management Issues (Cell P6 & P7)


Pantai Molek /Taman<br />

Robina<br />

* Mudflat<br />

Kuala Sg Tembus<br />

•River mouth siltation<br />

Kuala Sg Endin<br />

* Coastal Siltation<br />

* River mouth siltation<br />

* River bank erosion<br />

Sg Abdul & Padang Benggul<br />

* River mouth siltation<br />

* Coastal Siltation<br />

Pantai Bersih<br />

* Beach erosion<br />

Coastal Management Issues (Cell M1)


Kuala Sg Juru<br />

* Siltation problem.<br />

* Water quality pollution<br />

Coastal Management Issues (Cell M2)


Regional<br />

impacts of<br />

major<br />

developments<br />

on coastal<br />

processes to<br />

be assessed<br />

in the ISMP<br />

Airport Extension<br />

Seri Tanjung Pinang<br />

Tuna Port<br />

Expansion<br />

Bayan Mutiara, Jelutong WF &<br />

Middlebank<br />

Site D (PDC)<br />

Bandar Cassia , Batu Kawan<br />

Proposed 2nd link Bridge


Preliminary Findings and Generic Issues<br />

1. Modification of coastal hydrodynamics<br />

- reclamation projects alters coastlines<br />

- Changes to coastal processes<br />

- Regional impacts:<br />

- Erosion<br />

- Siltation<br />

- Water quality<br />

- Marine/ aquatic biological system<br />

- tourism<br />

siltation<br />

erosion


Preliminary Findings and Generic Issues (cont)<br />

1. Good Coastal Management to ensure harmonious & sustainable<br />

development in coastal zone<br />

- Penang is one of most developed states<br />

- northern growth centre<br />

- manufacturing, tourism, trade & commerce<br />

- logistic hub in NCER (international airport, port, highways, railways, etc)<br />

- future growth of Penang – depends on maintaining its competitive edge<br />

- major constrains to Development<br />

- land scarcity<br />

- no room for expansion along the coast and hilly inland<br />

- Land reclamation has become more common in recent years<br />

- changes coastal processes<br />

- clearing of mangrove & other environmentally sensitive areas<br />

Balance between development and preservation to achieve harmonious<br />

& sustainable development


Preliminary Findings and Generic Issues (cont)<br />

3. Need for Sustainable Management of Coastal Areas in the Key<br />

Development Corridors<br />

Two key development<br />

corridors under PSP<br />

Demand for land on<br />

east coast of PI &<br />

some parts of SP will<br />

continue to persist<br />

Sustainable coastal<br />

management is<br />

necessary<br />

Penang Island<br />

key development<br />

corridor<br />

Mainland key<br />

development<br />

corridor


Preliminary Findings and Generic Issues (cont)<br />

4. Environmental Issues<br />

i. Need to protect Coastal Habitats<br />

- loss of coastal habitats (mangroves, mudflats, seagrass<br />

beds & turtle nesting beaches<br />

- significant loss of mangrove areas 1959 to 2005<br />

(DANCED)<br />

- need for ensure greater protection: some mangrove areas<br />

are not gazetted as reserve<br />

- at risk of being developed & damaged unless protected<br />

- impact livelihood fishing community


Preliminary Findings and Generic Issues (cont)<br />

4. Environmental Issues (cont)<br />

ii. River Mouths & Coastal Siltation<br />

-serious problem e.g Sg Batu Feringgi, Gurney Drive and at<br />

Church Street Marina<br />

-navigation problem (fishermen livelihood)<br />

-expensive maintenance – routine dredging some times daily<br />

iii. Coastal erosion<br />

- e.g. Pantai Bersih, Teluk Kumbar<br />

iii. Water Pollution<br />

-From urban discharges & runoff (residential, commercial,<br />

industrial)<br />

-High suspended sediment concentration<br />

-decline in fish resources, loss of aesthetic values and<br />

recreational fishing, health risk


Preliminary Findings and Generic Issues (cont)<br />

5. Institutional and Legal Issues<br />

� Definition of “shoreline” and “state coastal waters” to be<br />

duly considered and adopted by State Gov<br />

� No legislation which specifically addresses issues related<br />

to coastal zone or shoreline either at Fed or state level.<br />

� Adverse impact of reclamation may be addressed through<br />

EIA and DOE Guideline but with limitations<br />

� Most local authorities do not have funds or staff dedicated<br />

for shoreline management. No by laws for control of<br />

activities on shoreline or coastal areas<br />

� Enforcement capacity among agencies is limited.


Preliminary Findings and Generic Issues (cont)<br />

5. Institutional and Legal Issues (cont)<br />

� Land based sources of pollution are generally the major<br />

cause of water pollution. Current measures are inadequate<br />

to control non point sources of pollution particularly oil and<br />

grease, food waste and solid waste/litter<br />

� State agencies carrying out infrastructure works should<br />

undertake an EIA before implementation to reduce any<br />

adverse impacts<br />

� No laws to preserve, maintain and control the use of<br />

recreational beaches and spaces along the shoreline.


Preliminary Findings and Generic Issues (cont)<br />

5. Institutional and Legal Issues (cont)<br />

� Many agencies are involved with specific functions & responsibilities of<br />

managing shoreline. However no agency is overall responsible or have<br />

authority. This has led to a lack of focus, expertise and capacity within the<br />

State to address the coastline and the sea which are prime assets<br />

� ISMP is Fed Gov’s initiative to improve shoreline management. State Gov<br />

participation is vital for success<br />

� The Penang State Structure Plan contains some recommendations related to<br />

shoreline management. This should be buttressed with well defined policies<br />

and action plans by the State Government<br />

� None of the current inter agency committees appears to be mandated<br />

specifically to address issues related to shoreline management<br />

� Poor or a total lack of enforcement is a major weakness which must be<br />

addressed in a holistic manner.<br />

� Stakeholder participation is important and must be further encouraged for<br />

better and more effective implementation of plans and projects.


Preliminary Strategic Proposals<br />

� Develop clear & specific guidelines on reclamation works<br />

� Integrate Local Plans with ISMP management strategies<br />

� Gazette Environmentally Sensitive Areas as Protected Areas<br />

� Identify & limit future reclamation works to allowable sites<br />

� Review and improve categorization of coastal erosion category<br />

under the NCES<br />

� Adopt precautionary approach in coastal management and<br />

planning<br />

� Undertake beach beautification & restoration at identified<br />

recreational beaches<br />

� set up specific guidelines to protect, conserve and enhance all<br />

recreational beaches<br />

� Streamline existing legislations & remove overlaps<br />

� Improve inter-agency and departmental coordination on coastal<br />

management


Data Collection and Analysis<br />

IMSP<br />

Coastal hydrodynamic modeling<br />

Coastal Engineering<br />

Human Environmental<br />

Natural Environmental<br />

Landuse<br />

Legal & institutional<br />

Socio-economic<br />

Archeological & heritage<br />

Recreational & tourism<br />

Beach Beautification & Restoration Plan<br />

ISMP Info Database & ICT Infra Setup<br />

Setting Coastal Mgmt Objectives<br />

Defining Coastal Developmt Strategies<br />

Defining guidelines & policies<br />

Stakeholder Inception Report Consultation, Workshop & Seminars J<br />

Reporting<br />

monthly report<br />

Interim Report<br />

D<br />

Phase Reports 1 Report (Data collection And Analysis) Inception report<br />

Phase 2 Report (Draft Management Objectives)<br />

Phase 2 Report (Final Management Objectives)<br />

ISMP Report ( Draft)<br />

Data Collection And Analysis Ph2 MU Ph3 – ISMP<br />

Data 2007 Collection & Analysis 2008 Ph 2008 2 MU Ph3 2008 - ISMP<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18<br />

J A S O N D J F M A M J J A S O N D<br />

ISMP Report ( Final)<br />

A<br />

A<br />

M<br />

Interim report<br />

FGD 1<br />

J<br />

Ph 1 Rep (Data collection & Analysis)<br />

J FGD 2<br />

Ph 2 Rep (Drft Mgmt Objectives)<br />

A Ph 2 Rep (Fnl Mgmt Objtv)<br />

N<br />

D<br />

ISMP Draft<br />

FGD 3


Completed or on-going ISMPs<br />

- Pahang (pilot ISMP)<br />

- Negeri Sembilan<br />

- Labuan<br />

- Melaka<br />

- Penang


Pilot ISMP<br />

Pahang<br />

Tg. Berhala<br />

Kuantan Port<br />

Breakwater<br />

MUs<br />

Kuala Pahang<br />

Sub<br />

Cell 1<br />

Sub<br />

Cell 2<br />

Cell<br />

C1<br />

C2


Teluk Cempedak to Tg. Lumpur Coastal Area<br />

Coastal<br />

Development<br />

Management<br />

Strategies


MU 106<br />

FORESTED REGION BETWEEN TG.<br />

PELINDUNG AND TG. PELINDUNG<br />

TENGAH<br />

(MU 106)


FORESTED REGION BETWEEN TG. PELINDUNG AND TG. PELINDUNG TENGAH<br />

(MU 106)<br />

LP PROPOSAL: PROPOSED MEDIUM DENSITY TOURISM<br />

ISMP PROPOSAL : PROMOTED DEVELOPMENT OF HIGH DENSITY TOURISM<br />

PERMITTED DEVELOPMENT CLASS 1


MU 46<br />

HOMESTEAD BEACH RESORT<br />

(MU 46)


HOMESTEAD BEACH RESORT<br />

(MU 46)<br />

LP PROPOSAL : PROPOSED MEDIUM DENSITY TOURISM<br />

ISMP PROPOSAL: STANDARD DEVELOPMET OF LOW / MEDIUM<br />

DENSITY TOURISM<br />

PERMITTED DEVELOPMENT CLASS 2


MU 112<br />

HYATT KUANTAN (MU 122)


HYATT KUANTAN<br />

(MU 112)<br />

LP PROPOSAL: PROPOSED HIGH DENSITY TOURISM<br />

ISMP PROPOSAL: RESTRICTED DEVELOPMENT OF HIGH DENSITY<br />

TOURISM - CARRYING CAPACITY REACHED<br />

PERMITTED DEVELOPMENT CLASS 3


MU 125<br />

KG. TG LEMBAH CENTRAL<br />

(MU 125)


KG. TG. LUMPUR CENTRAL<br />

(MU 125)<br />

LP PROPOSAL: PROPOSED MAIN BUSINESS CENTER OF TG. LUMPUR<br />

ISMP PROPOSAL: RESTRICTED DEVELOPMENT OF INFRASTRUCTURE<br />

REQUIRING COASTAL PROTECTION.<br />

PERMITTED DEVELOPMENT CLASS 3


MU 115<br />

TANJUNG TEMBELING (MU<br />

– 115)


TG. TEMBELING<br />

(MU 115)<br />

LP PROPOSAL: PROPOSED HIGH DENSITY TOURISM<br />

ISMP PROPOSAL: ENVIRONMENTAL PROTECTION (HEADLAND FOREST)<br />

PROHIBITED DEVELOPMENT


Turtle Bay Beach Motel<br />

Pusat Penerangan &<br />

Sanctuari Penyu<br />

Tg. Cerating<br />

Club Med<br />

Tg. Batu Pak Mok<br />

Oblique Aerial Photo No. 045<br />

Club Med


Komleks Pelancongan<br />

Teluk Cempedak<br />

Sri Pantai<br />

Hotel TC & Hillview<br />

Hotal Kuantan Hyatt<br />

Merlin (abandoned)<br />

Tg. Pelindung Tengah<br />

Tg. Tembeling<br />

Oblique Aerial Photo No. 196<br />

Hyatt


Summary<br />

• the ISMP is an integrated and holistic study<br />

taking into account coastal engineering,<br />

environmental, town planning, socio-economic,<br />

legal, landscaping requirements<br />

• useful tool to assist the gov & dept to better<br />

manage the Penang shoreline<br />

• All concerned parties are urged to participate in<br />

the stakeholders consultation<br />

• Cooperation of the various dept in cooperating<br />

and providing key data is vital<br />

• To implement and abide by the strategies<br />

recommended in the ISMP


THANK YOU


Church Street Marina<br />

back


Tuna Port,<br />

Batu Maung<br />

b<br />

a<br />

c


Sg Pinang<br />

back


Teluk Kumbar Beach back


Sg Gertak Sanggul<br />

Beach Near Gertak Sg Sanggul<br />

Sg Gertak Sanggul river mouth<br />

back


Kg Pasir Panjang<br />

back


Aquaculture Sg Pinang back


River Mouth Closure at Batu Feringghi<br />

back<br />

Slide 25


Beach erosion Pantai Bersih<br />

back


Siltation at Mooring<br />

Facilities south Kuala<br />

Muda<br />

back


River siltation<br />

at Kuala Sg. Endin<br />

River mouth siltation<br />

Kuala Sg Tembus<br />

back<br />

Slide 26


ack<br />

Mudflat at<br />

Taman Robina


Siltation at Sg Abdul River Mouth<br />

back


Kg Batu Kawan<br />

back

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!