L -^ ] REGULAR BOARD MEETING FEBRUARY 17, 1993 TOWN HALL 7:30 P.M. Supervisor Kennedy asked the Town Clerk to draw up a letter to our Legislatures indicating our concern with the proposal that has been offered by Governor Mario Cuomo. Letter from Rolfe S. Porter, Executive Engineer, Erie County Water Authority. Re: Hickory Meadows Subdivision Town of Boston. It is our conclusion from test results that we cannot approve service to a portion of the proposed subdivision. These facts have been conveyed to the consulting engineer and have discussed the test results with Hr. Bob Pettit. Supervisor Kennedy commented that when the Board approved the Hickory Meadows Subdivision that it was brought to our attention by Councilman Flowers that he was concerned with the water pressure at the southern end of the community. We also, have had this same report from the Boston Fire Department. Town Attorney Perley commented that it is the developers responsibility to satisfy the Planning Board that there is water available. There are standards within the Erie County Hater Authority Tariff and the Lease Management Agreement which provide for the Hater Authority to deny service when the Water Authority Main must be appropriate to the service demanded. Supervisor Kennedy, Town Engineer Pettit and I have been working on this problem. Letter received from Haria Martens, Coordinator, E.C. STOP-DWI, Re: 1992 STOP-DWI contract received and on file in the Town Clerk's Office. Letter received from Erie County Department of Environment and Planning, Re: Lower East Hill Road reconstruction, resurfacing. Supervisor Kennedy commented that this letter is notification from the State that the County is going to do the SEQR study on the Lower East Hill Road and they are going to seek a negative declaration. Modifications of the original plans have been made with the same ten foot (10') driving lanes, four foot (4') shoulder. However, the area of disturbances has been reduced by minimizing the shoulder area, which result in deeper ditches. This will result in less trees being cut down and less disruption of shrubbery along the highway and perhaps alleviating some of the concerns of many of the property owners. On February 1, 1993, bids for the Ambulance Garage Addition were publicly opened and read aloud as follows: Contract A: General Contractor Allstate Maintenance Co., Inc. Feddington-Allen, Inc. L.G.T. Construction LCP Construction Corp. KBCC, Inc. The Woodbridge Construction Group, Inc. Engineer's Estimate UlPr'-' •— Base Bid $71,200.00 82,000.00 87,000.00 88,890.00 91,750.00 95,290.00 70,000.00 Alternate $69,700.00 78,100.00 84,000.00 86,000.00 90,750.00 No Bid 68,000.00 1 J y.
f" ,-• •* ( ) REGULAR BOARD MEETING FEBRUARY 17, 1993 Contract B: HVAC Contractor B.H. Refrigeration, Inc. Vastola Htg. & Air Condition Corp. Engineer's Estimate Contract C: Plumbing Contractor G&W Plumbing & Heating Inc. Ackerman & Huebsch, Inc. Matthew Kandefer, Inc. Engineer's Estimate Contract D: Electrical Contractor C.V.M. Electric, Inc. Frey Electric Construction Co., Inc Weydman Electric, Inc. Cannon Electric, Inc. Engineer's Estimate Base Bid $12,950.00 14,870.00 8,000.00 Base Bid $15,780.00 22,689.00 24,475.00 18,000.00 Base Bid $ 8,939.00 9,276.00 9,825.00 11,950.00 9,000.00 TOWN HALL 7:30 P.M. Alternate $12,900.00 13,703.00 8,000.00 Alternate N/A N/A N/A Alternate $ 8,869.00 9,275.00 9,945.00 12,275.00 9,200.00 A motion was made by Supervisor Kennedy and seconded by Councilman Wittmeyer to by-pass Allstate Maintenance Co., Inc. for the reasons described in the document we received from Nussbaumer S Clarke, Inc. Consulting Engineers, and for the reasons that Supervisor Kennedy received from people that Allstate Maintenance Co., Inc. have done work with and award the contract for the Ambulance Garage Addition - Coritract A: General to Feddington-Allen, Inc. the second lowest bidder in the amount of $78,100.00. four (4) Ayes Carried A motion was made by Councilman Wittmeyer and seconded by Councilman Wohlhueter at the recommendation of Nussbaumer & Clarke, Inc. to award the Ambulance Garage Addition - Contract B: HVAC (heating & refrigeration) to B.H. Refrigeration, Inc. in the amount of $12,900.00. four (4) Ayes Carried A motion was made by Councilman Wohlhueter and seconded by Supervisor Kennedy at the recommendation of Nussbaumer & Clarke, Inc. to award the Ambulance Garage Addition- Contract C: Plumbing to G&W Plumbing & Heating, Inc. in the amount of $15,780.00. four (4) Ayes Carried A motion was made by Councilman Wittmeyer and seconded by Supervisor Kennedy at the recommendation of Nussbaumer & Clarke, Inc. to award the Ambulance Garage Addition - Contract D: Electrical to C.V.M. Electric, Inc. in the amount of $8,869.00 four (4) Ayes RESOLUTION 1993 Carried 7 REFUSE & GARBAGE LICENSE MAPLE CITY DISPOSAL SERVICE, INC 1 J J
- Page 19 and 20: REGULAR BOARD MEETING JANUARY 6, 19
- Page 21 and 22: L ^!imMfS7'i9^r Jl, iLuLltliO '"^U.
- Page 23 and 24: REGULAR BOARD MEETING JANUARY 6, 19
- Page 25 and 26: REGULAR BOARD MEETING JANUARY 6, 19
- Page 27 and 28: L_ REGULAR BOARD MEETING JANUARY 6,
- Page 29 and 30: A REGULAR BOARD MEETING JANUARY 20,
- Page 31 and 32: REGULAR BOARD MEETING JANUARY 20, 1
- Page 33 and 34: •y t< REGULAR BOARD MEETING JANUA
- Page 35 and 36: ^S5r??«5 and; 2. Less need to tran
- Page 37 and 38: L TOWN OF BOSTON NOTICE OF ADOPTION
- Page 39 and 40: ^ iuvviM—crr"BUbiuisr^ RESOLUTION
- Page 41 and 42: REGULAR BOAR MEETING JANUARY 20, 19
- Page 43 and 44: "n^JVMVJ RESOLUTION 1993 ""WTSTUN A
- Page 45 and 46: L REGULAR BOARD HEETING FEBRUARY 3,
- Page 47 and 48: L #^'^. 2, (Cont'd.) - TOWN OF BOST
- Page 49 and 50: I REGULAR BOARD MEETING FEBRUARY 3,
- Page 51 and 52: yii L ] REGULAR BOARD MEETING FEBRU
- Page 53 and 54: ' .--'lY^rnSf-, L REGULAR BOARD MEE
- Page 55 and 56: F L REGULAR BOARD HEETING FEBRUARY
- Page 57 and 58: A L -^^ i» REGULAR BOARD HEETING t
- Page 59 and 60: L .yiy.i' '-> REGULAR BOARD MEETING
- Page 61 and 62: L REGULAR BOARD HEETIHG t'EBRUARY 3
- Page 63 and 64: A REGULAR BOARD HEETING FEBRUARY 3,
- Page 65 and 66: L REGULAR BOARD MEETING FEBRUARY 3,
- Page 67 and 68: REGULAR BOARD HEETING FEBRUARY 17,
- Page 69: 1_ BE IT FURTHER RESOLVED, that the
- Page 73 and 74: L 2. (Cont'd.) - TOWN OF BOSTON APP
- Page 75 and 76: m 2. (Cont'd.) - TOWN OF BOSTON - A
- Page 77 and 78: •OTHOa* 1 V ADDITIONAL INSURED EN
- Page 79 and 80: L ] ] REGULAR BOARD MEETING FEBRUAR
- Page 81 and 82: p-SP. -1 REGULAR BOARD MEETIN FEBRU
- Page 83 and 84: L REGULAR BOARD MEETING MARCH 3, 19
- Page 85 and 86: «* REGULAR BOARD MEETING MARCH 3,
- Page 87 and 88: I OWN HT BUS I UN RESOLUTION 1993 -
- Page 89 and 90: L ' C) REGULAR BOARD MEETING HARCH
- Page 91 and 92: n:3 REGULAR BOARD MEETING MARCH 17,
- Page 93 and 94: F REGULAR BOARD MEETING MARCH 17, 1
- Page 95 and 96: REGULAR BOARD MEETING MARCH 17, 199
- Page 97 and 98: •«—»•' L ru VV IN-T^T anbTU
- Page 99 and 100: . V •( REGULAR BOARD MEETING APRI
- Page 101 and 102: A KgSpiiSSg REGULAR BOARD MEETING A
- Page 103 and 104: F L REGULAR BOARD MEETING APRIL 7,
- Page 105 and 106: A REGULAR BOARD MEETING APRIL 7, 19
- Page 107 and 108: A REGULAR BOARD HEETING APRIL 21, 1
- Page 109 and 110: L |] REGULAR BOARD HEETING APRIL 21
- Page 111 and 112: ^A&^&M^^i^^^^^^^^^^^^^^^^^ A L.-' N
- Page 113 and 114: I I Is REGULAR BOARD MEETING .MAY 5
- Page 115 and 116: F A / V ;i REGULAR BOARD MEETING HA
- Page 117 and 118: L ^ym r l_ SECTION 2. That the maxi
- Page 119 and 120: A F Supervisor Kennedy Voting Aye C
L<br />
-^<br />
]<br />
REGULAR BOARD MEETING<br />
FEBRUARY 17, 1993<br />
TOWN HALL<br />
7:30 P.M.<br />
Supervisor Kennedy asked the Town Clerk to draw up a letter to<br />
our Legislatures indicating our concern with the proposal that<br />
has been offered by Governor Mario Cuomo.<br />
Letter from Rolfe S. Porter, Executive Engineer, Erie County<br />
Water Authority. Re: Hickory Meadows Subdivision Town of Boston.<br />
It is our conclusion from test results that we cannot approve<br />
service to a portion of the proposed subdivision. These facts<br />
have been conveyed to the consulting engineer and have discussed<br />
the test results with Hr. Bob Pettit.<br />
Supervisor Kennedy commented that when the Board approved the<br />
Hickory Meadows Subdivision that it was brought to our attention<br />
by Councilman Flowers that he was concerned with the water<br />
pressure at the southern end of the community. We also, have<br />
had this same report from the Boston Fire Department.<br />
Town Attorney Perley commented that it is the developers<br />
responsibility to satisfy the Planning Board that there is water<br />
available. There are standards within the Erie County Hater<br />
Authority Tariff and the Lease Management Agreement which<br />
provide for the Hater Authority to deny service when the Water<br />
Authority Main must be appropriate to the service demanded.<br />
Supervisor Kennedy, Town Engineer Pettit and I have been working<br />
on this problem.<br />
Letter received from Haria Martens, Coordinator, E.C. STOP-DWI,<br />
Re: 1992 STOP-DWI contract received and on file in the Town<br />
Clerk's Office.<br />
Letter received from Erie County Department of Environment and<br />
Planning, Re: Lower East Hill <strong>Road</strong> reconstruction, resurfacing.<br />
Supervisor Kennedy commented that this letter is notification<br />
from the State that the County is going to do the SEQR study on<br />
the Lower East Hill <strong>Road</strong> and they are going to seek a negative<br />
declaration.<br />
Modifications of the original plans have been made with the same<br />
ten foot (10') driving lanes, four foot (4') shoulder. However,<br />
the area of disturbances has been reduced by minimizing the<br />
shoulder area, which result in deeper ditches. This will result<br />
in less trees being cut down and less disruption of shrubbery<br />
along the highway and perhaps alleviating some of the concerns<br />
of many of the property owners.<br />
On February 1, 1993, bids for the Ambulance Garage Addition were<br />
publicly opened and read aloud as follows:<br />
Contract A: General<br />
Contractor<br />
Allstate Maintenance Co., Inc.<br />
Feddington-Allen, Inc.<br />
L.G.T. Construction<br />
LCP Construction Corp.<br />
KBCC, Inc.<br />
The Woodbridge Construction<br />
Group, Inc.<br />
Engineer's Estimate<br />
UlPr'-' •—<br />
Base Bid<br />
$71,200.00<br />
82,000.00<br />
87,000.00<br />
88,890.00<br />
91,750.00<br />
95,290.00<br />
70,000.00<br />
Alternate<br />
$69,700.00<br />
78,100.00<br />
84,000.00<br />
86,000.00<br />
90,750.00<br />
No Bid<br />
68,000.00<br />
1<br />
J<br />
y.