29.01.2013 Views

ABANDONMENT: Dunn Road ABSTRACTS: GENERAL FUND ...

ABANDONMENT: Dunn Road ABSTRACTS: GENERAL FUND ...

ABANDONMENT: Dunn Road ABSTRACTS: GENERAL FUND ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

L<br />

.yiy.i' '-><br />

REGULAR BOARD MEETING<br />

FEBRUARY i. i.'i'n<br />

ruMN .nALL<br />

/ :3L' f .i'l.<br />

.'.narew Forestal: Betore the Bia 1 took a IOOK at the prop-1"<br />

across the street trom Edaie faryse/.. Just to see it l co'"a<br />

acquire gravei that would be suitanie tor the construction ot<br />

our yard which is now located on Hest Hiii <strong>Road</strong>. T.nat material<br />

wnl not meet tne specifications ot t.ie contract. I'm assured<br />

ot that. I nave not tested it independently. I have taken a<br />

looK at it and also looked at other material, and I Know wnat<br />

the requirements ot tne coritract are and that will not meet the<br />

specifications of the contract.<br />

A couple ot comments about the clearing operation. it was a<br />

late contract, it was a late award. As everybody knows snow<br />

tiies early up or. tne hill, Hs aia not nave the opportunity to<br />

carry on very many operations nere. He had to get the tress<br />

down so the utilities companies would be aole to relocate<br />

utilities. That is all we had time to do. He will be going on<br />

with construction in the spring and continue through tne<br />

construction year and on into 1994. Tne way that tne site la<br />

lett currently is just an absolute condition on weather. Ke<br />

were not abie to pursue it, once it got to be inclement weather.<br />

Lisa Rood, 8798 ZimiTierman <strong>Road</strong>: I wouid like to give trie arouna<br />

water expert ana opportunity to expiain how it coula not ariect<br />

weils on the hill.<br />

BOD Vandernorst: The upgrading wells.<br />

Lisa Rooa: Any ot trie wells on that end of the hill. \}si in<br />

reterence how water tables viorx. wnats unaer grcund there, .low ea<br />

a large noie ripped trom the earth coula not afreet scmecne'srjj<br />

well that IS a nait rinie or viiiie away. Teil me how you can go ^<br />

down or up the 21» Expressway atter it has rainea and see water<br />

coming out or tne sides of the ciitts. Hhere viould that water<br />

have been, do you think if that 219 Expressway was not there.<br />

It would still be in tne earth. It would still be in our welis.<br />

I just want to echo the concerns ot everyone else up here on tne<br />

west hill t.hat neea water. That neea the water that is still in<br />

tneir wells. Tnat cannot afford in any way to loose one drop ot<br />

It. I would iiKe you to explain now it can't aftect water.<br />

Uphill or down mil.<br />

Bob Van Der Horst: Basically, the area that 1 surveyed is<br />

mostly in the lower vicinity ot the lower eno ot t.rie property.<br />

As i stated earner the property that is downhill on the other<br />

side ot tne ravine, it is my opinion that the water is not<br />

charged trom this area at all. This project will not have any<br />

attect. The ground water flow in that area would be more from<br />

that area up gradient towards the right area. Now wnat you are<br />

saying basically is, wnat type of attect will I have on the up<br />

gradient wells also. Your ground water from the up gradient<br />

wens IS mostly coming trom above. Then your wells will charge.<br />

Your water on the uphill wens is actually oeing cnargea from<br />

water tnat is up gradient ot this site. Your weiis win be p

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!