29.01.2013 Views

BEM Dec07-Feb08 (Pro.. - Board of Engineers Malaysia

BEM Dec07-Feb08 (Pro.. - Board of Engineers Malaysia

BEM Dec07-Feb08 (Pro.. - Board of Engineers Malaysia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEMBAGA JURUTERA MALAYSIA<br />

BOARD OF ENGINEERS MALAYSIA<br />

KDN PP11720/1/2008 ISSN 0128-4347 VOL.36 DEC 2007 - FEB 2008 RM10.00<br />

<strong>Pro</strong>ject<br />

Financing


2 THE INGENIEUR<br />

Volume 36 Dec 2007 - Feb 2008<br />

8<br />

42<br />

56<br />

64<br />

c o n t e n t s<br />

4 President’s Message<br />

Editor’s Note<br />

Announcement<br />

5 Publication Calender<br />

Cover Feature<br />

6 Private Finance Initiatives – Infrastructure And<br />

Utilities Development<br />

12 Incorporating Facilities Management In PFI <strong>Pro</strong>posals<br />

22 <strong>Pro</strong>fessional Services Export Fund<br />

Update<br />

24 Situations Under Which Internal Plumbing Plan<br />

Approval Can Be Given Though External Plan Not<br />

Approved Yet<br />

Engineering & Law<br />

25 The SCL Delay And Disruption <strong>Pro</strong>tocol: An Overview<br />

Feature<br />

33 Building And Common <strong>Pro</strong>perty Act 2007<br />

41 <strong>Pro</strong>file - The <strong>Malaysia</strong>n Institute <strong>of</strong> Arbitrators<br />

42 Dispute On Arbitrators, Advertising And Ethics<br />

44 Structural Inspection Of Existing Bridges<br />

48 Strata Titles (Amendment) Act 2007<br />

54 An Overview Of The Use Of Explosives For<br />

The Demolition Of Building Structures<br />

60 Disabled People As Stakeholders In A Barrier-Free<br />

Built Environment<br />

Engineering Nostalgia<br />

64 Kuala Lumpur – Major Flood In January 1971<br />

2008 Registration Renewal Notice<br />

Every registered <strong>Pro</strong>fessional Engineer and Engineering<br />

Consultancy practice shall renew their Registration for year 2008.<br />

Please visit www.bem.org.my to download the Renewal Forms.


4 THE INGENIEUR<br />

KDN PP11720/1/2008<br />

ISSN 0128-4347<br />

Vol. 36 Dec 2007- Feb 2008<br />

MEMBERS OF THE BOARD OF ENGINEERS MALAYSIA<br />

(<strong>BEM</strong>) 2007/2008<br />

President<br />

YBhg. Dato’ Sri <strong>Pro</strong>f. Ir. Dr. Judin Abdul Karim<br />

Registrar<br />

Ir. Dr. Mohd Johari Md. Arif<br />

Secretary<br />

Ir. Ruslan Abdul Aziz<br />

Members<br />

YBhg. Tan Sri <strong>Pro</strong>f. Ir. Dr. Mohd Zulkifli Tan Sri Mohd Ghazali<br />

YBhg. Datuk Ir. Hj. Keizrul Abdullah<br />

YBhg. Lt. Gen. Dato’ Ir. Ismail Samion<br />

YBhg. Dato’ Ir. Ashok Kumar Sharma<br />

YBhg. Datuk (Dr.) Ir. Abdul Rahim Hj. Hashim<br />

YBhg. Datu Ir. Hubert Thian Chong Hui<br />

YBhg. Dato’ Ir. <strong>Pro</strong>f. Chuah Hean Teik<br />

Ar. Dr. Amer Hamzah Mohd Yunus<br />

Ir. Henry E Chelvanayagam<br />

Ir. Dr. Shamsuddin Ab Latif<br />

Ir. <strong>Pro</strong>f. Dr. Ruslan Hassan<br />

Ir. Mohd. Rousdin Hassan<br />

Ir. Tan Yean Chin<br />

Jaafar Bin Shahidan<br />

Ir. Ishak Abdul Rahman<br />

Ir. Anjin Hj. Ajik<br />

Ir. P E Chong<br />

EDITORIAL BOARD<br />

Advisor<br />

YBhg. Dato’ Sri <strong>Pro</strong>f. Ir. Dr. Judin Abdul Karim<br />

Chairman<br />

Ir. Tan Yean Chin<br />

Editor<br />

Ir. Fong Tian Yong<br />

Members<br />

Ir. Prem Kumar<br />

Ir. Mustaza Salim<br />

Ir. Chan Boon Teik<br />

Ir. Ishak Abdul Rahman<br />

Ir. <strong>Pro</strong>f. Dr. K. S. Kannan<br />

Ir. <strong>Pro</strong>f. Madya Dr. Eric K H Goh<br />

Ir. Rocky Wong Hon Thang<br />

Executive Director<br />

Ir. Ashari Mohd Yakub<br />

Publication Officer<br />

Pn. Nik Kamaliah Nik Abdul Rahman<br />

Assistant Publication Officer<br />

Pn. Che Asiah Mohamad Ali<br />

Design and <strong>Pro</strong>duction<br />

Inforeach Communications Sdn Bhd<br />

Printer<br />

Art Printing Works Sdn Bhd<br />

29 Jalan Riong, 59100 Kuala Lumpur<br />

The Ingenieur is published by the <strong>Board</strong> <strong>of</strong> <strong>Engineers</strong> <strong>Malaysia</strong><br />

(Lembaga Jurutera <strong>Malaysia</strong>) and is distributed free <strong>of</strong> charge to<br />

registered <strong>Pro</strong>fessional <strong>Engineers</strong>.<br />

The statements and opinions expressed in this<br />

publication are those <strong>of</strong> the writers.<br />

<strong>BEM</strong> invites all registered engineers to contribute articles or<br />

send their views and comments to<br />

the following address:<br />

Publication Committee<br />

Lembaga Jurutera <strong>Malaysia</strong>,<br />

Tingkat 17, Ibu Pejabat JKR,<br />

Jalan Sultan Salahuddin,<br />

50580 Kuala Lumpur.<br />

Tel: 03-2698 0590 Fax: 03-2692 5017<br />

E-mail: bem1@streamyx.com; publication@bem.org.my<br />

Website: http://www.bem.org.my<br />

Advertising/Subscriptions<br />

Subscription Form is on page 58<br />

Advertisement Form is on page 59<br />

<strong>Malaysia</strong> enjoys an early start on Private<br />

Finance Initiatives (PFIs) since the introduction<br />

<strong>of</strong> privatisation projects back in 1983. Most <strong>of</strong><br />

the early PFIs were in economic infrastructure<br />

projects such as highways, independent power<br />

supply and water supply, together with a<br />

few social infrastructure projects. With the<br />

global trend <strong>of</strong> using PFIs, <strong>Malaysia</strong>ns should<br />

capitalise on their expertise to venture beyond our shores for<br />

mega projects in the international market.<br />

It is estimated that East Asia alone requires some US$200<br />

billion annually over the next five years for infrastructure projects,<br />

and many <strong>of</strong> them require some form <strong>of</strong> financing. The scope<br />

for engineers in these areas can be wide and bright. Since PFI<br />

ties the concessionaire to the life cycle cost <strong>of</strong> the projects,<br />

unlike conventional contracts, the facility managers who are<br />

mainly M&E engineers will assume an important role to meet<br />

the KPIs and the bankability <strong>of</strong> PFI projects.<br />

With more mega projects in the pipeline that may involve<br />

PFIs, engineers as part <strong>of</strong> the concessionaire support team should<br />

have sound knowledge <strong>of</strong> the mechanisms <strong>of</strong> PFI. As <strong>Malaysia</strong><br />

positions herself in the international scene for trade, industry<br />

and tourism, the challenges facing the nation in coping with<br />

expanding infrastructures and facilities <strong>of</strong> world class standard<br />

will be opportunities for our engineers. However, these are only<br />

for those who excel technically and managerially.<br />

Dato’ Sri <strong>Pro</strong>f Ir Dr Judin bin Abdul Karim<br />

President<br />

BOARD OF ENGINEERS MALAYSIA<br />

<strong>BEM</strong>’s Publication Committee welcomes on board<br />

the new Committee chairman, Ir Tan Yean Chin and<br />

his new team members.<br />

The year 2007 witnessed some exciting events<br />

that have impacted practising engineers such as<br />

the introduction <strong>of</strong> CCC, OSC, the announcement<br />

<strong>of</strong> economic corridors, revival <strong>of</strong> double tracking projects and<br />

so on. Along with these new delivery systems and projects<br />

announcement, projects financing has taken another cornerstone<br />

with the introduction <strong>of</strong> Private Finance Initiatives (PFI).<br />

This issue with the theme PFI attempts to provide a clearer<br />

insight into the mechanism <strong>of</strong> project financing as engineers can<br />

no longer limit themselves to technical matters in this globalised<br />

market.<br />

In view <strong>of</strong> the impending Act on Disabled Persons that<br />

was recently tabled in the Parliament, an article on Barrier-Free<br />

Environment was introduced as a reminder to pr<strong>of</strong>essionals on<br />

design considerations for the disabled.<br />

To all readers, I wish you a Happy New Year.<br />

Ir Fong Tian Yong<br />

Editor<br />

President’s Message<br />

Editor’s Note


THE INGENIEUR ANNOUNCEMENT<br />

The following list is the Publication<br />

Calendar for the year 2007<br />

- 2008. While we normally seek<br />

contributions from experts for<br />

each special theme, we are also<br />

pleased to accept articles relevant<br />

to themes listed.<br />

Please contact the Editor or the<br />

Publication Officer in advance<br />

if you would like to make such<br />

contributions or to discuss details<br />

and deadlines.<br />

March 2008: POWER<br />

June 2008: ASSET MANAGEMENT<br />

September 2008: ENGINEERING<br />

PRACTISE<br />

December 2008: ENvIRoNMENT<br />

The <strong>Board</strong> <strong>of</strong> <strong>Engineers</strong><br />

<strong>Malaysia</strong><br />

wishes all readers<br />

Happy<br />

New Year<br />

2008<br />

&<br />

Gong Xi<br />

Fa Cai<br />

5


6 COVER FEATURE<br />

THE INGENIEUR<br />

Private Finance Initiatives –<br />

Infrastructure And<br />

Utilities Development<br />

By Lee Yuien Siang, Associate Director, Corporate Finance Practice,<br />

PricewaterhouseCoopers <strong>Malaysia</strong><br />

Pipe laying<br />

Ajoint Asian Development<br />

Bank, Japan Bank for<br />

International Co-operation<br />

and World Bank estimate is that<br />

East Asia alone has infrastructure<br />

needs totalling US$200 billion<br />

a year over the next five years.<br />

A r o u n d t w o - t h i r d s o f t h i s<br />

expenditure needs to be new<br />

investment, with the balance on<br />

upkeep <strong>of</strong> existing assets.<br />

Internationally, including<br />

<strong>Malaysia</strong>, various forms <strong>of</strong><br />

public private partnerships have<br />

been applied to attract private<br />

sector capital and expertise in<br />

developing infrastructure assets<br />

and services. Many construction<br />

companies in selected markets<br />

where infrastructure forms a<br />

sizeable part <strong>of</strong> public sector<br />

procurement have specialised<br />

in developing then selling<br />

investment stakes and retaining<br />

long-term maintenance contracts.<br />

Industry players at all levels can<br />

be involved, from the biggest<br />

Bridge under construction<br />

companies heading consortia to<br />

small, local sub-contractors.<br />

In <strong>Malaysia</strong>, following the<br />

Government’s announcement<br />

<strong>of</strong> the Private Finance Initiative<br />

(‘PFI’) in the Ninth <strong>Malaysia</strong><br />

Plan, a lot <strong>of</strong> discussions have<br />

centred around the investment<br />

and financing aspects <strong>of</strong> PFI. For<br />

the engineering fraternity, what<br />

will PFI mean to them?<br />

The PFI Concept<br />

Similar to many existing<br />

privatisation projects, PFI involves<br />

the public sector contracting with<br />

the private sector to undertake<br />

the designing, building, financing<br />

and maintenance <strong>of</strong> certain<br />

infrastructure over the concession<br />

period which typically lasts<br />

between 25 and 30 years. The<br />

key differentiating feature <strong>of</strong> PFI is<br />

the public sector typically retains<br />

responsibility over public services<br />

delivery – customer interface<br />

function with the public. The<br />

public sector also makes service<br />

payments for the infrastructure<br />

a n d p r e d e f i n e d a s s o c i a t e d<br />

services to the private sector<br />

over the life <strong>of</strong> the concession.<br />

PricewaterhouseCoopers’s report<br />

on ‘Delivering the PPP <strong>Pro</strong>mise’<br />

describes the other feature <strong>of</strong> PFI<br />

being that “the private sector<br />

returns are linked to service<br />

outcomes and performance<br />

<strong>of</strong> the asset over the contract<br />

life. The private sector service<br />

provider is responsible not<br />

just for asset delivery, but for<br />

overall project management and<br />

implementation, and successful<br />

operation for several years<br />

thereafter.”<br />

M a ny c o u n t r i e s i n i t i a l l y<br />

develop PFI in the transport<br />

sector and later extend their<br />

use to other sectors, such as<br />

education, health, energy, water<br />

and waste treatment, once the<br />

value for money benefits are


THE INGENIEUR COVER FEATURE<br />

proven and public sector expertise<br />

is established. Sectors where PFI<br />

may be applicable include:<br />

• Central Accommodation<br />

• Airports<br />

• Defence<br />

• Housing<br />

• Health & Hospitals<br />

• IT<br />

• Ports<br />

• Prisons<br />

• Heavy Railway<br />

• Light Railway<br />

• Roads<br />

• Schools<br />

• Sports & Leisure<br />

• Water, Wastewater & Solid<br />

Waste<br />

So far, known PFI projects<br />

in <strong>Malaysia</strong> have been limited<br />

to those undertaken by PFI<br />

Sdn Bhd, a Ministry <strong>of</strong> Finance<br />

company. The arrangement is<br />

different from the international<br />

PFI framework with limited real<br />

risk transfer to the private sector<br />

since both counter parties to the<br />

contract are Government entities.<br />

Here, the private sector only acts<br />

as construction and maintenance<br />

contractors.<br />

Under PFI, the public sector<br />

transfers the design, construction<br />

and operating risks to the<br />

private sector. In contrast<br />

with traditional Government<br />

procurement, the public sector<br />

does not bear the cost <strong>of</strong> cost<br />

overruns. The public sector<br />

also entrusts the concession<br />

company with the operation and<br />

maintenance <strong>of</strong> the infrastructure<br />

such as schools and hospitals.<br />

The public sector can then<br />

focus on delivering their core<br />

services <strong>of</strong> education and<br />

healthcare. PFI is also not a<br />

deferred payment arrangement<br />

which in the conventional sense<br />

means staggered payments for<br />

assets. Under PFI, payments<br />

are made only when facilities<br />

are available and services are<br />

delivered satisfactorily.<br />

Delivering Better Value<br />

for Money<br />

Value for money is increasingly<br />

at the centre <strong>of</strong> the PFI proposition,<br />

a shift from the earlier days when<br />

it was used mainly to source<br />

private sector financing and to<br />

reduce public sector spending.<br />

Better value for money is driven<br />

mainly by the design <strong>of</strong> the<br />

concession and the payment<br />

mechanisms.<br />

To undertake the concession,<br />

the concession company – a<br />

special purpose vehicle, is<br />

established to create a single point<br />

<strong>of</strong> accountability from the private<br />

sector. This effectively erases<br />

any dispute which commonly<br />

arises in a project - whether it<br />

is the designer, the construction<br />

contractor or the maintenance<br />

contractor who will be responsible<br />

for the defect. The single entity will<br />

be solely accountable, allowing<br />

the Government to quickly seek<br />

rectification and remedy without<br />

having to first determine the<br />

cause <strong>of</strong> the defect.<br />

The concession company<br />

will receive performance-linked<br />

payments for services rendered.<br />

Payments may be withheld or<br />

deducted if the assets were not<br />

available or service performances<br />

7


8 COVER FEATURE<br />

THE INGENIEUR<br />

Dam infrastructure<br />

are not up to pre-agreed service<br />

levels. The purpose <strong>of</strong> this<br />

mechanism is to incentivised<br />

the private sector to take full<br />

responsibility over the assets<br />

and services from the design,<br />

construction, maintenance through<br />

to the provision <strong>of</strong> services.<br />

Under PFI, the public sector<br />

will define the specifications<br />

<strong>of</strong> the infrastructure based on<br />

outcome (output specifications)<br />

rather than input specifications.<br />

Designers will therefore have to<br />

ensure that the facilities are fit<br />

for purpose in terms <strong>of</strong> space<br />

planning, configuration, aesthetic,<br />

ambiance, comfort, etc. This<br />

allows flexibility and room for the<br />

private sector to provide innovative<br />

solutions.<br />

As the concession company<br />

is solely responsible for the<br />

assets and services over the<br />

concession period – typically 25<br />

to 30 years, it will incorporate<br />

a design and construction that<br />

will be cost effective to operate<br />

and maintain (and refurbish or<br />

upgrade as necessary). In other<br />

words, this concept <strong>of</strong> whole-life<br />

costing optimisation will have to<br />

take into account the needs <strong>of</strong><br />

operators including the cost and<br />

ease <strong>of</strong> maintenance during the<br />

design and construction phase.<br />

For conventionally procurement<br />

facilities, the design <strong>of</strong> the facilities<br />

may not have provided for cost<br />

effective facility management.<br />

This is a critical concern since the<br />

lifetime operating and maintenance<br />

costs can be three to four times<br />

the capital costs <strong>of</strong> the assets.<br />

The Argument for PFI<br />

Is there a burning platform<br />

for PFI in <strong>Malaysia</strong>? Various<br />

economic and social sectors<br />

compete for funds to create,<br />

expand and enhance infrastructure<br />

and services vital to the public’s<br />

wellbeing and the country’s<br />

competitiveness, particularly in


THE INGENIEUR COVER FEATURE<br />

education, healthcare and the<br />

environment. PFI provides an<br />

option to expedite development<br />

projects and set a framework for<br />

quality asset lifecycle management<br />

as we do have a distance to<br />

go to attain developed nation<br />

status<br />

PFI provides for an effective<br />

transfer <strong>of</strong> design, construction<br />

and operational risks which<br />

could help avoid defects and<br />

accountability issues similar to<br />

those highlighted concerning the<br />

MRR2 flyover, the Kuala Lumpur<br />

Court Complex and certain<br />

Federal Government buildings in<br />

Putrajaya.<br />

Challenges for Designers<br />

and Builders<br />

While the roles <strong>of</strong> designers<br />

and builders are not different<br />

compared to the traditional<br />

design and build contract,<br />

those involved in PFI projects<br />

faces more challenges as the<br />

concession company’s pr<strong>of</strong>its<br />

are “at risk” throughout the<br />

concession period.<br />

The winning bid will have<br />

to be both innovative and cost<br />

effective. Designers and builders<br />

should adopt proven technology<br />

and construction methods and<br />

ensure that construction is well<br />

executed as the costs <strong>of</strong> delays<br />

and cost overruns will be borne<br />

by them. Materials used should<br />

be durable and easy to maintain.<br />

Energy and utilities management<br />

is fundamental to control the<br />

running costs while ensuring<br />

the assets can function properly.<br />

Space and configuration planning<br />

needs to be well thought through<br />

to ensure operations can be<br />

efficiently carried out in addition<br />

to contributing to the comfort and<br />

safety <strong>of</strong> occupants. Asset and<br />

lifecycle management is critical<br />

to ensure that physical assets<br />

are continuously monitored,<br />

maintained and replaced to<br />

m a x i m i s e t h e i r u t i l i s a t i o n<br />

and minimise disruption to<br />

operations.<br />

While PFI projects can be<br />

a very important source <strong>of</strong><br />

construction and investment<br />

income for many constructors,<br />

they can also be risky. Managing<br />

the risks requires pooling <strong>of</strong><br />

resources and expertise which<br />

commonly requires consortia<br />

a r r a n g e m e n t s m a d e u p o f<br />

c o m p a n i e s s p e c i a l i s i n g i n<br />

construction and construction<br />

management, hard and s<strong>of</strong>t<br />

facilities management and strong<br />

financial investors. Such an<br />

approach could be very relevant<br />

in developing the <strong>Malaysia</strong>n<br />

market.<br />

PFI is not and should not<br />

be the solution to all the issues<br />

we face in procuring public<br />

facilities. It is only as good as<br />

the value for money assessment,<br />

the capabilities <strong>of</strong> the concession<br />

company, and the structuring,<br />

management and enforcement <strong>of</strong><br />

the PFI contract. <strong>BEM</strong><br />

9


12 COVER FEATURE<br />

THE INGENIEUR<br />

Incorporating Facilities<br />

Management In PFI <strong>Pro</strong>posals<br />

Ir. Dr. Zuhairi Abd. Hamid, Construction Research Institute <strong>of</strong> <strong>Malaysia</strong> (CREAM),<br />

Construction Industry Development <strong>Board</strong> <strong>Malaysia</strong><br />

Facilities Management (FM) is an important component in any Private Finance Initiatives<br />

(PFI). FM in <strong>Malaysia</strong> is relatively new and gradually gaining recognition. This paper<br />

highlights the roles <strong>of</strong> FM in PFI context, whole life cycle costing and its relevancy in<br />

the entire construction value chain. Incorporating FM in PFI proposals in the <strong>Malaysia</strong>n<br />

environment should consider models and lessons learned from other country such as<br />

the UK and American perspectives and modified to suit local needs. It is also the<br />

intention <strong>of</strong> this paper to assist client, developer, contractor and financier to better<br />

understand the concept <strong>of</strong> PFI as well as FM when planning both strategies.<br />

A<br />

s t a t e m e n t b y t h e<br />

Deputy Prime Minister<br />

<strong>of</strong> <strong>Malaysia</strong> (now Prime<br />

Minister) who said : “Unless<br />

<strong>Malaysia</strong>ns change their mentality<br />

to become more aware <strong>of</strong> the<br />

need to provide good services<br />

and improve the upkeep <strong>of</strong><br />

buildings, we will forever be a<br />

Third World country with First<br />

World infrastructure” (Badawi,<br />

2001) has stressed the importance<br />

<strong>of</strong> FM in the <strong>Malaysia</strong> context.<br />

Many researchers emphasis<br />

FM as a support function (UCL,<br />

1993; Alexander 1996) to the<br />

organisation, but its role in the<br />

maintenance <strong>of</strong> building facilities<br />

and in property management<br />

are also critical and demanding<br />

(Sarshar, 2000; Underwood and<br />

Alshawi, 2000; Barrett, 1995).<br />

FM represents a field <strong>of</strong> activity<br />

beyond the design, procurement<br />

and furnishing <strong>of</strong> buildings,<br />

that continues into the realm<br />

<strong>of</strong> management skills associated<br />

with the use <strong>of</strong> a facility,<br />

and how that facility evolves<br />

and develops in response to<br />

the changing demands <strong>of</strong> the<br />

occupier (Park, 1998). Others<br />

(Nutt, 2002; Tay and Ooi, 2001)<br />

have taken the definition further<br />

by expanding the scope <strong>of</strong> FM<br />

to cover the entire property<br />

life-cycle <strong>of</strong> designing, building,<br />

financing and operating (Connors,<br />

2003).<br />

Concept behind PFI<br />

PFI projects differ from<br />

traditionally procured public<br />

Feature PFI Conventional<br />

<strong>Pro</strong>curement<br />

Design Public sector client specifies<br />

output required and private<br />

sector consortium provides<br />

design to satisfy requirement<br />

Finance Capital provided by private<br />

sector consortium in return<br />

for a unitary payment from<br />

the public sector client<br />

Construction Construction undertaken by<br />

private sector consortium<br />

Operation and<br />

maintenance<br />

Infrastructure operated and<br />

maintained by private sector<br />

consortium<br />

Services Services provided by public<br />

sector client and/or private<br />

sector consortium<br />

Ownership Ownership reverts to public<br />

sector client or is retained by<br />

private sector consortium<br />

sector projects in a number <strong>of</strong><br />

ways (See Table 1). In a PFI<br />

project the public sector client<br />

specifies the outcomes required<br />

Table 1 Comparison <strong>of</strong> PFI with conventional public sector procurement<br />

Public sector client<br />

specifies design in<br />

conjunction with<br />

external pr<strong>of</strong>essional<br />

advisors<br />

Capital provided by<br />

Exchequer<br />

Construction put out<br />

to competitive tender<br />

to private sector<br />

contractor<br />

Operation and<br />

maintenance by public<br />

sector client or put<br />

out to competitive<br />

tender to private sector<br />

contractor<br />

Services provided by<br />

public sector client or<br />

put out to competitive<br />

tender to private sector<br />

contractor<br />

Infra structure owned<br />

by public sector client<br />

(Dixon et. al,. 2003)


THE INGENIEUR COVER FEATURE 13<br />

Financiers<br />

and a private sector consortium<br />

designs, constructs, finances<br />

and operates the infrastructure<br />

necessary to deliver the outcomes.<br />

It may also deliver services direct<br />

to the public as part <strong>of</strong> the<br />

project (Allen, 2001).<br />

The public sector does not<br />

own the infrastructure but pays<br />

the private sector consortium<br />

a stream <strong>of</strong> unitary payments<br />

to use the infrastructure and<br />

services over the contract period,<br />

normally in the region <strong>of</strong> 25-30<br />

years. At the end <strong>of</strong> this period<br />

ownership <strong>of</strong> the infrastructure<br />

either remains with the private<br />

sector consortium or reverts<br />

to the public sector client,<br />

depending on the terms <strong>of</strong> the<br />

contract (Allen, 2001)<br />

PFI projects typically comprise<br />

three main parties (See Figure<br />

1). The public sector client,<br />

referred to as the awarding<br />

authority, is usually a Government<br />

department, local authority or<br />

other Government agency. The<br />

project company is a special<br />

purpose vehicle (SPV) set up<br />

Awarding Authority<br />

<strong>Pro</strong>ject company<br />

Construction company Consortium<br />

FM provider<br />

Sub-contractor(s)<br />

Investors<br />

Figure 1 Typical PFI project structure (Dixon et. al,. 2003)<br />

by a consortium <strong>of</strong> companies<br />

prepared to assume responsibility<br />

for providing infrastructure and<br />

services to the awarding authority.<br />

Consortia typically consist <strong>of</strong><br />

construction companies, facility<br />

management (FM) providers and<br />

investors. The primary objective<br />

<strong>of</strong> the project company is to<br />

make pr<strong>of</strong>it by minimizing costs<br />

and managing risk throughout<br />

the duration <strong>of</strong> the contract. The<br />

project company may subcontract<br />

responsibility for aspects <strong>of</strong> the<br />

project to third parties (Dixon<br />

et. al, 2003). There are three<br />

main sources <strong>of</strong> finance for PFI<br />

projects:<br />

● Equity funding from institutional<br />

investors,<br />

● Bank loans; and<br />

● Bond issues (Fox and Tott,<br />

1999)<br />

The overriding objective <strong>of</strong> the<br />

financiers is to maximize returns<br />

from their investment by limiting<br />

the project company’s exposure to<br />

risk throughout the project.<br />

Sub-contractor(s)<br />

Private Finance Initiative<br />

(PFI) and Private-Public<br />

Partnerships (PPPs)<br />

In 1992, the UK Conservative<br />

Government introduced the PFI as<br />

a means <strong>of</strong> attracting private sector<br />

investment into public assets<br />

and services (The International<br />

Finance Association, 2002). The<br />

advantages <strong>of</strong> PFI/PPPs have been<br />

the introduction <strong>of</strong> private sector<br />

capital and disciplines into the<br />

provision <strong>of</strong> Government services<br />

which have made it possible<br />

for a larger number <strong>of</strong> projects<br />

to be built, than would have<br />

otherwise been possible without<br />

private sector involvement (The<br />

International Finance Association,<br />

2002). There are no countries<br />

in the world that can undertake<br />

infrastructure projects <strong>of</strong> large<br />

size with their current budgets,<br />

so PFI and PPP are the only real<br />

ways forward (Lenard, 2004).<br />

One <strong>of</strong> the assumed benefits<br />

<strong>of</strong> PFI is that it results in lower<br />

design, construction and operating<br />

costs than conventional public


14 COVER FEATURE<br />

THE INGENIEUR<br />

sector procurement (Stewart and<br />

Butler, 1996). Research suggests<br />

that projects under PFI tend to be<br />

delivered on time and to budget<br />

(Dixon et. al, 2003). A survey<br />

<strong>of</strong> 67 PFI projects by (Ive et al.<br />

2000) found average total cost<br />

savings (comprising design, other<br />

fees, construction, FM and other<br />

operating costs) <strong>of</strong> between 5%<br />

and 10% over conventional public<br />

sector procurement (estimated cost<br />

savings in relation to public sector<br />

comparators or benchmarks used in<br />

the procurement <strong>of</strong> the project).<br />

The public sector is now placing<br />

an increasing reliance on PFI to<br />

deliver better public services (Harris,<br />

2003). The business relationship<br />

between clients and contractors<br />

is changing with the contractor’s<br />

role extending from delivering<br />

facilities to delivering complete<br />

business to clients (Hassan et. al.,<br />

2002). Examining the UK practice<br />

in respect <strong>of</strong> the PFI, it can be seen<br />

that there has been an extension<br />

<strong>of</strong> design and build to include<br />

the maintenance and operation<br />

<strong>of</strong> services, and later transfer <strong>of</strong><br />

the project back to the client<br />

after 25 to 35 years depending<br />

on the concessionaire’s agreement<br />

(Lafford et.al, 2000).<br />

Key Players:<br />

• Owner/Developer<br />

• Architect<br />

• Engineer<br />

• Quantity Surveyor<br />

• <strong>Pro</strong>ject Manager<br />

• Regulatory Body<br />

• Contractor<br />

Research shows that FM is<br />

rarely involved as an integral part<br />

<strong>of</strong> the design process, with the<br />

possible exception <strong>of</strong> PFI (Brown,<br />

2002). The UK Government’s<br />

introduction <strong>of</strong> PFI has brought<br />

together all the key players<br />

in construction, including FM,<br />

under one management team,<br />

which means that fragmentation<br />

issues and lack <strong>of</strong> communication<br />

b e t w e e n t h e c o n s t r u c t i o n<br />

stakeholders should be improved.<br />

In PFI, all the key players are<br />

managed by one consortium with<br />

the directive coming straight from<br />

the owner.<br />

The FM input is therefore seen<br />

as ‘adding value’ to the overall<br />

PFI design <strong>of</strong> both the built and<br />

service products. This situation<br />

has allowed for a much-needed<br />

change in comparison with the<br />

traditional construction approach.<br />

By introducing engineering best<br />

value and longevity into the final<br />

design solution, the PFI consortia<br />

which comprises designer, builder<br />

and operator will ensure that<br />

operational performance is<br />

delivered (Baldwin, 2003).<br />

C o n f l i c t s b e t w e e n k e y<br />

construction players could be<br />

resolved more efficiently internally.<br />

• Owner/Developer<br />

• Architect<br />

• Engineer<br />

• Quantity Surveyor<br />

• <strong>Pro</strong>ject Manager<br />

• Main Contractor<br />

• Architect<br />

• Engineer<br />

• Quantity Surveyor<br />

• <strong>Pro</strong>ject Manager<br />

• Main Contractor<br />

• Sub-contractor<br />

• Construction site<br />

staff<br />

• Construction worker<br />

• Government<br />

Agencies and<br />

Regulatory Bodies<br />

This is not the case in traditional<br />

procurement where many parties<br />

and key players are involved,<br />

as shown in Figure 2. In this<br />

situation, when any disputes and<br />

conflicts arise, the solution has<br />

to be considered as an individual<br />

case at different stages <strong>of</strong> the<br />

construction process where it<br />

actually occurs, and this practice<br />

results in project delays and late<br />

occupancy by the owner.<br />

Lesson Learned from PFI<br />

Practice in the UK<br />

It is crucial to learn from<br />

UK’s or any other country’s<br />

experienced before <strong>Malaysia</strong><br />

embarks to implement PFI. The<br />

author has highlighted some <strong>of</strong><br />

the points gathered by Dixon et.<br />

al (2003) to be considered and<br />

studied.<br />

● <strong>Pro</strong>curement and transaction<br />

costs<br />

High performance costs are<br />

a feature <strong>of</strong> PFI, but should fall<br />

as market mature and greater<br />

standardization is achieved in<br />

processes and documentation.<br />

However, the perception <strong>of</strong> high<br />

initial costs also results from<br />

• Owner/Developer<br />

• Architect<br />

• Engineer<br />

• Quantity Surveyor<br />

• <strong>Pro</strong>ject Manager<br />

• Main Contractor<br />

• Management<br />

corporation<br />

• Government<br />

Agencies and<br />

Regulatory Bodies<br />

• Consumer<br />

Design Tender Construction Facilities<br />

Management<br />

Figure 2 Key Players in the Construction Value Chain


THE INGENIEUR COVER FEATURE 15<br />

failures to evaluate costs against<br />

benefits for the whole life <strong>of</strong><br />

these very long contracts, <strong>of</strong>ten<br />

between 20 and 30 years, and<br />

from failure to compare costs with<br />

traditional procurement or leasing<br />

(Dixon et. al, 2003).<br />

● Risk transfer evaluation<br />

In PFI difficulties valuing risk<br />

transfer have resulted in delayed<br />

take-up and criticisms that the<br />

true costs <strong>of</strong> PFI is disguised by<br />

over-generous assumptions about<br />

risk transfer together with discount<br />

rates that are too high. Improved<br />

techniques are therefore needed<br />

for valuing risk transfer over the<br />

whole life <strong>of</strong> PFI contracts. Whole<br />

life costing techniques are not<br />

well developed and it remains to<br />

be seen if PFI can provide the<br />

spur to improvement (Dixon et.<br />

al, 2003).<br />

● Innovation<br />

PFI is an innovative approach<br />

to outsourcing, but, despite<br />

delivering benefits, it is being<br />

criticized as lack <strong>of</strong> innovation<br />

in specific key areas. PFI has<br />

failed to meet public sector<br />

expectations for innovation in<br />

building design and sustainability.<br />

It is worth to examine the<br />

potential for innovation to meet<br />

these expectations (Dixon et. al,<br />

2003).<br />

● Size <strong>of</strong> contracts<br />

In PFI the large scale and<br />

complexity <strong>of</strong> contracts act<br />

as barriers to market entry by<br />

private sector providers and<br />

reduce market competitiveness.<br />

The market should therefore<br />

benefit from measures to adapt<br />

PFI structure to smaller contracts<br />

suited to SMEs and possibly local<br />

authorities (Dixon et. al, 2003).<br />

● Skills<br />

Difficulties with retaining and<br />

recycling project management<br />

skills in the public sector are<br />

posing a threat to the future<br />

success <strong>of</strong> PFI. Developing and<br />

retaining skills are important to<br />

enable organisations to act as<br />

informed clients for PFI (Dixon<br />

et. al, 2003).<br />

The <strong>Pro</strong>ject Life-cycle<br />

Approach<br />

The project life-cycle approach<br />

has shown FM activities to be<br />

critical. It is common to hear<br />

that building information has<br />

not been passed efficiently from<br />

consultant and contractor back<br />

to the client during the handing<br />

over <strong>of</strong> a construction project.<br />

The organisation is seen to have<br />

two separate sets <strong>of</strong> information<br />

- one before and the other after<br />

the completion <strong>of</strong> construction.<br />

O n e t e a m i s r e s p o n s i b l e<br />

during planning, design and<br />

construction and another team<br />

will be introduced to take over<br />

the operation <strong>of</strong> the building<br />

once construction is completed.<br />

Unfortunately, the document to<br />

be submitted with the as-built<br />

drawing during the handing<br />

over <strong>of</strong> a completed project is<br />

not always defined clearly in<br />

the bill <strong>of</strong> quantities, and it is<br />

frequently reported by the client<br />

that information received about<br />

building components needs to<br />

be redone and updated. This has<br />

resulted in user requirements not<br />

being met and has caused delays<br />

Actual whole life cost percentage<br />

40%<br />

35%<br />

30%<br />

25%<br />

20%<br />

15%<br />

10%<br />

5%<br />

0%<br />

run/maintain 38%<br />

repair 20%<br />

period replacement 10%<br />

and rework to reproduce the<br />

information which was available<br />

earlier and could have been<br />

done in advance if the clear<br />

requirement to do so had been<br />

in the contract specification and<br />

the bill <strong>of</strong> quantities.<br />

Major functions in FM like<br />

maintenance and operation have<br />

<strong>of</strong>ten been ignored in the project<br />

life-cycle costing resulting in<br />

buildings that are too expensive<br />

to maintain. Horvath (1999),<br />

Sarshar (2000), and Underwood<br />

and Alshawi (2000) have proposed<br />

that a project infrastructure<br />

should be properly viewed from<br />

a life-cycle perspective. In this<br />

respect, lack <strong>of</strong> information<br />

and co-operation among the<br />

parties, especially between the<br />

contractor and the designer at<br />

the design stage, are the major<br />

contributors to the problem<br />

<strong>of</strong> maintenance (Underwood<br />

and Alshawi, 2000). This has<br />

resulted in cost over-run and<br />

poor organisational performance<br />

(Teicholz, 2004). In many cases,<br />

operation, maintenance and<br />

end-<strong>of</strong>-life environmental costs<br />

<strong>of</strong> facilities have contributed<br />

to 85% <strong>of</strong> costs occurring after<br />

construction, by outweighing all<br />

initial costs (Scarponcini, 1996).<br />

A study by Teicholz (2004) also<br />

suggested that the design and<br />

risk reserve 8%<br />

disposal 2%<br />

design 4%<br />

Benchmarking cost <strong>of</strong> total ownership<br />

Figure 3 Benchmarking Cost <strong>of</strong> Total Ownership<br />

(Boussabaine et al., 2004)<br />

construction 18%


16 COVER FEATURE<br />

THE INGENIEUR<br />

construction <strong>of</strong> buildings <strong>of</strong>ten<br />

represents less than 15% <strong>of</strong><br />

the total life-cycle cost <strong>of</strong> the<br />

buildings.<br />

Another study by Boussabaine<br />

et al. (2004) gave a slightly<br />

higher percentage <strong>of</strong> the design<br />

and construction life cycle cost<br />

at 22% as shown in Figure 3,<br />

which allows the whole life cycle<br />

cost (WLC) to be compared and<br />

controlled. This benchmarking<br />

cost is a recent guideline for<br />

projects procured using the<br />

PFI route (Boussabaine et al.,<br />

2004).<br />

For efficiency, the project lifecycle<br />

cost should be seen in totality<br />

from design to maintenance. Lifecycle<br />

operations and maintenance<br />

(O&M) and capital renewal costs,<br />

however, almost always comprise<br />

a far greater percentage <strong>of</strong> the<br />

total lifecycle building costs<br />

(Selman, 2004). For example,<br />

decisions made at the design<br />

stage <strong>of</strong> a project could have<br />

significant long-term effects. A<br />

study by Minami (2004) in Japan<br />

suggested that a reduction became<br />

apparent in facilities investment<br />

costs in terms <strong>of</strong> the relationship<br />

between the rebuilding cycle,<br />

rebuilding and repair, by changing<br />

the present rebuilding from 40 to<br />

building additions at age 40, and<br />

rebuilding at age 60.<br />

The way forward taken by the<br />

industry is more integrated, better<br />

exchange <strong>of</strong> data and seamless<br />

c o m m u n i c a t i o n a m o n g t h e<br />

construction players throughout<br />

the lifecycle <strong>of</strong> the project<br />

(Construction 21, 1999; McKinsey,<br />

1995; Lafford et al., 2000).<br />

FM Within the Construction<br />

Industry<br />

Latham (1994) and Egan<br />

(1998) have produced documents<br />

entitled Constructing the team<br />

and Rethinking Construction<br />

respectively, as guidelines for<br />

improving the UK construction<br />

industry. The essence <strong>of</strong> their<br />

initiatives is to bring improvement<br />

to the industry through partnering,<br />

a n d b e t t e r c o m m u n i c a t i o n<br />

by means <strong>of</strong> integrating the<br />

construction value chain. This<br />

approach encourages the seamless<br />

transfer <strong>of</strong> information and better<br />

communication among players<br />

throughout the life-cycle from<br />

design to FM.<br />

Egan (1998) recognised the<br />

need for construction and facilities<br />

managers to work together as part<br />

<strong>of</strong> an integrated team to improve<br />

results to reduce maintenance<br />

expenditure. Teicholz (2004)<br />

identified the need to bridge<br />

the gap between design and<br />

construction, and FM is becoming<br />

<strong>of</strong> critical importance to clients<br />

and is <strong>of</strong>ten raised by industry<br />

players.<br />

Ineffective communication<br />

practices adopted by project<br />

participants throughout the<br />

construction life-cycle (Emmerson,<br />

1962; Banwell, 1964; Higgins and<br />

Jessop, 1965) have contributed<br />

to the productivity decline in<br />

construction. Important information<br />

relevant to FM activities is<br />

frequently missed and not<br />

captured, resulting in unnecessary<br />

reworking to obtain the needed<br />

details. In order to avoid this<br />

situation FM stakeholders and<br />

construction players are required<br />

to discuss and determine the<br />

mechanism for improvement.<br />

Important information on<br />

building structural elements, for<br />

example on the load carrying<br />

capacity <strong>of</strong> columns, load bearing<br />

walls or suspended slabs, must be<br />

recorded in as-built drawings as<br />

digitised or hardcopy and passed<br />

to the client from the contractor<br />

once the building project is<br />

completed. This building element<br />

information is also important in<br />

asset management for example,<br />

when purchasing equipment<br />

and machinery, since facilities<br />

managers need to be able to<br />

ensure that new purchases <strong>of</strong><br />

this kind will actually fit into<br />

the space available and will<br />

be most appropriately and safely<br />

sited from the start, rather than<br />

having to learn by trial and error.<br />

This information must be readily<br />

accessible by the client during the<br />

operation and maintenance <strong>of</strong> the<br />

building when it is required.<br />

Major relevant information not<br />

captured during the construction<br />

stage result in poor FM performance<br />

later. An example is information<br />

on a wall detail drawing presented<br />

in an as-built drawing with<br />

insufficient information on its<br />

design. If the design property <strong>of</strong><br />

the wall is not indicated and it<br />

is not known whether it is a load<br />

bearing wall or a partition wall, it<br />

is difficult to arrive at the proper<br />

decision when renovation work<br />

is required since demolishing the<br />

wall for renovation purposes may<br />

be risky, but on the other hand,<br />

assuming that a partition wall is<br />

actually a load bearing wall will<br />

affect the structural integrity <strong>of</strong><br />

the building if undue pressure is<br />

exerted on it.<br />

C o n s t r u c t i o n - r e l a t e d<br />

information such as information<br />

on building elements is not<br />

for the sole use <strong>of</strong> building<br />

m a i n t e n a n c e a n d p r o p e r t y<br />

management but is also required<br />

during the support function, for<br />

instance in landscaping, furniture<br />

management and environmental<br />

management.<br />

Design, Build, Operate and<br />

Transfer <strong>Pro</strong>curement<br />

The concept <strong>of</strong> the project<br />

life-cycle has made Government<br />

agencies, facilities managers, key<br />

construction players, employers<br />

and clients, all work closely<br />

together to produce better results<br />

throughout the project life-cycle.<br />

Maintenance and operation <strong>of</strong><br />

facilities is <strong>of</strong>ten taken as an<br />

isolated and frequently neglected<br />

aspect in the life-cycle construction<br />

approach. Design, Build, Operate<br />

and Transfer (DBOT) or the PFI<br />

method <strong>of</strong> procurement has<br />

brought together construction<br />

players and FM stakeholders<br />

enabling better communication<br />

that could produce improved<br />

construction services and products


THE INGENIEUR COVER FEATURE<br />

17<br />

<strong>Pro</strong>curement<br />

type<br />

Design, Build,<br />

Operate &<br />

Transfer (DBOT)<br />

or PFI<br />

Design & Build<br />

<strong>Pro</strong>curement<br />

Traditional<br />

<strong>Pro</strong>curement<br />

(Dixon et. al, 2003). Authorities<br />

and contractors will achieve a<br />

successful partnership where<br />

they each meet their respective<br />

objectives over the life <strong>of</strong> the<br />

project (Comptroller and Auditor<br />

General, 2001).<br />

The global trend indicates<br />

that traditional procurement is<br />

being phased out and replaced<br />

by design and build (D&B)<br />

procurement and is gradually<br />

moving towards Design, Build,<br />

Operate and Transfer (DBOT) or<br />

the PFI procurement type which is<br />

seen to provide better integration<br />

as shown in Figure 4.<br />

The strength and benefit <strong>of</strong><br />

DBOT procurement has influenced<br />

many countries in the world to<br />

put it into practice, and as a result<br />

<strong>of</strong> implementing this method, the<br />

Australian construction industry<br />

is witnessing a greater level <strong>of</strong><br />

integration among players across<br />

the construction value chain<br />

(McKinsey, 1995). Similarly, in<br />

Singapore where the Government<br />

has taken initiatives to allow<br />

the integration <strong>of</strong> AEC players<br />

in construction projects at an<br />

Improve integration, communication<br />

Design Tender Construction<br />

Consultant Owner Contractor<br />

Key<br />

Tasks/Activities<br />

Develop<br />

conceptual<br />

designs<br />

Obtain<br />

planning<br />

approvals<br />

Owner/DBOT/PFI Consortium<br />

Consultant/Contractor Owner<br />

Develop tender<br />

specifications<br />

Ascertain bills <strong>of</strong><br />

quantity<br />

Put up invitation to<br />

tender<br />

Submission <strong>of</strong> tender<br />

Evaluation <strong>of</strong><br />

proposals<br />

Award <strong>of</strong> tender<br />

Drawing up contracts<br />

and liabilities<br />

Figure 4 Improve Communication Through <strong>Pro</strong>curement<br />

Obtain various<br />

permits (e.g.<br />

factory permits,<br />

work permits etc.)<br />

Mobilisation <strong>of</strong><br />

resources<br />

Construction<br />

<strong>Pro</strong>ject<br />

management<br />

early stage (Construct 21, 1999),<br />

collaboration between the owner,<br />

the pr<strong>of</strong>essionals and the builders<br />

has been intensified. The use <strong>of</strong><br />

the design-build project delivery<br />

method in Singapore, while<br />

barely 10 years old, has risen<br />

to a 20% share <strong>of</strong> the public<br />

sector construction market, which<br />

in turn dominates the Singapore<br />

construction industry with a 60%<br />

share (Neo, 2001).<br />

Fragmentation is minimised<br />

through DBOT by bringing all<br />

parties on board right from<br />

the onset <strong>of</strong> the construction<br />

project. This allows the seamless<br />

transfer <strong>of</strong> information by cutting<br />

down red tape and paperwork.<br />

Variation orders are carried out<br />

much faster as instruction is given<br />

directly to the DBOT consortium,<br />

unlike in the traditional method<br />

<strong>of</strong> procurement where work is<br />

carried out after going through<br />

many layers, moving first from the<br />

owner who gives the instruction<br />

order to the consultant who later<br />

passes the instruction to the<br />

contractor to carry out the job.<br />

As a result, the delays in giving<br />

Facilities<br />

Management<br />

Owner<br />

Maintain 1-year<br />

defect liability and<br />

structural defect<br />

liability<br />

Carry out remedial<br />

work<br />

Maintenance<br />

management<br />

<strong>Pro</strong>perty<br />

management<br />

Serv<br />

operation<br />

Improve integration, communication<br />

instructions for DBOT projects<br />

are reduced, and projects can be<br />

completed earlier and be ready<br />

for occupancy.<br />

In the maintenance and<br />

operation <strong>of</strong> a building, the<br />

seamless transfer <strong>of</strong> information<br />

and proper sharing are evident<br />

among all the parties within<br />

the management <strong>of</strong> one DBOT<br />

consortium. It is also possible<br />

to transfer relevant information<br />

for the use <strong>of</strong> the organisation’s<br />

support services without difficulty,<br />

as the controlling authority also<br />

comes from the same DBOT<br />

consortium.<br />

Construction Versus Support<br />

Service Views<br />

The American and the British<br />

approach to FM functions differ.<br />

In her research, Maliene (2005)<br />

identified the development <strong>of</strong><br />

FM as coming from two different<br />

schools <strong>of</strong> thought:<br />

● American - FM is focused<br />

o n wo r k p l a c e e f f i c i e n cy<br />

a n d m a n a g e m e n t o f t h e


18 COVER FEATURE<br />

THE INGENIEUR<br />

facilities; the main target is<br />

the physical workplace (Tay<br />

and Ooi, 2001; Cotts and<br />

Lee 1992),<br />

● B r i t i s h - F M i s f o c u s e d<br />

o n i n t e g r a t e d s e r v i c e s ,<br />

h e a l t h a n d p r o d u c t iv i t y,<br />

improvement <strong>of</strong> the work<br />

environment and employees;<br />

the most attention is paid<br />

Maintenance/Operation<br />

Management<br />

Monitoring/<br />

Tracking<br />

Maintenance/<br />

Alteration/<br />

Repair<br />

Space<br />

Management<br />

Figure 5 Identifiable FM Functions (IFMA, 1997)<br />

to the core business and<br />

employee support (Maliene,<br />

2005).<br />

In order to have a clear view<br />

on FM functions, the author has<br />

categorised group maintenance<br />

and operation management and<br />

also property management as<br />

construction-related activities,<br />

while services and performance<br />

Identifiable Facilities Management (FM) Functions<br />

Group 1 - FM definition Group 2 - FM definition<br />

Asset Accounts<br />

Functional Performance<br />

Track Cost Value<br />

Track Operation Cost<br />

Track Life Cycle Cost<br />

Energy Consumption<br />

Operation Efficiency<br />

Specification/<br />

Configuration<br />

<strong>Pro</strong>curement/Installation<br />

Preventive Maintenance<br />

<strong>Pro</strong>ject Execution<br />

<strong>Pro</strong>blem Identification/<br />

Allocation<br />

Space Use Management<br />

Move Management<br />

<strong>Pro</strong>perty Management<br />

Building Assessment<br />

Site Selection/<br />

Acquisition<br />

Rent Management<br />

Lease Management<br />

Building Purchase<br />

Advertising<br />

Public Relations<br />

Area Measurement/<br />

Calculation<br />

Space Allocation<br />

Space Assignment<br />

Space Suitability<br />

Assessment<br />

Space <strong>Pro</strong>gramming<br />

Space Forecasting/<br />

Planning<br />

Post-occupancy<br />

Evaluation<br />

Placement <strong>of</strong> Signs<br />

have been grouped as a support<br />

to the primary objectives <strong>of</strong> the<br />

organisation. In North America<br />

the FM functions are popularly<br />

c l a s s i f i e d i n t o t h r e e b a s i c<br />

categories: maintenance and<br />

operation management, property<br />

m a n a g e m e n t , a n d s e r v i c e s<br />

(IFMA, 1997). Figure 5 shows<br />

the Identifiable functions <strong>of</strong> FM<br />

by the IFMA (1997).<br />

Services<br />

Warehouse<br />

Management<br />

Custodian<br />

Work Planning<br />

Copy/Printing<br />

Services<br />

Hazardous/<br />

Recycling<br />

Emergency<br />

Planning<br />

Fire <strong>Pro</strong>tection<br />

Security<br />

Services<br />

Occupancy<br />

Planning<br />

Stacking/<br />

Blocking<br />

Floor Layout<br />

Furniture<br />

Design<br />

FM related to design and construction - Group 1 FM as services in the organisation - Group2


THE INGENIEUR COVER FEATURE<br />

19<br />

Maintenance and operation<br />

management is further classified<br />

into the three interrelated<br />

function areas; monitoring and<br />

tracking, maintenance, alteration/<br />

repairing, and space management<br />

(IFMA, 1997). Sub-functions <strong>of</strong><br />

each <strong>of</strong> these areas are also<br />

defined. On the other hand,<br />

the IFMA outlines some <strong>of</strong> the<br />

FM functions under services as<br />

including warehouse management,<br />

work planning, printing services,<br />

recycling, emergency planning,<br />

fire protection and security<br />

services. The functions <strong>of</strong> FM are<br />

further divided accordingly, based<br />

on the two groups identified in<br />

the previous section for ease <strong>of</strong><br />

discussion.<br />

Furthermore, discussion and<br />

research forums between leading<br />

FM organisations and the Centre<br />

<strong>of</strong> Facilities Management (CFM),<br />

as a leading centre in the UK,<br />

have identified seven categories<br />

<strong>of</strong> FM services as follows (CFM,<br />

2004):<br />

Facilities Management (FM) Functions<br />

Group 1 - FM definition Group 2 - FM definition<br />

Design<br />

Construction<br />

Building operations and<br />

maintenance<br />

1. Electrical<br />

2. Fabric<br />

3. Grounds<br />

4. Mechanical<br />

5. Specialist equipment<br />

<strong>Pro</strong>perty Management<br />

1. Space planning<br />

2. Asset management<br />

3. <strong>Pro</strong>ject management<br />

4. Design/Construction<br />

5. Disposals/Acquisition<br />

6. Relocation<br />

management<br />

Infrastructure<br />

1. Utilities (gas, water,<br />

electricity)<br />

2. Road<br />

Environmental<br />

management<br />

1. Energy management<br />

2. Health and safety<br />

3. Hygiene services<br />

4. Pest control<br />

5. Waste management<br />

Information<br />

Technology and<br />

Telecommunications<br />

FM related to design and construction – Group 1<br />

FM as services in the organisation – Group 2<br />

1. IT advisory services<br />

2. IT R&D<br />

3. Information services<br />

4. Management<br />

information systems<br />

5. Technical services<br />

6. Systems administration<br />

and management<br />

7. Computer/server<br />

8. CAFM systems (CAD,<br />

PPM, GIS, DSS, etc<br />

9. Customer<br />

response/support<br />

10.Network services and<br />

Management<br />

11. Cable management<br />

12. Telecommunication<br />

systems and services<br />

13. Network and<br />

telecommunications<br />

Figure 6 FM Function derived from Centre for FM (UK)<br />

1. Building operations and<br />

maintenance<br />

2. Support services which include<br />

catering, porter service,<br />

cleaning and security<br />

3. Information Technology and<br />

telecommunications<br />

4. Transport<br />

5. <strong>Pro</strong>perty management<br />

6. Infrastructure<br />

7. Environment management<br />

The above categories have<br />

been grouped together according<br />

Services and performance<br />

Support Services<br />

1. Catering and<br />

vending services<br />

2. Cleaning<br />

3. Courier services<br />

4. Furniture<br />

management<br />

5. Landscape internal<br />

6. Laundry<br />

7. Mail room<br />

8. Office support<br />

services<br />

9. On-site moves<br />

10. Porterage<br />

11. Reception<br />

12. Security<br />

13.Travel<br />

14. Library<br />

15. Shops/retail<br />

Transport<br />

1. Fleet management<br />

2. Site transportation<br />

3. Vehicle renting and<br />

leasing<br />

Business support<br />

services in client<br />

organisations<br />

1. Administration<br />

2. Finance<br />

3. Human resource<br />

4. <strong>Pro</strong>curement


20 COVER FEATURE<br />

THE INGENIEUR<br />

to design and construction<br />

(Group 1), service/performance<br />

and Information Technology<br />

(Group 2) as in Figure 6. Figures<br />

5 and 6 enable the reader to<br />

appreciate the difference between<br />

the approach commonly used in<br />

America and the CFM in the UK.<br />

The main difference is seen in<br />

the services function <strong>of</strong> FM.<br />

The American interpretation<br />

places more emphasis on the<br />

physical workplace but this<br />

does not mean that there is less<br />

interest in FM services functions<br />

in this approach. On the other<br />

hand, the CFM in the UK, has<br />

a focus which is more towards<br />

the services output for FM rather<br />

than the physical workplace.<br />

Kuala Lumpur International Airport<br />

The inclusion <strong>of</strong> IT and<br />

t e l e c o m m u n i c a t i o n s h a s<br />

stressed its importance as one<br />

<strong>of</strong> the functions <strong>of</strong> FM in<br />

the provision <strong>of</strong> integrated<br />

services for improvement <strong>of</strong> the<br />

work environment, employee<br />

satisfaction, and the sharing<br />

<strong>of</strong> design and construction<br />

information with other FM<br />

stakeholders.<br />

Recommendation<br />

FM must be considered as<br />

part <strong>of</strong> any PFI initiatives. The<br />

concept <strong>of</strong> PFI and the definition<br />

<strong>of</strong> FM must be clearly defined<br />

and understood. There is yet to<br />

be an agreeable definition <strong>of</strong> FM<br />

among the construction industry<br />

players and, property developers<br />

in <strong>Malaysia</strong>.<br />

In <strong>Malaysia</strong> even though the<br />

concept <strong>of</strong> PFI is relative new<br />

but the practice on partnering<br />

has taken placed as early as the<br />

80’s. These included the use <strong>of</strong><br />

design, build and operate contract<br />

on infrastructure and building<br />

projects. These experiences could<br />

be tapped and learned<br />

PFI is about partnering, risk<br />

transfer and trust which emphase<br />

the importance <strong>of</strong> whole life cycle<br />

approach. The strength <strong>of</strong> PFI lies<br />

on the following:<br />

● Benefit <strong>of</strong> project to owner,<br />

concessionaire, public (winwin<br />

approach)<br />

● <strong>Pro</strong>curement strategy<br />

● Strategic partnering<br />

● Risk transfer valuation<br />

● Innovation<br />

● C o n t r a c t a n d p r o j e c t<br />

management experience<br />

● Interaction <strong>of</strong> all parties at<br />

onset <strong>of</strong> the construction<br />

project<br />

PFI must be looked in a<br />

holistic view which incorporate<br />

design, construction related<br />

activities on one side and<br />

operation, maintenance (i.e. FM)<br />

on the other side. It shall be<br />

a win-win situation approach<br />

that fulfills client-concessionairepublic/customer<br />

satisfaction.<br />

As the agreement between<br />

the client and concessionaire<br />

will last between 30 and 35<br />

years, a careful and thorough<br />

examination on cost and benefit<br />

analysis must be done prior to<br />

adopting PFI in any construction<br />

project.<br />

In order to successfully practice<br />

PFI in <strong>Malaysia</strong>, it requires a<br />

combination between experts<br />

(i.e. client/owner, concessionaire<br />

and public) in project and<br />

contract management, facilities<br />

management, economist, social<br />

sciences to be on board right at<br />

the onset <strong>of</strong> any potential PFI<br />

project discussion. <strong>BEM</strong>


THE INGENIEUR COVER FEATURE 21<br />

REFERENCES<br />

Alexander, K. Facilities management:<br />

creating the platform for business<br />

value by, Director, Centre for<br />

Facilities Management, University<br />

<strong>of</strong> Salford, 2003 http://fm.atalink.<br />

co.uk/articles/article-81.phtml.<br />

Alexander K. A Strategy for facilities<br />

management Facilities, 1 November<br />

2003a, vol. 21, no. 11-12, pp. 269-<br />

274(6) Emerald Group Publishing<br />

Limited<br />

Allen, S., Lenard, D. (2004)<br />

Private Finance and Public Private<br />

Partnerships – A review, Centre for<br />

Construction Innovation. http://<br />

www.ccinw.com/ . Accessed on<br />

21 st . December, 2004<br />

Alshawi, M., Faraj, I. (2002),<br />

I n t e g r a t e d c o n s t r u c t i o n<br />

environments: technology and<br />

implementation, Construction<br />

Innovation 2002;2: 33-51, Arnold<br />

A m o r . R . , B e t t . M . , 2 0 0 1 ,<br />

I n f o r m a t i o n T e c h n o l o g y f o r<br />

Construction: Recent Work and<br />

Future Directions, CIB World<br />

Building Congress, April, 2001,<br />

Wellington, New Zealand.<br />

Aouad, G. and Alshawi, M. 1996:<br />

Priority Topics for Construction<br />

I n f o r m a t i o n T e c h n o l o g y ,<br />

International Journal <strong>of</strong> Construction<br />

Information Technology 4, 45-66.<br />

Badawi, Abdullah A. Datuk Seri<br />

(2001) The Deputy Prime Minister<br />

<strong>of</strong> <strong>Malaysia</strong>, (February 2001), The<br />

Star (newspaper), <strong>Malaysia</strong>.<br />

Banwell, H. 1964: Report <strong>of</strong> the<br />

Committee on the Placing and<br />

Management <strong>of</strong> Contracts for<br />

Building and Civil Engineering<br />

Work. HMSO, UK.<br />

Barrett, P & Baldry, D (2003)<br />

Facilities Management Towards<br />

Best Practice, Blackwell Publishing,<br />

Oxford, UK, 2003<br />

Betts, M. editor, 1999: Strategic<br />

Management <strong>of</strong> IT in Construction,<br />

Blackwell Science.<br />

Boussabaine, H. A., Kirkham, R.<br />

J. (2004) Whole Life-cycle costing<br />

Risk and Risk Responses, Blackwell<br />

Publishing.<br />

Brandon, P.S. (1999) <strong>Pro</strong>cess/<br />

<strong>Pro</strong>duct Development in 2000<br />

Beyond, Berkeley-Stanford CE&M<br />

Workshop, Stanford 1999.<br />

Brandon, P, Smith, D, Betts, M.<br />

1997: Creating a Framework For<br />

IT in Construction http://www.scpm.<br />

salford.ac.uk/meeting/docs/papers/<br />

paper1/paper1.htm.<br />

Brandon, P. 2000: Construction<br />

IT: Forward to what? - Keynotes<br />

Paper, INCITE 2000 Implementing<br />

IT to obtain a competitive advantage<br />

in the 21 st . Century, Conference<br />

<strong>Pro</strong>ceedings, 17-18 January, Hong<br />

Kong, 1-15.<br />

Construction 21. 1999: Published by<br />

Ministry <strong>of</strong> Power and Ministry <strong>of</strong><br />

Development Singapore.<br />

Civil Engineering Design and<br />

Guide: A guide to integrating design<br />

into construction process, 2000:<br />

CIRIA,DETR UK<br />

Dixon, T, Jordan, A, Marston,<br />

A, Pinder, J, Pottinger, G. (2003)<br />

Lessons from UK PFI and Real Estate<br />

Partnerships - drivers, barriers and<br />

critical success factors, College <strong>of</strong><br />

Estate Management, Reading.<br />

Eden, J. Chen S.E. and McGeorge,<br />

D. 2000: Australian Government<br />

Initiatives in IT Take Up, INCITE<br />

2000 Implementing IT to obtain a<br />

competitive advantage in the 21 st .<br />

Century, Conference <strong>Pro</strong>ceedings,<br />

17-18 January, Hong Kong, 197-<br />

208.<br />

Egan, Sir John. 1998: Rethinking<br />

Construction, Department <strong>of</strong> Trade<br />

and Industry.<br />

Emmerson, H. 1962: Survey <strong>of</strong><br />

<strong>Pro</strong>blems Before the Construction<br />

Industries. HMSO, UK.<br />

Fischer, M., John Kunz (2004)<br />

TR156: The Scope and Role<br />

<strong>of</strong> Information Technology in<br />

Construction<br />

http://www.stanford.edu/group/CIFE/<br />

Publications/index.html<br />

Hamid, Z, Sarshar, M. (2003),<br />

Specification <strong>of</strong> a Strategy to Facilitate<br />

the Effective Integration <strong>of</strong> ICT in<br />

the <strong>Malaysia</strong>n Construction Industry,<br />

Paper submitted to Construction<br />

Innovation Journal for publication.<br />

(Submitted on 8 th . May, 2003)<br />

Hamid, Z., Alshawi (2004), Strategic<br />

Information Systems Planning<br />

Requirements in Facilities Management<br />

for health Sector – A Plan for<br />

Technology Transfer to <strong>Malaysia</strong>n<br />

Construction Industry INCITE 2004-<br />

World IT for Design and Construction<br />

Langkawi, <strong>Malaysia</strong>: 18-21 February<br />

2004, CIDB <strong>Malaysia</strong><br />

Higgins, G. & Jessop, N. (1965).<br />

Communications in the Construction<br />

Industry: the Report <strong>of</strong> a Pilot Study.<br />

Tavistock Institute, London.<br />

Kevin Yu, Thomas Froese and<br />

F r a n c o i s G r o b l e r ( 2 0 0 0 ) , A<br />

development framework for data<br />

models for computer-integrated<br />

facilities management, Automation<br />

in Construction Volume 9, Issue<br />

2, March 2000, Pages 145-167,<br />

Elsevier Science<br />

Kunz, J., Fischer, M., Haymaker,<br />

J., Levitt, R. 2002: Integrated and<br />

Automated <strong>Pro</strong>ject <strong>Pro</strong>cesses in<br />

Civil Engineering: Experiences<br />

<strong>of</strong> the Center for Integrated<br />

Facility Engineering at Stanford<br />

University. CIFE Technical Report<br />

# 132 February, 2002. Stanford<br />

University.<br />

Latham, Sir Michael. 1994:<br />

Constructing the Team. HMSO.<br />

Nayanthara de Silva, M.F.Mohammed<br />

F. Dulaimi , , Florence Y. Y. Ling<br />

and George Ofori, 2004: Building<br />

and Environment, Volume 39,<br />

Issue 10 , October 2004, Pages<br />

1243-1251 Elsevier Ltd.<br />

Ng., ST. Chen. SE, McGeorge<br />

D, Lam K-C and Evans, S.<br />

2001: Current state <strong>of</strong> IT usage<br />

by Australian subcontractors,<br />

Construction Innovation, Volume<br />

1, Number 1, 2001, Arnold.<br />

Sarshar. M, Betts. M, Abbott,<br />

C. Aouad, G.(2000) A vision<br />

for construction IT 2005-2010,<br />

RICS Research Papers, Vol. 3,No.<br />

1,December 2000<br />

Schwegler, R. B., Fischer, M. A.,<br />

O’Connell,M. J., Hanninen, R.,<br />

Laitinen, J. 2001: Near, Medium and<br />

Long-Term Benefits <strong>of</strong> Information<br />

Technology in Construction. CIFE<br />

Working Paper # 65 July, 2001.<br />

Stanford University<br />

Teicholz, E, 2004: IFMA Journal<br />

Copyright 2004 April/March 2004<br />

IFMA Journal BRIDGING THE<br />

AEC/FM TECHNOLOGY GAP<br />

U n i v e r s i t y C o l l e g e L o n d o n<br />

(UCL), (1993) MSc: Facility and<br />

Environment Management, course<br />

definition.


22 COVER FEATURE<br />

THE INGENIEUR<br />

<strong>Pro</strong>fessional Services<br />

Export Fund<br />

By <strong>Pro</strong>fessional Services Expert Fund Unit, <strong>Malaysia</strong> External Trade Development Corporation<br />

(MATRADE)<br />

The <strong>Pro</strong>fessional Services Export Fund (PSEF)<br />

is a scheme to provide financial assistance in<br />

the form <strong>of</strong> reimbursable grant, to <strong>Malaysia</strong>n<br />

<strong>Pro</strong>fessional Service <strong>Pro</strong>viders (PSPs) for undertaking<br />

activities to export their services. The Fund’s<br />

objectives are to:<br />

● Expand export <strong>of</strong> <strong>Malaysia</strong>n pr<strong>of</strong>essional<br />

services<br />

● Brand <strong>Malaysia</strong>n pr<strong>of</strong>essionals<br />

● Gather market intelligence to assist <strong>Malaysia</strong>n<br />

companies to secure overseas projects.<br />

It was launched on September 28, 2006 with an<br />

allocation (Ninth <strong>Malaysia</strong> Plan) <strong>of</strong> RM150 million.<br />

The Fund is part <strong>of</strong> the Government’s policy package<br />

to increase export <strong>of</strong> <strong>Malaysia</strong>n services.<br />

The sectors eligible to apply for the Fund<br />

include:<br />

● Social services<br />

● Infrastructure<br />

● Environment, water & natural resources<br />

● Energy & mining<br />

● Healthcare & hospital management services<br />

● ICT for development including e-government<br />

● Rehabilitation & reconstruction studies<br />

● Utilities, water supply & sewerage<br />

● Architectural & interior design services<br />

● Urban planning & management<br />

● Agricultural & rural development<br />

● Information systems & service applications<br />

Road construction<br />

The three types <strong>of</strong> grants available are:<br />

● Matching Grant<br />

● Conditional Grant<br />

● Pre-feasibility and feasibility Grant<br />

Matching grants finance 50 % <strong>of</strong> approved<br />

eligible expenses in the preparation and<br />

submission <strong>of</strong> bids for eligible studies. Costs<br />

include preparing and submitting a bid to do a<br />

study, not the cost <strong>of</strong> actually doing the study<br />

itself. Conditional grants reimburse 50 % <strong>of</strong><br />

eligible expenses incurred in the preparation<br />

and submission <strong>of</strong>:<br />

● Bids: Design, Design-Build, Design-Build-<br />

Operate and Design-Build- Operate-Maintain<br />

projects;<br />

Or<br />

● Negotiated projects: <strong>Pro</strong>ject proposals made<br />

directly to clients through negotiations<br />

Pre-feasibility and feasibility grants are<br />

specifically for financing up to 100% <strong>of</strong> the cost<br />

<strong>of</strong> the respective studies. Studies can take any <strong>of</strong><br />

the following forms:<br />

● fully funded through the PSEF;<br />

● jointly funded by the PSEF and the foreign<br />

Government or its agencies;<br />

● jointly funded by the PSEF and the owner <strong>of</strong><br />

the project;<br />

● jointly funded by the PSEF and global and<br />

international funding institutions.<br />

Eligible expenses and activities incorporate the<br />

following:<br />

● Purchase <strong>of</strong> bid documents<br />

● Travel and accommodation expenses related to<br />

bid briefing, technical visits and consultative<br />

meetings with potential clients<br />

● Approved costs related to fact-finding and<br />

market research<br />

● Approved design costs<br />

● Staff costs<br />

● Scale & mock-up model costs<br />

● Printing, binding and transmittal costs.


THE INGENIEUR COVER FEATURE<br />

23<br />

Travel and accommodation expenses cover:<br />

● Travelling cost not more than 15 trips<br />

● Accommodations for a maximum <strong>of</strong> 21 nights<br />

not exceeding RM1000 per night<br />

● Economy class not inclusive <strong>of</strong> visa, excess<br />

baggage and premiums<br />

● Related local expenses including car rentals,<br />

taxi fares and cost <strong>of</strong> engaging a local guide<br />

and interpreter.<br />

Fact-finding and market research relate to<br />

surveys: geotechnical, hydrological and ground<br />

surveys, purchase <strong>of</strong> market reports and<br />

related information and related expenses on<br />

research and local studies. Schematic designs,<br />

computer-aided animation, video presentation<br />

and technical drawing costs are included under<br />

design costs.<br />

Staff Costs incorporates:<br />

● <strong>Pro</strong>fessional and support staff (sub-pr<strong>of</strong>essional<br />

and administrative)<br />

● Those directly involved with the preparation<br />

<strong>of</strong> the bid or proposal, This is guided by<br />

the latest Treasury Guidelines on Government<br />

<strong>Pro</strong>curement for Consultancy Services<br />

Who is eligible to apply for the Fund<br />

Companies must be at least 60% <strong>Malaysia</strong>n<br />

owned. They can be sole proprietors, partnerships<br />

or firms which are competent and have the<br />

capacity to export. The companies should have<br />

qualified and technical staff; and be able to<br />

provide evidence <strong>of</strong> financial support to undertake<br />

the bid or proposals.<br />

To apply, the financial criteria for non-SMEs<br />

are<br />

● 3 years audited account and must satisfy:<br />

(i) Positive shareholders’ fund<br />

(ii) Positive working capital<br />

In the event (i) and (ii) are not satisfactory,<br />

the company may submit<br />

● Company’s latest bank statement (six months)<br />

with average balance not less than 10% <strong>of</strong><br />

the value <strong>of</strong> grant applied; or<br />

● Directors’ latest bank statements (six months)<br />

with average balance not less than 10% <strong>of</strong><br />

the value <strong>of</strong> grant applied; or<br />

● Credit line or loan facilities with local or<br />

foreign bank with facilities value <strong>of</strong> not less<br />

than 20% <strong>of</strong> the value <strong>of</strong> grant applied<br />

Water supply project<br />

For SMEs, the financial criteria are:<br />

● Audited accounts for the proceeding three years<br />

with positive shareholders’ fund and working<br />

capital<br />

Or<br />

● Latest unaudited accounts and evidence <strong>of</strong><br />

financial capabilities in terms <strong>of</strong> bank statements<br />

or other financial supports available to undertake<br />

the bid/proposal<br />

How to apply<br />

● Get details from www.matrade.gov.my<br />

● PSEF 1/07 and supporting documents are<br />

required<br />

● For bids, please submit application within the<br />

bid eligibility period (after bid notice date until<br />

closing <strong>of</strong> bid date)<br />

● For negotiated projects, please submit applications<br />

90 days from receiving the Letter <strong>of</strong> Intent<br />

(LOI). <strong>BEM</strong><br />

Please contact the following key persons for<br />

further details:<br />

● En Azhar Mohd, Senior Manager<br />

03-62077077 ext 7138<br />

Email: azharm@matrade.gov.my<br />

● En Mohamed Hafiz Md Shariff, Assistant Manager<br />

03-62077077 ext 7136<br />

Email: mdhafiz@matrade.gov.my<br />

● En Suwardy Abd. Shukor, Assistant Manager<br />

03-62077077 ext 7137<br />

Email: suwardy@matrade.gov.my


24 UPDATE<br />

THE INGENIEUR<br />

SYABAS understands the need to expedite internal plumbing plan approvals, and has already implemented<br />

the simultaneous processing <strong>of</strong> external plan and internal plumbing plan as a way to speed up approval<br />

<strong>of</strong> plans<br />

However, in order to avoid issues due to a lack <strong>of</strong> coordination in the design assumption, to proceed<br />

with such simultaneous plan processing SYABAS has decided that for cases where internal plumbing plan<br />

approval is held up because the external plan has not been approved yet, the M/E consultant responsible<br />

for internal plumbing must obtain a confirmation letter from the external civil and structural (C & S)<br />

engineer that:<br />

(a) Where internal pumping is provided in the building, the C & S engineers responsible for the external<br />

system, provides a letter certifying that the amount <strong>of</strong> residual pressure to and at the suction tank is<br />

greater than 7.5 metres (where source was approved from SYABAS reticulation pipe) and 4.5 metres<br />

(where the developer has built an external reservoir or sourced from approved trunk distribution<br />

main).<br />

(b) Where internal pumping is not required and flow water into the main tank is by gravity, then the C&S<br />

engineer responsible for the external system provides a letter certifying that the amount <strong>of</strong> residual<br />

pressure to and at the highest supply level <strong>of</strong> tank is greater than 7.5 metres (where source was<br />

approved from SYABAS reticulation pipe) and 4.5 metres (where the developer has built an external<br />

reservoir or sourced from approved trunk distribution main).<br />

The above procedure would be implemented with immediate effect.<br />

DATO’ IR. LEE MIANG KOI<br />

Chief Operating Officer<br />

SYARIKAT BEKALAN AIR SELANGOR SDN. BHD.<br />

LIGHTER MOMENTS<br />

Situations Under Which Internal<br />

Plumbing Plan Approval Can Be Given<br />

Though External Plan Not Approved Yet<br />

ICT Evolution<br />

After having dug to a depth <strong>of</strong> 1000 meters<br />

last year, Swedish scientists found traces <strong>of</strong><br />

copper wire dating back 1000 years<br />

and came to the conclusion that<br />

their ancestors already had a<br />

telephone network more than<br />

1000 years ago.<br />

Not to be outdone by the<br />

Swedes, in the weeks that followed,<br />

English scientists dug to a depth<br />

<strong>of</strong> 2000 meters and shortly after,<br />

headlines in the UK newspapers read;<br />

English archaeologists have found traces <strong>of</strong> 2000<br />

year old fiber-optic cable and have concluded<br />

that their ancestors already had an advanced hightech<br />

digital communications network a thousand<br />

years earlier than the Swedes.<br />

One week later, <strong>Malaysia</strong>n newspapers<br />

reported the following: After digging as<br />

deep as 5000 meters in padi fields in<br />

Kedah, <strong>Malaysia</strong>n scientists have found<br />

absolutely nothing.<br />

They, therefore, have concluded<br />

that 5000 years ago, <strong>Malaysia</strong>n’s<br />

inhabitants were already using wireless<br />

technology.<br />

Moral <strong>of</strong> the story: <strong>Malaysia</strong> Boleh..........!!!<br />

Author: Unknown


THE INGENIEUR ENGINEERING & LAW<br />

25<br />

The SCL Delay And<br />

Disruption <strong>Pro</strong>tocol:<br />

An Overview<br />

By Ir. Harbans Singh K.S. 1<br />

Delay and Disruption issues represent a<br />

significant portion <strong>of</strong> contentious matters<br />

confronting implementers <strong>of</strong> projects<br />

especially in the post-contract award phase.<br />

Various aspects <strong>of</strong> this important area <strong>of</strong> contract<br />

administration and claims have been addressed in<br />

my previous articles penned for The Ingenieur; the<br />

most recent example <strong>of</strong> which being in Vols. 33<br />

and 34 2 . However, such articles are not exhaustive<br />

and within the various prevailing constraints, these<br />

have not been able to cover the whole spectrum <strong>of</strong><br />

issues which a practitioner should be aware <strong>of</strong>. This<br />

instant article therefore aims to expand upon the<br />

discussion by introducing an important development<br />

that is making waves in the construction industry,<br />

in particular, in the United Kingdom and which<br />

in due time will be reaching our shores with its<br />

attendant ramifications. This is a document entitled<br />

‘The Society <strong>of</strong> Construction Law (SCL) Delay and<br />

Disruption <strong>Pro</strong>tocol’ 3 ; a very thorough and well<br />

researched piece <strong>of</strong> work drafted by a body <strong>of</strong><br />

lawyers, engineers, architects, surveyors and others<br />

with an interest in the legal aspects <strong>of</strong> construction<br />

projects. After an extended period <strong>of</strong> consultation,<br />

the SCL <strong>Pro</strong>tocol was published on October 16,<br />

2002; being reprinted subsequently in 2004. In<br />

a nutshell, the SCL <strong>Pro</strong>tocol deals principally<br />

with cost and time issues pertaining to delay and<br />

disruption in construction projects. Its impact upon<br />

the construction industry is neatly summed up by<br />

Davison in the following words: 4<br />

…… While the <strong>Pro</strong>tocol is not without its critics<br />

and is regarded, at least in some respects, as<br />

controversial in some respects,<br />

it represents a body <strong>of</strong> thought and opinion<br />

from a respected body, only reached after a long<br />

and extensive consultation process with interested<br />

parties in the industry …… It does however contain<br />

a thoughtful and well researched set <strong>of</strong> guidelines<br />

for the methods that can be adopted to resolve the<br />

issues <strong>of</strong> delay in construction contracts, bearing<br />

in mind that many issues do not have finite, or<br />

absolute, answers and the <strong>Pro</strong>tocol can <strong>of</strong>fer only<br />

a set <strong>of</strong> balanced and considered views. It should<br />

however be borne in mind that any analysis <strong>of</strong><br />

events on a Construction Contract will only be as<br />

sound as the facts on which it is based. There is no<br />

substitute for properly recorded factual information<br />

as the basis <strong>of</strong> any analysis …..<br />

Contents 5<br />

The SCL <strong>Pro</strong>tocol comprises the following<br />

principal contents:<br />

I. Introduction<br />

II. Core Principles relating to delay and<br />

compensation<br />

III. Guidance Notes<br />

● Guidance Section 1: Guidelines on the<br />

<strong>Pro</strong>tocol’s position on the Core Principles<br />

and on other matters relating to delay and<br />

compensation.<br />

● Guidance Section 2: Guidelines on preparing<br />

and maintaining programmes and records.<br />

● Guidance Section 3: Guidelines on dealing<br />

with extensions <strong>of</strong> time during the course <strong>of</strong><br />

the project.<br />

● Guidelines Section 4: Guidelines on dealing<br />

with disputed extension <strong>of</strong> time issues after<br />

the completion <strong>of</strong> the project – retrospective<br />

delay analysis.<br />

● Concluding notes and dedication.<br />

1. Director HSH Consult Sdn. Bhd. B.E. (Mech) S’pore,<br />

LLB (Hons) London, CLP, DipICArb, P.E., C. Eng.<br />

2. Under the titles ‘Demystifying Direct Loss and Claims’<br />

and ‘Demystifying Direct Loss and Expense Claims: The<br />

Continuing Saga’.<br />

3. Hereinafter called ‘The SCL <strong>Pro</strong>tocol’ in short.<br />

4. See Davison, P. “Evaluating Contract Claims” at p5.<br />

5. See www.scl.org.UK and www.eotprotocol.com.


26 ENGINEERING & LAW<br />

THE INGENIEUR<br />

IV. Appendices<br />

Appendix A - Definitions and glossary<br />

Appendix B - Model Specification Clause<br />

Appendix C - Model Records Clause<br />

Appendix D - Graphics illustrating points in<br />

the <strong>Pro</strong>tocol.<br />

I. Introduction<br />

This section <strong>of</strong> the <strong>Pro</strong>tocol sets out in a clear<br />

and concise manner the objects/purposes which this<br />

document aims to achieve, these being namely 6 :<br />

● To provide useful guidance where one party to<br />

a construction contract wishes to recover from<br />

the other extension <strong>of</strong> time and/or compensation<br />

due to the latter’s default;<br />

● To provide a means by which the said parties<br />

can resolve these matters and avoid necessary<br />

disputes;<br />

● To provide a scheme for dealing with delay and<br />

disruption issues that is balanced and viable;<br />

● To provide recommendations and guidance to<br />

those involved with both the drafting <strong>of</strong> contracts<br />

and implementing these;<br />

● To act as an aid to the interpretation and analysis<br />

<strong>of</strong> the delay and disruption provisions contained<br />

in standard form civil engineering and building<br />

contracts 7 ; and<br />

● To eventually get the construction industry<br />

to adopt the <strong>Pro</strong>tocol’s guidance as the best<br />

method <strong>of</strong> dealing with matters <strong>of</strong> delay and<br />

disruption which arise during the course <strong>of</strong> a<br />

contract.<br />

The limitations and the attendant caveats are also<br />

expressly spelt out, these being principally:<br />

● The <strong>Pro</strong>tocol is not intended to be a contract<br />

document, i.e. it is not framed with the intention<br />

that it should itself form part <strong>of</strong> the contract,<br />

although it has model clauses for possible<br />

adoption and incorporation in contracts 8 ;<br />

● It does not purport to take precedence over the<br />

express terms <strong>of</strong> a contract or to be a statement<br />

<strong>of</strong> law;<br />

● The <strong>Pro</strong>tocol has not been put forward as a<br />

benchmark <strong>of</strong> current 9 good practice throughout<br />

the Construction industry 10 ;<br />

● Users are advised to apply the <strong>Pro</strong>tocol’s<br />

recommendations with common sense;<br />

● The information, recommendations and/or advice<br />

contained in the <strong>Pro</strong>tocol are intended for use<br />

as a general statement and guide only; and<br />

● A general exclusion <strong>of</strong> liability; users being<br />

advised to take appropriate pr<strong>of</strong>essional advice<br />

on the matters referred to in the publication.<br />

II. Core Principles 11<br />

The essence <strong>of</strong> the <strong>Pro</strong>tocol is contained in this<br />

section which lists out 21 Core Principles, there<br />

being:<br />

■ Core Principle 1: <strong>Pro</strong>gramme and records<br />

The <strong>Pro</strong>tocol recommends that a proper<br />

programme should be submitted by the Contractor<br />

and approved by the Contract Administrator 12 . The<br />

programme is the essential monitoring tool for the<br />

<strong>Pro</strong>tocol, and the <strong>Pro</strong>tocol envisages that the updated<br />

programme will be the main tool for determining<br />

the amount <strong>of</strong> any extensions <strong>of</strong> time.<br />

As to its application in practice, heed should be<br />

taken <strong>of</strong> Davison’s advice to the following effect 13 :<br />

…. the most sensible approach to the <strong>Pro</strong>tocol<br />

is to regard it as a very sensible guide to good<br />

practice in the analysis <strong>of</strong> delay and disruption<br />

where it can be applied in harmony with the<br />

contract provisions, but not to incorporate it into<br />

a contract as it expressly states itself at paragraph<br />

B <strong>of</strong> the Introduction that it is not intended to<br />

be a contract document. Indeed it is difficult to<br />

imagine how a <strong>Pro</strong>tocol covering such a wide range<br />

<strong>of</strong> coverage could be compatible with more than<br />

one form <strong>of</strong> contract at a time.<br />

6. See ‘The SCL Delay and Disruption <strong>Pro</strong>tocol’ (Rep. 2004)<br />

at p3 &4.<br />

7. And presumably also for M&E contracts pertaining to<br />

construction projects.<br />

8. See Davison, P. “Evaluating Contract Claims” at p5<br />

9. i.e. 2002.<br />

10. Although it aims that the administration <strong>of</strong> contracts will<br />

eventually meet the <strong>Pro</strong>tocol’s standards.<br />

11. See ‘The SCL <strong>Pro</strong>tocol’ at p5 to 9.<br />

12. Engineer, Architect, S.O., Employer’s Representative, etc.<br />

as applicable.<br />

13. Davison, P. “Evaluating Contract Claims” at p37.


THE INGENIEUR ENGINEERING & LAW<br />

27<br />

■ Core Principle 2: Purpose <strong>of</strong> Extension <strong>of</strong> Time<br />

(EOT)<br />

The benefit to the Contractor <strong>of</strong> EOT is that it<br />

is relieved from its liability for damages for delay<br />

in completion in the form <strong>of</strong> liquidated damages.<br />

For the Employer, the mechanism prevents contract<br />

time from becoming ‘at large’; thereby preserving the<br />

Employer’s rights to the consequential damages.<br />

■ Core Principle 3: Entitlement to Extension<br />

<strong>of</strong> Time<br />

This principle emphasizes the need for the<br />

application for extension <strong>of</strong> time to be made and<br />

dealt with as close in time as possible to the<br />

delay event that gives rise to the application. It<br />

also underlines the fact that the Contractor is not<br />

automatically entitled to any delay event but only<br />

those in respect <strong>of</strong> which the Employer has assumed<br />

risk and responsibility 14 . The recommendation is for<br />

the parties to attempt, so far as is possible, to deal<br />

with the impact <strong>of</strong> the Employer Risk Event as the<br />

work proceeds, both in terms <strong>of</strong> time and cost.<br />

■ Core Principle 4: <strong>Pro</strong>cedure for granting<br />

extension <strong>of</strong> time<br />

Encompasses the general principles that need<br />

to be followed in granting the extension <strong>of</strong> time,<br />

these being:<br />

● The extension <strong>of</strong> time should only be granted to the<br />

extent that the Employer Risk Event is reasonably<br />

predicted to prevent the works completed by the<br />

then prevailing contract completion date; and<br />

● The procedure for granting extension <strong>of</strong> time<br />

should ensure that the purpose <strong>of</strong> such activity<br />

be maintained i.e. to ascertain the appropriate<br />

contractual entitlement to an extension <strong>of</strong> time<br />

and not to be based on whether or not the<br />

Contractor needs an extension <strong>of</strong> time in order<br />

not to be liable for liquidated damages.<br />

■ Core Principle 5: Effect <strong>of</strong> Delay<br />

This principle deals mainly with the common<br />

situation in practice where the contract administrator<br />

wants to see what the full impact <strong>of</strong> an Employer<br />

Risk Event will be on the progress <strong>of</strong> the works under<br />

the contract, before it deals with the Contractor’s<br />

application for extension <strong>of</strong> time. As far as the<br />

protocol is concerned, it holds that 15 for an extension<br />

<strong>of</strong> time to be granted, it is not necessary for the<br />

Employer Risk Event already to have begun to affect<br />

the Contractor’s progress with the works, or for the<br />

effect <strong>of</strong> the Employer Risk Event to have ended.<br />

■ Core Principle 6: Incremental review <strong>of</strong><br />

extension <strong>of</strong> time<br />

Core Principle 6 addresses the scenario where<br />

an Employer Risk Event has occurred but its full<br />

effect cannot be predicted at the time <strong>of</strong> the initial<br />

assessment by the contract administrator. Here it<br />

is recommended that 16 :<br />

• Nevertheless the contract administrator should<br />

still grant an Extension <strong>of</strong> time for the then<br />

predictable event;<br />

• The contract administrator should assess and<br />

award the extension <strong>of</strong> time on an incremental<br />

basis i.e. at intervals as the actual impact <strong>of</strong> the<br />

Employer Risk Event unfolds; and<br />

• In undertaking the said review and assessment, the<br />

extension <strong>of</strong> time can be increased incrementally,<br />

if appropriate, but cannot be decreased, unless<br />

there are express provisions stipulated in the<br />

contract permitting this.<br />

The <strong>Pro</strong>tocol’s recommendations are sanctioned<br />

by many authorities; one such being Carnell,<br />

who, in his text entitled ‘Causation and Delay in<br />

Construction Disputes’ states 17 :<br />

The practice <strong>of</strong> waiting to see the full effects<br />

<strong>of</strong> an employer’s risk event before awarding an<br />

extension <strong>of</strong> time is said not to be good practice<br />

….. it is indicated that the better approach is for<br />

14. Labeled in the <strong>Pro</strong>tocol as ‘Employer Risk Event’,<br />

commonly called ‘Act <strong>of</strong> Prevention’.<br />

6. See ‘The SCL Delay and Disruption <strong>Pro</strong>tocol’ (Rep. 2004)<br />

at p3 &4.<br />

7. And presumably also for M&E contracts pertaining to<br />

construction projects.<br />

8. See Davison, P. “Evaluating Contract Claims” at p5<br />

9. i.e. 2002.<br />

10. Although it aims that the administration <strong>of</strong> contracts will<br />

eventually meet the <strong>Pro</strong>tocol’s standards.<br />

11. See ‘The SCL <strong>Pro</strong>tocol’ at p5 to 9.<br />

12. Engineer, Architect, S.O., Employer’s Representative, etc.<br />

as applicable.<br />

13. Davison, P. “Evaluating Contract Claims” at p37.<br />

14. Labeled in the <strong>Pro</strong>tocol as ‘Employer Risk Event’,<br />

commonly called ‘Act <strong>of</strong> Prevention’.<br />

15. See also Guidance Section 1.2.12 The SCL <strong>Pro</strong>tocol.<br />

16. See also Guidance Section 1.2.14, p13 The SCL<br />

<strong>Pro</strong>tocol.<br />

17. See Carnell, N.J. ‘Causation and Delay in Construction<br />

Disputes’ at p224 & 225.


28 ENGINEERING & LAW<br />

THE INGENIEUR<br />

extension <strong>of</strong> time to be issued which represents<br />

the best possible estimate at that time. As better<br />

information becomes available the extension can<br />

be increased, although not reduced unless specific<br />

provision for this is made in the contract. The<br />

rational for this, <strong>of</strong> course, is that the programme<br />

should keep pace with events as they occur on<br />

site and should be a dynamic device for measuring<br />

progress and delays.<br />

■ Core Principle 7: Float as it relates to time<br />

The instant core principle and the subsequent<br />

one 18 address issues pertaining to the contentious<br />

area <strong>of</strong> ‘float’ 19 in a work programme and its effect<br />

on ‘time impact analysis’ and ‘cost impact analysis’.<br />

Core Principles 7 stipulates that unless there is an<br />

express provision to the contrary in the contract<br />

between the Employer and the Contractor, the<br />

<strong>Pro</strong>tocol recommends that where there is remaining<br />

float at the time <strong>of</strong> an Employer Risk Event, in<br />

terms <strong>of</strong> ‘time impact analysis’, an extension <strong>of</strong><br />

time should only be granted to the extent that the<br />

Employer Delay is predicted to reduce to below<br />

zero the total float on the activity paths affected<br />

by the Employer Delay.<br />

■ Core Principle 8: Float as it relates to<br />

compensation<br />

Core Principle 8 deals with the ‘Cost impact<br />

analysis’ vis-à-vis ‘float’ to the following effect:<br />

● If as a result <strong>of</strong> an Employer Delay, the Contractor<br />

is prevented from completing the works by the<br />

Contractor planned date 20 , the latter should in<br />

principle be entitled to be paid the costs directly<br />

by the Employer Delay; and<br />

● This applies notwithstanding that there is no delay<br />

to the Contract Completion date 21 provided also<br />

that at the time they enter into the Contract, the<br />

Employer is aware <strong>of</strong> the Contractor’s intention<br />

to complete the works prior to the contract<br />

completion date, and that intention is realistic<br />

and achievable.<br />

■ Core Principle 9: Concurrent Delay – Its effect<br />

on entitlement to extension <strong>of</strong> time<br />

This is the first <strong>of</strong> the core principles dealing<br />

with another area fraught with practical difficulty<br />

i.e. concurrent delay 22 . It stipulates that where<br />

Contractor Delay to completion occurs or has effect<br />

concurrently with Employer Delay to completion,<br />

the Contractor’s concurrent delay should not reduce<br />

any extension <strong>of</strong> time due.<br />

■ Core Principle 10: Concurrent Delay – its<br />

effect on entitlement to compensation for<br />

prolongation<br />

Core Principle 10 addresses the situation where<br />

the Contractor incurs additional costs due to<br />

prolongation in two different scenarios, namely:<br />

● If these are caused both by Employer Delay and<br />

concurrent Contractor Delay, then the Contractor<br />

should only recover compensation to the extent<br />

that it is able to separately identify the additional<br />

costs caused by the Employer Delay from those<br />

caused by the Contractor Delay;<br />

● If the Contractor would have incurred the<br />

additional costs in any event as a result <strong>of</strong><br />

Contractor Delay(s), the Contractor will then be<br />

not entitled to recover these additional costs 23 .<br />

■ Core Principle 11: Identification <strong>of</strong> float and<br />

concurrency<br />

Herein is stipulated the essence <strong>of</strong> the entire<br />

analysis i.e. accurate identification <strong>of</strong> float and<br />

concurrency is only possible with the benefit <strong>of</strong> a<br />

proper programme, properly updated.<br />

■ Core Principle 12: After the event delay<br />

analysis<br />

The instant core principle is concerned with<br />

the retrospective delay analysis by an adjudicator,<br />

judge or arbitrator. In such a situation, the protocol<br />

recommends that, in deciding entitlement to<br />

extension <strong>of</strong> time, the adjudicator, judge or arbitrator<br />

should so far as is practicable, put him or herself<br />

in the position <strong>of</strong> the contract administrator at the<br />

time the Employer Risk Event occurred 24 .<br />

■ Core Principle 13: Mitigation <strong>of</strong> delay and<br />

mitigation <strong>of</strong> loss<br />

Lays down the recommended principles pertaining<br />

to the Contractor’s general duty to mitigate the effect<br />

18. i.e. Core Principle 8.<br />

19. The term ‘float’ is defined in Appendix A p56 <strong>of</strong> The SCL<br />

<strong>Pro</strong>tocol.<br />

20. being a date earlier than the Contract Completion date.<br />

21. and therefore no entitlement to an extension <strong>of</strong> time.<br />

22. Being defined in Appendix A p55 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

23. See also Guidance Section 1.10.1 & 1.10.4 p22 & 23 <strong>of</strong><br />

The SCL <strong>Pro</strong>tocol.<br />

24. For further application see Section 4.19 p49 <strong>of</strong> The SCL<br />

<strong>Pro</strong>tocol.


THE INGENIEUR ENGINEERING & LAW 29<br />

on its works <strong>of</strong> Employer Risk Events; these being<br />

namely:<br />

● Unless the contract stipulates expressly to<br />

the contrary, the duty to mitigate does not<br />

extend to requiring the Contractor to add<br />

extra resources or to work outside its planned<br />

working hours; and<br />

● The Contractor’s duty to mitigate its loss has<br />

two aspects i.e.<br />

(a) It must take reasonable steps to minimize<br />

its losses; and<br />

(b) It must not take unreasonable steps that<br />

increase its loss.<br />

■ Core Principle 14: Link between extension<br />

<strong>of</strong> time and compensation<br />

Core Principle 14 nullifies the commonly held<br />

belief among Contractors/Sub-contractors that<br />

there is a link between extension <strong>of</strong> time and<br />

compensation by stipulating that an entitlement to<br />

extension <strong>of</strong> time does not automatically lead to<br />

entitlement to compensation and vice versa.<br />

■ Core Principle 15: Valuation <strong>of</strong> Variations<br />

Core Principle 15 addresses the consequential<br />

effects <strong>of</strong> variations in terms <strong>of</strong> cost and time<br />

impact on the contract. It advises that where<br />

practicable, the total likely effect <strong>of</strong> variations<br />

should be pre-agreed between the Employer 25 and<br />

the Contractor, to arrive, if possible at a fixed<br />

price <strong>of</strong> a variation, an agreed extension <strong>of</strong> time<br />

and the necessary revisions to the programme.<br />

The fixed price agreed at should include not<br />

only the direct costs 26 but also the time-related<br />

costs 27 .<br />

■ Core Principle 16: Basis <strong>of</strong> calculation <strong>of</strong><br />

compensation for prolongation<br />

The instant principle outlines the basis <strong>of</strong> the<br />

calculation <strong>of</strong> compensation for prolongation to<br />

ensure that the ultimate goal is met i.e. to put<br />

the Contractor money-wise in the same position it<br />

would have been if the Employer Risk Event had<br />

not occurred. To achieve this end, Core Principle<br />

16 recommends that unless the contract expressly<br />

stipulates to the contrary 28 , compensation for<br />

prolongation should not be paid for anything<br />

other than.<br />

(a) Work actually done; and/or<br />

(b) Time actually taken up; and/or<br />

(c) Loss and/or expense actually suffered<br />

Putting it simply, it re-emphasises the<br />

proposition that compensation for prolongation<br />

caused other than by variations should be based<br />

on the actual additional cost incurred by the<br />

Contractor.<br />

■ Core Principle 17: Relevance <strong>of</strong> tender<br />

allowances<br />

In tandem with Core Principle 16, since the<br />

Contractor is entitled only to its actual costs <strong>of</strong><br />

the prolongation or disruption, tender allowances<br />

have limited relevance for the evaluation <strong>of</strong> costs<br />

<strong>of</strong> prolongation and disruption caused by breach<br />

<strong>of</strong> contract or any other cause that requires the<br />

evaluation <strong>of</strong> additional costs 29 .<br />

■ Core Principle 18: Principle for evaluation<br />

<strong>of</strong> compensation<br />

Core Principle 18 attempts to lay to rest<br />

commonly used arguments as to the actual time<br />

when recoverable prolongation compensation<br />

should be assessed. In formulating a suitable<br />

answer, the <strong>Pro</strong>tocol lays down the following<br />

recommended procedure 30 :<br />

● Liability for compensation must first be<br />

established by showing that the prolongation<br />

has been caused by an Employer Risk Event;<br />

and<br />

● Once it is established that compensation for<br />

prolongation is due, the evaluation <strong>of</strong> the<br />

sum due should be made by reference to<br />

the period when the effect <strong>of</strong> the Employer<br />

Risk Event was felt, not by reference to the<br />

extended period at the end <strong>of</strong> the Contract.<br />

■ Core Principle 19: Global Claims<br />

This core principle concerns the particular<br />

form <strong>of</strong> some claims going under the label <strong>of</strong><br />

25. or Contract Administrator.<br />

26. e.g. labour, plant, material, etc.<br />

27. e.g. extended preliminaries, etc.<br />

28. e.g. by evaluation based on contract rates.<br />

29. See also Guidance Section 1.9.1 p21 <strong>of</strong> The SCL<br />

<strong>Pro</strong>tocol.<br />

30. See also Guidance Section 1.11.1 p23 & 24 <strong>of</strong> The SCL<br />

<strong>Pro</strong>tocol.


30 ENGINEERING & LAW<br />

THE INGENIEUR<br />

‘global claims’ 31 . The <strong>Pro</strong>tocol discourages such<br />

claims; calling these an uncommon practice. In<br />

the process, it gives effect to the contemporary<br />

legal position whereby such claims are rarely<br />

accepted by the Courts.<br />

■ Core Principle 20: Acceleration<br />

The <strong>Pro</strong>tocol addresses the following aspects<br />

<strong>of</strong> acceleration<br />

● Where the contract expressly permits<br />

acceleration, payment for the acceleration<br />

should be based on the applicable express<br />

term(s) <strong>of</strong> the Contract;<br />

● In the event that the contract does not<br />

expressly provide for acceleration but the<br />

parties agree that accelerative measures should<br />

be taken, the basis <strong>of</strong> payment should be<br />

agreed before the acceleration is commenced;<br />

and<br />

● The <strong>Pro</strong>tocol does not recommend claims<br />

going under the label <strong>of</strong> “constructive<br />

acceleration”. Instead, it advises, that prior<br />

to any acceleration measures being initiated,<br />

steps should be taken by either party to have<br />

the dispute or difference about entitlement to<br />

extension <strong>of</strong> time to be resolved in accordance<br />

with the dispute resolution procedures<br />

stipulated in the particular contract 32 .<br />

■ Core Principle 21: Disruption 33<br />

Defines and distinguishes disruption from<br />

delay. If caused by the Employer, the <strong>Pro</strong>tocol<br />

recommends that it may give rise to a right to<br />

compensation either under the Contract or as a<br />

breach <strong>of</strong> contract.<br />

III. Guidance Notes<br />

In its introduction to this portion <strong>of</strong> the<br />

document, the <strong>Pro</strong>tocol states 34 :<br />

These are guidelines to explain the <strong>Pro</strong>tocol’s<br />

position on Core Principles relating to delay<br />

and compensation. This section also contains<br />

additional material on other matters that come<br />

up repeatedly in delay claims. It is not<br />

intended that these Guidance Notes should be<br />

incorporated into a contract. The structure <strong>of</strong><br />

this section is to restate the core statements <strong>of</strong><br />

principle from the <strong>Pro</strong>tocol and then explain or<br />

expand on them.<br />

The Guidance Notes are set out in the<br />

following order:<br />

● Guidance Section 1 35<br />

Gives guidance as to why the <strong>Pro</strong>tocol takes<br />

the position it does on the recurring Core<br />

Principles it deals with. It also contains<br />

additional material on other matters that<br />

come up repeatedly in delay claims;<br />

● Guidance Section 2 36<br />

Represents a good practice guide on the<br />

preparation <strong>of</strong> work programmes and records,<br />

and their subsequent use for the management<br />

<strong>of</strong> extensions <strong>of</strong> time to contracts;<br />

● Guidance Section 3 37<br />

Constitutes a good practice guide on how<br />

to deal with extension <strong>of</strong> time applications<br />

during the currency or course <strong>of</strong> a contract;<br />

and<br />

● Guidance Section 4 38<br />

<strong>Pro</strong>vides valuable guidance as to how to<br />

analyse causes <strong>of</strong> and responsibility for delay<br />

where a project has been delayed, and the<br />

analysis is only conducted after the project<br />

is completed i.e. retrospectively.<br />

IV. Appendices<br />

The appendices supplement the Core<br />

Principles and the Guidance Notes with<br />

additional information so as to render the<br />

document as complete as practicable. These<br />

comprise the following:<br />

31. See also Appendix A at p56. Also called “Unparticularised”<br />

or “Rolled-Up Claims” or “Composite Claims” Ir. Harbans<br />

Singh K.S. ‘Engineering and Construction Contracts<br />

Management: Post-Commencement Practice” at p874 to<br />

877.<br />

32. See also Guidance Section 1.18 p30 & 31 <strong>of</strong> The SCL<br />

<strong>Pro</strong>tocol.<br />

33. See definition in Appendix A p55 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

34. See p10 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

35. See p10 to 34 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

36. See p35 to 41 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

37. See p42 to 45 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

38. See p46 to 49 <strong>of</strong> The SCL <strong>Pro</strong>tocol.


THE INGENIEUR ENGINEERING & LAW<br />

31<br />

● Appendix A: Definitions and glossary 39<br />

…. <strong>Pro</strong>vides explanations for words and<br />

expressions commonly used in situations where<br />

there has been delay to or disruption <strong>of</strong> a<br />

construction project. Not all the terms contained<br />

in the Appendix are to be found in the <strong>Pro</strong>tocol<br />

….;<br />

● Appendix B: Model Specification Clause 40<br />

As is aptly stated … the model clause has<br />

been drafted to be included in the specification<br />

section <strong>of</strong> a project’s tender documents. The<br />

requirements are intended to be suitable for large<br />

complex projects. However, the principles <strong>of</strong> the<br />

requirements represent good practice and should<br />

be applied to smaller projects where practicable.<br />

The words in the model clause will need to be<br />

reviewed and amended to ensure that the terms<br />

and terminology used are consistent with the<br />

conditions <strong>of</strong> contract and/or agreement for the<br />

project …..;<br />

● Appendix C: Model Records Clause 41<br />

The introduction to this Appendix C stipulates:<br />

The following model clauses have been drafted<br />

to be included in the specifications <strong>of</strong> a project’s<br />

tender documents (or in the Contract Conditions<br />

if the parties choose). Clause 1 is intended to<br />

be suitable for small projects and Clause 2 for<br />

medium to high value or medium to highly complex<br />

projects. Clause 2 could also be used in part on<br />

smaller projects, and the Employer could treat<br />

the list as a menu <strong>of</strong> potential documents that it<br />

would like to be submitted, depending on its level<br />

<strong>of</strong> risk, administrative staff and facilities”; and<br />

● Appendix D: Graphics illustrating points in this<br />

<strong>Pro</strong>tocol 42<br />

Sets out in Figures 1 to 9 illustrations <strong>of</strong><br />

principles and practice set out in the <strong>Pro</strong>tocol.<br />

Limitations/Criticism Of The <strong>Pro</strong>tocol<br />

Though the publication <strong>of</strong> The SCL <strong>Pro</strong>tocol has<br />

been welcomed by the construction industry with<br />

open arms and much accolades, it has nevertheless<br />

been subject to considerable scrutiny and criticism<br />

by a host <strong>of</strong> authorities who advise practitioners<br />

to adopt it with caution. One such authority is<br />

Carnell, who in his text entitled ‘Causation and<br />

Delay in Construction Disputes’ opines 43 :<br />

….. although the <strong>Pro</strong>tocol contains a wealth <strong>of</strong><br />

useful material and some helpful guidance, it does<br />

not really comprise a tool which can easily be used<br />

either to provide ready guidance in the management<br />

<strong>of</strong> delays as they occur over a project or for the<br />

resolution <strong>of</strong> disputes. This manifests itself in the<br />

growing practice <strong>of</strong> parties to disputes setting out<br />

in their submissions why they do not believe that<br />

the <strong>Pro</strong>tocol is applicable to the prevailing fact.<br />

The effect <strong>of</strong> this is <strong>of</strong>ten that, far from reducing<br />

the scope <strong>of</strong> disputes, the <strong>Pro</strong>tocol has actually<br />

introduced a further potential area <strong>of</strong> dissent.<br />

He then goes on further to list a number <strong>of</strong><br />

practical concerns, which include, inter alia, the<br />

following 44 :<br />

● The <strong>Pro</strong>tocol’s aim <strong>of</strong> becoming a tool by which<br />

delay is measured is doubtful in the light <strong>of</strong><br />

its failure to realize widespread acceptance by<br />

the Construction industry which, <strong>of</strong>ten than<br />

not, questions debate as to its applicability or<br />

particular sections <strong>of</strong> it;<br />

● The <strong>Pro</strong>tocol comprises a voluminous document<br />

containing ‘highly theoretical discussion <strong>of</strong><br />

sometimes complex and abstract ideas’. It<br />

therefore defeats the main goal <strong>of</strong> the <strong>Pro</strong>tocol<br />

being recognized by the Construction Industry<br />

as the best means <strong>of</strong> dealing with delay and<br />

disruption issues;<br />

● On a closer examination, the <strong>Pro</strong>tocol is not<br />

<strong>of</strong> much practical use to Sub-contractors and<br />

Sub-sub-contractors who in terms <strong>of</strong> numbers<br />

represent a significant proportion <strong>of</strong> the<br />

Construction industry;<br />

● The suggestion by the <strong>Pro</strong>tocol that there is a<br />

right approach to certain legal issues is a recipe<br />

for future contention and therefore dilutes its<br />

very goal <strong>of</strong> acceptance as the authority on these<br />

issues;<br />

● Not all <strong>of</strong> the core principles benefit from<br />

the accompanying guidance notes, the crossreferencing<br />

system is inadequate, etc. In short<br />

these compromise the clarity and effectiveness<br />

<strong>of</strong> the <strong>Pro</strong>tocol; and<br />

39. See p52 to 62 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

40. See p63 to 70 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

41. See p71 to 72 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

42. See p73 to 82 <strong>of</strong> The SCL <strong>Pro</strong>tocol.<br />

43. at p 218.<br />

44. See Carnell, N.J. “Causation and Delay in Construction<br />

Disputes” (2 nd Edn.) at p218 to 231.


32 ENGINEERING & LAW<br />

THE INGENIEUR<br />

● The <strong>Pro</strong>tocol’s recommendations on issues such<br />

as programme and records, principles relating<br />

to delay and compensation and procedure for<br />

dealing with extensions <strong>of</strong> time both during<br />

and after the project, though laudable, have<br />

many practical shortcomings that have been<br />

merely ‘glossed over’ instead <strong>of</strong> being adequately<br />

addressed. This shortcoming leads credence to<br />

distractors who dismiss the <strong>Pro</strong>tocol as being<br />

merely ‘a short textbook or a lengthy essay’.<br />

Carnell sums up this review <strong>of</strong> the <strong>Pro</strong>tocol and<br />

its shortcomings with the following brief write-up<br />

summing up his thoughts 45 :<br />

There is no doubt that the <strong>Pro</strong>tocol contains<br />

much valuable advice. Unfortunately, as presently<br />

constituted it is not a document which provides a<br />

code capable <strong>of</strong> being adopted by the industry as<br />

a whole and used as a generally accepted basis<br />

for dealing with change and delay.<br />

In particular, if the present document was to<br />

be reconstituted and divided so that the <strong>Pro</strong>tocol<br />

forms the core principles, with the remainder <strong>of</strong> the<br />

<strong>Pro</strong>tocol taking effect as a short discussion piece,<br />

it would be easier to see the <strong>Pro</strong>tocol being used<br />

widely. The section concerning the need to use<br />

properly constituted programme and to manage by<br />

reference to the programme is almost an end in<br />

itself and were the <strong>Pro</strong>tocol to be reconstituted to<br />

make this point alone, it would have more impact<br />

than the current document.<br />

It is suggested that this should be done in a<br />

way which encourages the parties to accept the<br />

wisdom in a way which encourages the parties to<br />

accept the wisdom <strong>of</strong> using a proper programme,<br />

rather than imposing an obligation to accept a<br />

programme and seeking to punish them in the<br />

event they do not.<br />

Conclusion<br />

For the <strong>Malaysia</strong>n Construction industry, there is<br />

at the moment no document or recognized guidelines<br />

pertaining to the issue <strong>of</strong> delay and disruption. At<br />

the most we have the various contractual stipulations<br />

in the form <strong>of</strong> either the terms <strong>of</strong> the contract or<br />

specifications that deal with the said matters; <strong>of</strong>ten<br />

in the most basic or skeletal form. Even then, each<br />

contract administrator or contractor approaches the<br />

issue in question on a purely subjective basis or<br />

per, the ‘informal standard practice’ <strong>of</strong> the particular<br />

group or discipline to which it belongs. Hence, in<br />

short there is neither a recognized standard practice<br />

nor a best practice. This laissaiz-faire attitude does<br />

not auger well for the industry to be fair, transparent<br />

and ‘world class’ as <strong>of</strong>ten parroted by the industry<br />

leaders and concerned politicians. In view <strong>of</strong> the<br />

above, it is high time that this area <strong>of</strong> practice is<br />

revisited and the lacuna properly and pr<strong>of</strong>essionally<br />

addressed. One such solution would be to look<br />

at the SCL <strong>Pro</strong>tocol and examine its suitability for<br />

possible adoption in <strong>Malaysia</strong>. Bearing in mind the<br />

various criticisms made against, the <strong>Pro</strong>tocol is still<br />

a valuable tool, ready-made and available ‘<strong>of</strong>f-theshelf’<br />

for our use i.e. if we are to decide so. Under<br />

the circumstances, we do have no other choice as<br />

it cannot be reasonably foreseen if ever, <strong>Malaysia</strong>ns<br />

have the resources and the political will to generate<br />

a better document. Hence, it is recommended<br />

that the SCL <strong>Pro</strong>tocol be thoroughly reviewed and<br />

adopted after having addressed suitably the criticisms<br />

levelled against it and amended it accordingly to<br />

suit the local conditions and culture. This should<br />

constitute, at the least, the first step in <strong>of</strong>fering the<br />

<strong>Malaysia</strong>n Construction Industry a document that<br />

can be recognized as a basis <strong>of</strong> standard practice<br />

and best practice. Here the pr<strong>of</strong>essionals like<br />

engineers, architects and quantity surveyors have<br />

to work hand in hand with Employers, Contractors,<br />

Sub-Contractors and Suppliers to help realize this<br />

important facet <strong>of</strong> industry good practice. <strong>BEM</strong><br />

REFERENCES<br />

● Brown, D. The NEC and JCT Contracts Claims<br />

Blackwell Publishing.<br />

● Carnell, N.J. Causation and Delay in<br />

Construction Disputes (2 nd Edn.), Blackwell<br />

Publishing.<br />

● Chappel, D. Building Contract Claims (4 th<br />

Edn.) Blackwell Publishing.<br />

● Davison, P. Evaluating Contract Claims<br />

Blackwell Publishing.<br />

● Ir. Harbans Singh K.S. Engineering and<br />

Construction Contracts Management: Post-<br />

Contract Award Practice Lexis-Nexis.<br />

● The Society <strong>of</strong> Construction Law Delay<br />

and Disruption <strong>Pro</strong>tocol 2002, SCL (Reprint<br />

2004).<br />

45. Ibid at p231.


THE INGENIEUR FEATURE<br />

33<br />

Building And Common <strong>Pro</strong>perty<br />

(Maintenance And Management)<br />

Act 2007<br />

By Andrew Wong, Advocate & Solicitor, High Court <strong>of</strong> Malaya<br />

On April 12, 2007, the<br />

Building & Common<br />

<strong>Pro</strong>perty (Maintenance<br />

& Management) Act 2007<br />

(BCPMMA) came into force<br />

in all States within Peninsular<br />

<strong>Malaysia</strong>. The main purpose<br />

<strong>of</strong> the Act is to provide for<br />

the proper maintenance and<br />

management <strong>of</strong> buildings and<br />

the common property, AFTER<br />

delivery <strong>of</strong> vacant possession by<br />

the developer to the purchasers<br />

AND BEFORE the management<br />

corporation comes into existence<br />

(the interim period) 1 .<br />

Vacant<br />

Possession<br />

Maintenance <strong>of</strong> building before BCPMMA<br />

Controller<br />

<strong>of</strong> Housing<br />

Contractual<br />

Period<br />

Developer<br />

Each State Authority will<br />

appoint a Commissioner <strong>of</strong><br />

Buildings (the Commissioner)<br />

to administer and carry out the<br />

provisions <strong>of</strong> the BCPMMA 2 .<br />

Unless otherwise stated<br />

reference to section <strong>of</strong> an<br />

enactment in this paper and the<br />

footnotes, refers to sections in the<br />

BCPMMA.<br />

Illustrations <strong>of</strong> the maintenance<br />

and management <strong>of</strong> a building<br />

before and after the BCPMMA<br />

are shown in Illustration No. 1,<br />

Illustration No. 2 and Illustration<br />

No. 3.<br />

MC comes<br />

into existence<br />

Initial Period<br />

MC managed<br />

by developer<br />

Illustration 1<br />

Director<br />

First Meeting<br />

<strong>of</strong> MC<br />

Scope <strong>of</strong> the BCPMMA<br />

The BCPMMA is intended<br />

to apply to any building or<br />

land intended for subdivision<br />

into parcels, and which have<br />

been developed for the purpose<br />

<strong>of</strong> accommodation, including<br />

accommodation for commercial<br />

and industrial use 3 .<br />

In line with the recent<br />

amendments made to the Strata<br />

1 S. 4(1).<br />

2 S. 3(1).<br />

3 S. 2 - definition <strong>of</strong> “developer”.<br />

Final<br />

MC managed<br />

by elected<br />

council


34 FEATURE<br />

THE INGENIEUR<br />

Titles Act, 1985 (Act 318),<br />

which now allows land to be<br />

subdivided into land parcels to<br />

be held under separate strata<br />

titles, the BCPMMA will also<br />

apply to prescribed buildings on<br />

such land.<br />

It is pertinent to note that<br />

the BCPMMA defines common<br />

property, more exhaustively than<br />

Act 318 and the Schedule H<br />

agreement under the Housing<br />

Development (Control &<br />

Flow chart showing the interim period<br />

under BCPMMA<br />

Commencement<br />

Vacant<br />

Possession<br />

Developer JMB<br />

Establishment<br />

<strong>of</strong> JMB<br />

Interim Final<br />

Illustration 2<br />

First Meeting<br />

<strong>of</strong> MC<br />

Organisation chart<br />

COMMISSIONER OF BUILDING<br />

Licensing) Regulations 1989<br />

(Schedule H).<br />

In Act 318, common property<br />

means so much <strong>of</strong> the lot as is<br />

not comprised in any parcel 4 .<br />

Schedule H extended this<br />

definition to include lifts, refuse<br />

chutes, drains, sewers, pipes,<br />

wires, cables, ducts and all<br />

facilities and installations used in<br />

common by all purchasers 5 .<br />

Common property in the<br />

BCPMMA is now extended to<br />

MC managed<br />

by elected<br />

council<br />

Delivery <strong>of</strong> vacant possession Interim Final<br />

Developer JMB<br />

MC<br />

Illustration 3<br />

include, all structural elements<br />

<strong>of</strong> the building, stairs, stairways,<br />

fire escapes, entrances and exits,<br />

corridors, lobbies, exterior <strong>of</strong> all<br />

common parts <strong>of</strong> the building,<br />

playing fields and recreational<br />

areas, walls and fences 6 .<br />

4 S. 4 <strong>of</strong> Act 318 - definition <strong>of</strong><br />

“common property”.<br />

5 Clause 35(c) <strong>of</strong> Schedule H, 1989<br />

Regulations.<br />

6 S. 2 - definition <strong>of</strong> “common<br />

property”.


THE INGENIEUR FEATURE<br />

35<br />

Joint Management Body<br />

During the interim period, the<br />

common property <strong>of</strong> any building<br />

or land intended for sub-division<br />

shall be in the hands <strong>of</strong> a Joint<br />

Management Body, which shall<br />

comprise the developer and the<br />

purchasers 7 . Up until now, the<br />

maintenance and management<br />

<strong>of</strong> a building intended to be subdivided<br />

and the common property<br />

(hereinafter referred to as the<br />

maintenance works), have always<br />

been the responsibility <strong>of</strong> the<br />

developer until the management<br />

corporation is established under<br />

Act 318.<br />

The Joint Management Body<br />

is a body corporate, having a<br />

common seal, and therefore can<br />

sue and be sued in its name 8 .<br />

The Joint Management Body<br />

shall be deemed to be dissolved<br />

three months from date <strong>of</strong> the<br />

first meeting <strong>of</strong> the management<br />

corporation 9 .<br />

The duties <strong>of</strong> the Joint<br />

Management Body are, amongst<br />

others, to:<br />

● maintain the common property<br />

and keep it in good serviceable<br />

repair;<br />

● fix and impose charges for the<br />

maintenance works;<br />

● insure the building and apply<br />

insurance moneys received for<br />

rebuilding and reinstatement;<br />

● prepare and maintain a register<br />

<strong>of</strong> all purchasers;<br />

● ensure that the Building<br />

Maintenance Fund is audited<br />

and provide financial<br />

statements to purchasers; and<br />

● enforce house rules 10 .<br />

The Joint Management Body is<br />

empowered to:<br />

● collect maintenance charges<br />

from purchasers;<br />

● authorise expenditure for<br />

carrying out the maintenance<br />

works;<br />

● recover monies due from<br />

purchasers;<br />

● acquire property for use by<br />

purchasers in connection with<br />

the common property;<br />

● secure the services <strong>of</strong> a person<br />

to undertake the maintenance<br />

works; and<br />

● make house rules 11 .<br />

If the development is<br />

completed before April 12, 2007,<br />

and vacant possession has been<br />

delivered to the purchasers and the<br />

management corporation is not in<br />

existence, the Joint Management<br />

Body must be established not<br />

later than April 11, 2008 12 .<br />

However, if the development<br />

is completed on or after April 12,<br />

2007, then the Joint Management<br />

Body shall be formed not later<br />

than 12 months from the date <strong>of</strong><br />

delivery <strong>of</strong> vacant possession <strong>of</strong><br />

the parcels to the purchasers 13 .<br />

There are no provisions in<br />

the BCPMMA to define when a<br />

development is completed. In line<br />

with the recent amendments to<br />

the Street, Drainage and Building<br />

Act, 1974 (Act 133), completion<br />

should mean the issue <strong>of</strong> the<br />

relevant certificate <strong>of</strong> completion<br />

and compliance.<br />

It is the duty <strong>of</strong> the developer<br />

to convene the first meeting <strong>of</strong><br />

all purchasers within the time<br />

frame set out above 14 . If the<br />

developer fails to convene this<br />

first meeting, the developer<br />

commits an <strong>of</strong>fence and shall on<br />

conviction, be liable to a fine<br />

not exceeding RM20,000, or<br />

to imprisonment for a term not<br />

exceeding three months or to<br />

both 15 . Further, if the developer<br />

fails to convene this first meeting,<br />

the Commissioner may appoint<br />

a person to convene the first<br />

meeting 16 .<br />

Until the Joint Management<br />

Body is established, the developer<br />

is responsible for the maintenance<br />

works 17 , and this includes the<br />

responsibility to insure the<br />

building against fire and other<br />

risks 18 .<br />

First Meeting <strong>of</strong> the Joint<br />

Management Body<br />

At its first meeting, the Joint<br />

Management Body shall elect a<br />

Joint Management Committee,<br />

and then confirm the taking<br />

over <strong>of</strong> insurances effected by<br />

developer, determine the amount<br />

to be paid by purchasers to the<br />

Building Maintenance Fund for<br />

the maintenance works, determine<br />

the rate <strong>of</strong> interest for late payment<br />

<strong>of</strong> charges and make decisions on<br />

any other matter connected with<br />

the maintenance works 19 .<br />

The quorum for the first<br />

meeting shall be one quarter<br />

<strong>of</strong> the purchasers who have<br />

paid maintenance charges to a<br />

Building Maintenance Account 20 .<br />

Only purchasers who have paid<br />

maintenance charges to the<br />

Building Maintenance Account<br />

are members entitled to vote.<br />

It would appear that the<br />

developer is not to be included in<br />

the determination <strong>of</strong> the quorum<br />

and is also not a person entitled<br />

to vote.<br />

It is not clear whether:<br />

(a) a purchaser is entitled to<br />

vote if he had previously paid<br />

maintenance charges to the<br />

Building Maintenance Account,<br />

but is at the time <strong>of</strong> the first<br />

meeting in arrears; or<br />

(b) a purchaser who has not<br />

paid maintenance charges to the<br />

Building Maintenance Account is<br />

entitled to attend the meeting or be<br />

elected to the Joint Management<br />

Committee, even though he is not<br />

entitled to vote.<br />

If, within half an hour <strong>of</strong> the<br />

time fixed for the first meeting,<br />

no quorum is present, then<br />

the members entitled to vote<br />

7 S. 4(4).<br />

8 S. 4(2) and 4(3).<br />

9 S. 15(1).<br />

10 S. 8(1).<br />

11 S. 8(2).<br />

12 S. 4(1)(a).<br />

13 S. 4(1)(b).<br />

14 S. 5(1).15 S. 5(5).<br />

16 S. 5(3).<br />

17 S. 5(4).<br />

18 S. 17(4).<br />

19 S. 6(1).<br />

20 S. 6(2).


36 FEATURE<br />

THE INGENIEUR<br />

who are present shall form the<br />

quorum 21 . Further, if after one<br />

hour, no member entitled to vote<br />

turns up or all members present<br />

refuse to be members <strong>of</strong> the<br />

Joint Management Committee,<br />

the meeting cannot take place,<br />

and the developer is required to<br />

inform the Commissioner within<br />

the next seven days <strong>of</strong> the illfated<br />

meeting. The Commissioner<br />

may then appoint a new date for<br />

the first meeting or appoint a<br />

managing agent to maintain the<br />

common property 22 .<br />

All resolutions at the first<br />

meeting shall be decided by a<br />

show <strong>of</strong> hands. Joint purchasers<br />

(e.g. husband and wife) are<br />

not entitled to vote except by<br />

a jointly appointed proxy 24 .<br />

However there are no express<br />

provisions for a purchaser who is<br />

a corporation, to appoint a proxy<br />

or a representative, to attend the<br />

first meeting and to vote.<br />

If the first meeting is<br />

successful, then within 28<br />

days thereafter, the Joint<br />

Management Body shall inform<br />

the Commissioner <strong>of</strong> the name<br />

<strong>of</strong> the Joint Management Body,<br />

and register its name with the<br />

Commissioner 25 .<br />

Annual General Meeting<br />

The annual general meeting<br />

<strong>of</strong> the Joint Management Body<br />

shall be held once a year and not<br />

more than 15 months shall elapse<br />

between date <strong>of</strong> one annual<br />

general meeting and the next 26 .<br />

The agenda is to consider the<br />

Building Maintenance Fund and<br />

transact such other businesses as<br />

may arise 27 .<br />

Extraordinary General<br />

Meeting<br />

An extraordinary general<br />

meeting may be convened by<br />

the Joint Management Body,<br />

upon requisition in writing made<br />

by persons who are registered as<br />

purchasers <strong>of</strong> at least one-quarter<br />

<strong>of</strong> the total number <strong>of</strong> parcels 28 ,<br />

or when the Joint Management<br />

Body receives a direction from<br />

the Commissioner to transact<br />

a particular business 29 , or on<br />

such other occasion as the Joint<br />

Management Body thinks fit 30 .<br />

The Commissioner may<br />

himself, authorise any purchaser<br />

to convene an extraordinary<br />

general meeting if he is satisfied<br />

that the Joint Management Body<br />

was not properly constituted 31 .<br />

It is pertinent to note that<br />

although the Act made provisions<br />

for rules to regulate the first<br />

meeting <strong>of</strong> the JMB, there are<br />

no provisions on how an AGM<br />

or EGM is to be conducted and<br />

it is not clear whether the rules<br />

on quorum and voting rights for<br />

the first meeting <strong>of</strong> the JMB will<br />

apply to an AGM or EGM.<br />

Joint Management<br />

Committee<br />

The duties and powers <strong>of</strong> the<br />

Joint Management Body are to<br />

be performed and exercised by a<br />

Joint Management Committee 32 ,<br />

who shall be elected by the<br />

Joint Management Body at its<br />

first meeting, and thereafter at its<br />

annual general meeting.<br />

The Joint Management<br />

Committee shall consist <strong>of</strong> the<br />

developer and not less than<br />

five and not more than 12<br />

purchasers 33 . A purchaser who is<br />

elected to the Joint Management<br />

Committee can only hold <strong>of</strong>fice<br />

for a period not exceeding three<br />

years or until the dissolution <strong>of</strong><br />

the Joint Management Body when<br />

the management corporation<br />

comes into existence.<br />

A chairman, a secretary and<br />

a treasurer shall be elected<br />

from members <strong>of</strong> the Joint<br />

Management Committee 34 . Since<br />

the developer is a member <strong>of</strong> the<br />

Joint Management Committee, its<br />

representative can be elected to<br />

any <strong>of</strong> the above three positions.<br />

<strong>Pro</strong>ceedings <strong>of</strong> the Joint<br />

Management Committee are<br />

regulated by the First Schedule <strong>of</strong><br />

the BCPMMA and it is pertinent<br />

to note that the developer has<br />

a vote in the Joint Management<br />

Committee, even though the<br />

developer may not have a right<br />

to vote at the first meeting <strong>of</strong><br />

the Joint Management Body. A<br />

member elected shall continue<br />

to be a member <strong>of</strong> the Joint<br />

Management Committee until he<br />

resigns, dies, becomes a bankrupt<br />

or is no longer a purchaser 35 .<br />

Once elected, a member <strong>of</strong> the<br />

Joint Management Committee is<br />

expected to devote as much time<br />

as is necessary to discharge his<br />

duty effectively 36 .<br />

Register <strong>of</strong> Purchasers<br />

The BCPMMA provides for the<br />

developer or the Joint Management<br />

Body, as the case may be, to<br />

maintain a register containing the<br />

following particulars in respect<br />

<strong>of</strong> all parcels in the development<br />

area 37 :<br />

● allocated share unit assigned<br />

to each parcel;<br />

● floor area <strong>of</strong> the parcel;<br />

● name and address <strong>of</strong> every<br />

purchaser;<br />

● name and address <strong>of</strong> solicitor<br />

acting for the purchaser; and<br />

● number <strong>of</strong> parcels unsold.<br />

Rights <strong>of</strong> purchasers<br />

A purchaser or a person who<br />

is a prospective purchaser may<br />

apply to the Joint Management<br />

Body for a certificate 38 , certifying<br />

the:<br />

21 S. 6(3).<br />

22 S. 6(7).<br />

23 S. 6(4).<br />

24 S. 6(5).<br />

25 S. 7(1).<br />

26 S. 9(2).<br />

27 S. 9(1).<br />

28 S. 10(2)(a).<br />

29 S. 10(2)(b).<br />

30 S. 10(2)(c).<br />

31 S. 10(3).<br />

32 S. 11(1).<br />

33 S. 11(2).<br />

34 S. 11(3).<br />

35 Paragraph 2(1) <strong>of</strong> First Schedule.<br />

36 Paragraph 11 <strong>of</strong> First Schedule.<br />

37 S. 12.<br />

38 S. 13.


THE INGENIEUR FEATURE<br />

37<br />

● amount <strong>of</strong> charges payable by<br />

a purchaser;<br />

● time and payment <strong>of</strong> the<br />

charges;<br />

● extent, if any, to which charges<br />

have been paid;<br />

● amount, if any, recoverable<br />

by Joint Management Body in<br />

respect <strong>of</strong> the parcel;<br />

● the sum standing in the credit<br />

<strong>of</strong> the Building Maintenance<br />

Fund and the sum committed<br />

or reserved for expenses<br />

already incurred;<br />

● nature <strong>of</strong> repairs and estimated<br />

expenditure where the Joint<br />

Management Body has<br />

incurred any expenditure or is<br />

about to perform any repairs<br />

or work in respect <strong>of</strong> which a<br />

liability is likely to be incurred<br />

by the purchaser <strong>of</strong> the parcel;<br />

and<br />

● amount paid or to be paid<br />

by the developer for unsold<br />

units.<br />

House Rules<br />

The Joint Management Body is<br />

required to keep a record <strong>of</strong> house<br />

rules which are in force from time<br />

to time 39 . If a purchaser applies<br />

for a copy <strong>of</strong> such house rules,<br />

the Joint Management Body shall<br />

furnish a copy to such purchaser,<br />

at a reasonable cost 40 . Further<br />

the Joint Management Body is<br />

required to make such house<br />

rules available for inspection to<br />

any person who satisfies the Joint<br />

Management Body that he has a<br />

proper interest in so applying 41 .<br />

A certified true copy <strong>of</strong> the<br />

house rules and any amendments<br />

thereto, under the seal <strong>of</strong> the<br />

Joint Management Body, are<br />

required to be lodged by the<br />

Joint Management Body with the<br />

Commissioner 42 .<br />

Dissolution <strong>of</strong> the Joint<br />

Management Body<br />

The Joint Management Body<br />

shall be deemed to be dissolved<br />

three months from the date <strong>of</strong><br />

first meeting <strong>of</strong> the management<br />

corporation 43 . However, within<br />

one month after first meeting <strong>of</strong><br />

the management corporation,<br />

the Joint Management Body is<br />

required to hand over to the<br />

management corporation, the<br />

house rules, the audited accounts<br />

<strong>of</strong> the Building Maintenance<br />

Fund, or if such accounts have<br />

not been audited, the un-audited<br />

accounts, all assets and liabilities<br />

<strong>of</strong> the Joint Management Body,<br />

and all records related to and<br />

necessary for maintenance <strong>of</strong><br />

building and common property 44 .<br />

If only the un-audited accounts<br />

have been handed over, the Joint<br />

Management Body is required to<br />

hand over to the management<br />

corporation the audited accounts<br />

<strong>of</strong> the Joint Management Body not<br />

later than three months after the<br />

first meeting <strong>of</strong> the management<br />

corporation 45 .<br />

If the Joint Management<br />

Body fails to comply with these<br />

provisions on handover, every<br />

member <strong>of</strong> the Joint Management<br />

Body commits an <strong>of</strong>fence which<br />

is punishable with a fine <strong>of</strong><br />

not more than RM10,000, and<br />

a further fine <strong>of</strong> not more than<br />

RM1,000, for every day during<br />

which the <strong>of</strong>fence is continued,<br />

unless the member <strong>of</strong> the Joint<br />

Management Body proves that<br />

the <strong>of</strong>fence was committed<br />

without his knowledge, consent<br />

or connivance and that he had<br />

taken all reasonable precautions<br />

and had exercised due diligence<br />

to prevent the commission <strong>of</strong> the<br />

<strong>of</strong>fence 46 .<br />

It is difficult to understand the<br />

rationale to punish every member<br />

<strong>of</strong> the Joint Management Body<br />

(which means the developer and<br />

all the purchasers), when such<br />

matters are actually under the<br />

management and control <strong>of</strong> the<br />

Joint Management Committee.<br />

Building Maintenance<br />

Account and the Building<br />

Maintenance Fund<br />

The Building Maintenance<br />

Account is an account operated<br />

by the developer before the Joint<br />

Management Body is formed 47 .<br />

When the Joint Management Body<br />

is formed, any surplus moneys<br />

in the Building Maintenance<br />

Account shall be transferred to a<br />

fund to be known as the Building<br />

Maintenance Fund, which shall<br />

be maintained, administered<br />

and controlled by the Joint<br />

Management Body 48 .<br />

If the development is<br />

completed after April 12, 2007,<br />

it is very clear that the BCPMMA<br />

requires the developer to open a<br />

Building Maintenance Account<br />

in the name <strong>of</strong> the development<br />

area, before delivery <strong>of</strong> vacant<br />

possession to the purchasers 49 .<br />

Each development area shall have<br />

a separate Building Maintenance<br />

Account 50 .<br />

The developer shall deposit<br />

into the Building Maintenance<br />

Account, all maintenance charges<br />

received from purchasers, and all<br />

maintenance charges to be paid<br />

by the developer for parcels which<br />

have not been sold 51 . The charges<br />

to be paid by the developer shall<br />

be <strong>of</strong> the same amount as that<br />

payable by the purchasers had<br />

the parcels been sold 52 .<br />

Before the BCPMMA, there<br />

was uncertainty as to whether a<br />

developer is required to contribute<br />

maintenance charges for unsold<br />

units. Now, the developer’s duty<br />

to pay such charges is very clear,<br />

and if the developer fails to<br />

comply, the developer commits<br />

an <strong>of</strong>fence and may be liable<br />

to a fine <strong>of</strong> an amount between<br />

RM10,000 and RM100,000, and<br />

to a further fine <strong>of</strong> up to RM1,000<br />

for every day during which the<br />

<strong>of</strong>fence is continued 53 .<br />

39 S. 14(1)(a).<br />

40 S. 14(1)(b).<br />

41 S. 14(1)(c).<br />

42 S. 14(2).<br />

43 S. 15(1).<br />

44 S. 15(2)(a).<br />

45 S. 15(2)(b).<br />

46 S. 15(3) and 15(4).<br />

47 S. 16(1) and 16(3).<br />

48 S. 22.<br />

49 S. 16(1).<br />

50 S. 16(2).<br />

51 S. 17(1).<br />

52 S. 17(1).<br />

53 S. 17(7).


38 FEATURE<br />

THE INGENIEUR<br />

The Act specifically prohibits<br />

any person from collecting any<br />

charges from any purchaser for<br />

maintenance or management,<br />

unless the Building Maintenance<br />

Account has been opened in the<br />

name <strong>of</strong> the development area<br />

and vacant possession has been<br />

delivered to the purchaser 54 .<br />

If the development was<br />

completed on or before April<br />

12, 2007, and the developer<br />

has immediately before that<br />

day been collecting charges for<br />

maintenance from purchasers, the<br />

developer may continue to do so<br />

until the Joint Management Body<br />

has been established 55 . Since the<br />

developer is still responsible for<br />

the maintenance <strong>of</strong> the building<br />

and the common property until<br />

the Joint Management Body is<br />

established, one would expect<br />

that most developers will continue<br />

to collect such charges from the<br />

purchasers.<br />

The question is whether, after<br />

April 12, 2007, such charges<br />

collected by the developer are<br />

required to be deposited into the<br />

Building Maintenance Account.<br />

From a reading <strong>of</strong> relevant<br />

provisions in the BCPMMA, it<br />

would appear that if the developer<br />

continues to collect maintenance<br />

charges after April 12, 2007 until<br />

the Joint Management Body is<br />

formed, these maintenance charges<br />

are required to be deposited by<br />

the developer into the Building<br />

Maintenance Account. Hence the<br />

developer is required to open the<br />

Building Maintenance Account<br />

immediately and deposit all<br />

maintenance charges collected<br />

from the purchasers into the<br />

Building Maintenance Account<br />

within two working days <strong>of</strong><br />

receipt. At the same time the<br />

developer is also required to pay<br />

into the Building Maintenance<br />

Account, all maintenance charges<br />

for parcels which have not been<br />

sold.<br />

Moneys in the Building<br />

Maintenance Account shall not<br />

be deemed to form part <strong>of</strong> the<br />

property <strong>of</strong> the developer in the<br />

event <strong>of</strong> insolvency and some<br />

sort <strong>of</strong> a statutory trust has been<br />

created by the BCPMMA over<br />

such moneys 56 .<br />

The developer is required<br />

to keep proper accounts <strong>of</strong> the<br />

Building Maintenance Account<br />

and to appoint a pr<strong>of</strong>essional<br />

auditor to audit the Building<br />

Maintenance Account annually 57 .<br />

A copy <strong>of</strong> the audited accounts<br />

and the auditor’s report is<br />

required to be filed with the<br />

Commissioner within 14 days<br />

after the accounts have been<br />

audited 58 . The Commissioner<br />

shall have full and free access to<br />

all records relating to the Building<br />

Maintenance Account 59 .<br />

Developer to account for all<br />

moneys collected prior to<br />

April 12, 2007<br />

In addition, any developer<br />

<strong>of</strong> a development which has<br />

been completed but for which<br />

a management corporation<br />

has not been established, shall<br />

not later than six months from<br />

April 12, 2007, submit to the<br />

Commissioner, an account<br />

audited by an auditor, <strong>of</strong> all<br />

moneys collected and expended<br />

for the purposes <strong>of</strong> maintenance<br />

and management, and sinking<br />

fund (if any) prior to April 12,<br />

2007 60 . Failure to do so will<br />

render the developer liable to a<br />

fine <strong>of</strong> not less than RM10,000<br />

but not more than RM100,000 or<br />

to imprisonment for a term not<br />

exceeding one year or to both 61 .<br />

Building Maintenance Fund<br />

The Building Maintenance<br />

Fund shall consist <strong>of</strong> maintenance<br />

charges imposed by or payable to<br />

the Joint Management Body, and<br />

all other moneys received by the<br />

Joint Management Body, under<br />

whatever circumstances 62 .<br />

The Building Maintenance<br />

Fund shall be used for purposes<br />

<strong>of</strong> repairing and maintaining the<br />

common property, and is a fund<br />

to be maintained, administered<br />

and controlled by the Joint<br />

Management Body.<br />

Presumably, once the<br />

surplus moneys in the Building<br />

Maintenance Account (if any) are<br />

transferred by the developer to the<br />

Building Maintenance Account,<br />

the developer may close the<br />

Building Maintenance Account.<br />

Payment <strong>of</strong> maintenance<br />

charges<br />

Every purchaser is liable to pay<br />

the charges for the maintenance<br />

and management <strong>of</strong> the common<br />

property and the amount shall<br />

be determined by the Joint<br />

Management Body in proportion<br />

to the allocated share units 63 .<br />

A developer who continues to<br />

collect charges before the Joint<br />

Management Body is formed may<br />

continue to collect such amount<br />

that has been determined by the<br />

developer 64 .<br />

Payment is to be made within<br />

14 days <strong>of</strong> receiving a written<br />

notice requesting for payment,<br />

which must be supported by<br />

a statement <strong>of</strong> charges issued<br />

by the developer or the Joint<br />

Management Body, as the case<br />

may be 65 . If at the end <strong>of</strong> the<br />

fourteen days period, payment<br />

is not made by the purchaser,<br />

the Joint Management Body<br />

may impose interest for payment<br />

interest provided that the rate <strong>of</strong><br />

interest shall not exceed 10% per<br />

annum 66 .<br />

Where maintenance charges<br />

become recoverable by the Joint<br />

Management Body, the Joint<br />

Management Body may institute<br />

legal proceedings in any court<br />

54 S. 20(1)(a) and 20(1)(b).<br />

55 S. 20(2).<br />

56 S. 19.<br />

57 S. 17(2).<br />

58 S. 17(2)(c).<br />

59 S. 17(2)(d).<br />

60 S. 21(1).<br />

61 S. 21(3).<br />

62 S. 22(2).<br />

63 S. 23(1) and 23(2).<br />

64 S. 20(2).<br />

65 S. 23(3) and 23(4).<br />

66 S. 23(5).


THE INGENIEUR FEATURE<br />

39<br />

having jurisdiction, to recover the<br />

amount due to them, after having<br />

given to the defaulting purchaser<br />

the requisite notices 67 .<br />

Further, if the amount <strong>of</strong><br />

charges payable is in arrears for<br />

six months, the Commissioner<br />

may be requested by the Joint<br />

Management Body to issue a<br />

warrant <strong>of</strong> attachment authorising<br />

attachment <strong>of</strong> any moveable<br />

property belonging to the<br />

purchaser which may be found<br />

in the parcel or elsewhere within<br />

the local authority area 68 .<br />

The warrant <strong>of</strong> attachment shall<br />

be executed by an <strong>of</strong>ficer from<br />

the Commissioner’s <strong>of</strong>fice and he<br />

may effect forcible entry 69 .<br />

If arrears and collection<br />

charges are not paid within<br />

seven days <strong>of</strong> the attachment, the<br />

property attached may be sold by<br />

public auction and the amount<br />

recovered from the auction, after<br />

deduction <strong>of</strong> collection charges,<br />

shall be deposited into the<br />

Building Maintenance Fund 70 .<br />

Any surplus from the auction<br />

shall be paid to the person who<br />

at the time <strong>of</strong> attachment was in<br />

possession <strong>of</strong> the property 71 .<br />

All the provisions relating to<br />

payment and recovery <strong>of</strong> charges<br />

refer only to payment to be made<br />

by the purchasers and there<br />

are no provisions for recovery<br />

from a developer who fails to<br />

pay charges for unsold units. A<br />

warrant <strong>of</strong> attachment may not be<br />

issued against a developer who is<br />

in arrears, as only a purchaser’s<br />

movable property can be attached.<br />

Failure or refusal to pay is<br />

now a statutory <strong>of</strong>fence<br />

Any person who, without<br />

reasonable excuse, fails or<br />

refuses to pay maintenance and<br />

management charges shall be<br />

liable to a fine not exceeding<br />

RM5,000 and a further fine<br />

not exceeding RM50 for every<br />

day during which the <strong>of</strong>fence<br />

is continued after conviction 72 .<br />

However, what may constitute<br />

a reasonable excuse not to pay<br />

remains to be seen.<br />

Apart from the above statutory<br />

<strong>of</strong>fence, if the developer fails<br />

to pay maintenance charges for<br />

unsold units, he is liable for an<br />

additional <strong>of</strong>fence 73 , under which<br />

he may be liable to pay a fine<br />

<strong>of</strong> not less than RM10,000 but<br />

not more than RM100,000, and<br />

a further fine not exceeding<br />

RM1,000 for every day during<br />

which the <strong>of</strong>fence is continued.<br />

Managing Agent<br />

The Commissioner has the<br />

power to appoint a managing<br />

agent to maintain and manage<br />

the building or land intended for<br />

sub-division and the common<br />

property, in the event that all<br />

the members present at the first<br />

meeting <strong>of</strong> the Joint Management<br />

Body refuse to be members <strong>of</strong> the<br />

Joint Management Committee 74 ,<br />

or if the Commissioner is<br />

satisfied, after due inquiry,<br />

that the developer or the Joint<br />

Management Body is not<br />

maintaining or managing the<br />

building satisfactorily 75 .<br />

The managing agent shall<br />

have control <strong>of</strong> all moneys in the<br />

Building Maintenance Account<br />

or the Building Maintenance<br />

Fund, as the case may be, and<br />

all moneys received by him<br />

shall be paid into the Building<br />

Maintenance Account or the<br />

Building Maintenance Fund, as<br />

the case may be 76 .<br />

He shall perform all the duties<br />

and exercise the powers as if he<br />

was acting as the developer or the<br />

Joint Management Body, including<br />

giving notice to the purchasers<br />

to pay maintenance charges<br />

and instituting proceedings to<br />

recover outstanding charges 77 .<br />

The remuneration or fees <strong>of</strong> the<br />

managing agent shall be charged<br />

to the Building Maintenance<br />

Account or the Building<br />

Maintenance Fund, as the case<br />

may be 78 .<br />

A person shall not be appointed<br />

as a managing agent if he has a<br />

pr<strong>of</strong>essional or pecuniary interest<br />

in the property 79 and he shall be<br />

regarded as having a pr<strong>of</strong>essional<br />

or pecuniary interest, if he has<br />

been responsible for the design<br />

and construction, or he or his<br />

nominees, <strong>of</strong>ficers or employees<br />

has any material interest in the<br />

property, or he is a partner or is<br />

in the employment <strong>of</strong> a person<br />

who has a material interest, or he<br />

or his family holds any interest<br />

in the building or land 80 .<br />

A managing agent is required<br />

to lodge a bond with the<br />

Commissioner, to make good any<br />

loss caused by him as a result <strong>of</strong><br />

his failure to account for moneys<br />

received or held by him 81 . If he<br />

fails to pay moneys into Building<br />

Maintenance Account or the<br />

Building Maintenance Fund, or<br />

if he fails to submit requisite<br />

statements to the Commissioner,<br />

he commits an <strong>of</strong>fence and may<br />

be liable to a fine not exceeding<br />

RM10,000, or to imprisonment<br />

for a term not exceeding two<br />

years, or to both 82 .<br />

Developer to pay deposit to<br />

rectify defects on common<br />

property<br />

The appointment <strong>of</strong> a<br />

managing agent does not relieve<br />

the developer <strong>of</strong> his obligation to<br />

carry out repairs to the common<br />

property or make good defects<br />

in the common property, during<br />

the defects liability period,<br />

and the developer still has the<br />

responsibility to carry out repairs<br />

and varied and additional works<br />

to ensure that development is<br />

constructed in accordance with<br />

67 S. 32.<br />

68 S. 33(1).<br />

69 S. 33(3) and 33(4).<br />

70 S. 33(7).<br />

71 S. 33(8).<br />

72 S. 34.<br />

73 S. 17(7).<br />

74 S. 25(1)(a).<br />

75 S. 25(1)(b).<br />

76 S. 28(1) and 28(3).<br />

77 S. 28(2) and S. 38(3).<br />

78 S. 25(3).<br />

79 S. 26(1).<br />

80 S. 26(2).<br />

81 S. 27.<br />

82 S. 28(5).


40 FEATURE<br />

THE INGENIEUR<br />

High rise buildings in Kuala Lumpur<br />

plans and specifications approved<br />

by the competent authority 83 .<br />

The BCPMMA now requires<br />

the developer to deposit (cash<br />

or bank guarantee) with the<br />

Commissioner such sum as shall<br />

be prescribed, for the purpose<br />

<strong>of</strong> carrying out works to rectify<br />

any defects in the common<br />

property after its completion 84 .<br />

This deposit shall be paid<br />

upon handing over <strong>of</strong> vacant<br />

possession to the purchasers 85 .<br />

Any unexpended deposit shall be<br />

refunded to developer on expiry<br />

<strong>of</strong> the defect liability period for<br />

the development area 86 . If the<br />

developer fails to comply, he can<br />

be punished with a fine <strong>of</strong> not<br />

more than RM5,000 and a further<br />

fine <strong>of</strong> not more than RM50 for<br />

every day during which <strong>of</strong>fence<br />

is continued 87 .<br />

Power <strong>of</strong> entry<br />

The BCPMMA empowers the<br />

Commissioner to authorise any<br />

person to enter any building or<br />

land for purpose <strong>of</strong> carrying out<br />

inspection or investigation to<br />

determine whether any <strong>of</strong>fence<br />

has been committed, and books,<br />

accounts or documents may be<br />

seized on such entry 88 .<br />

Entry is also permitted for the<br />

purpose <strong>of</strong> executing any works<br />

required by the local authority 89 .<br />

However, if a building or premises<br />

is occupied, no entry shall be<br />

permitted unless the occupier or<br />

a representative is present during<br />

the entry 90 . No private dwelling<br />

shall be entered upon except<br />

with consent <strong>of</strong> the purchaser or<br />

after giving 24 hours’ notice to<br />

the occupier 91 .<br />

In the case <strong>of</strong> any urgent<br />

repairs or works the Commissioner<br />

may, at all reasonable times enter<br />

any building 92 . The Act provides<br />

penal sanctions for anyone who<br />

assaults, obstruct hinders or<br />

delay entry authorised by the<br />

Commissioner 93 .<br />

Other contracts and deeds<br />

no longer apply<br />

The provisions <strong>of</strong> any written<br />

law, contracts and deeds relating<br />

to maintenance and management<br />

<strong>of</strong> buildings and the common<br />

property, in so far as they are<br />

contrary to the provisions <strong>of</strong> the<br />

BCPMMA, shall cease to have<br />

effect 94 and the provisions <strong>of</strong><br />

the BCPMMA shall have effect<br />

notwithstanding anything to<br />

the contrary contained in any<br />

agreement or contract entered<br />

into after the commencement <strong>of</strong><br />

the BCPMMA 95 .<br />

Further, no agreement or<br />

contract entered into after<br />

commencement shall operate to<br />

annul, vary or exclude any <strong>of</strong> the<br />

provisions <strong>of</strong> the BCPMMA. <strong>BEM</strong><br />

83 S. 29(a) and 29(b).<br />

84 S. 31(1).<br />

85 S. 31(2).<br />

86 S. 31(5).<br />

87 S. 31(6).<br />

88 S. 38(1)(a).<br />

89 S. 38(1)(b).<br />

90 S. 38(2).<br />

91 S. 38(3).<br />

92 S. 38(4).<br />

93 S. 38(5).<br />

94 S. 44.<br />

95 S. 45.


THE INGENIEUR FEATURE<br />

41<br />

PROFILE –<br />

The <strong>Malaysia</strong>n Institute<br />

Of Arbitrators<br />

The <strong>Malaysia</strong>n Institute <strong>of</strong> Arbitrators (MIArb) was established in 1991. The main goals and purposes <strong>of</strong><br />

MIArb are :<br />

(1) to promote the facilities for the determination <strong>of</strong> disputes by the arbitration process;<br />

(2) to provide means <strong>of</strong> communications between members <strong>of</strong> the Institute and other bodies concerned<br />

with arbitration within the country or overseas;<br />

(3) to co-operate with other pr<strong>of</strong>essional bodies having the same common interests in arbitration;<br />

(4) to provide training and educational facilities for members who are desirous <strong>of</strong> becoming arbitrators<br />

and to promote the study <strong>of</strong> the law and practice relating to arbitration, subject to the Education<br />

Act, 1961;<br />

(5) to arrange for and provide facilities for meetings, seminars, conferences and workshops and arrange<br />

for the reading and presentation <strong>of</strong> lectures and demonstrations <strong>of</strong> the arbitration proceedings;<br />

(6) to provide a wider knowledge <strong>of</strong> the practice and the law <strong>of</strong> arbitration;<br />

(7) to provide for the appointment <strong>of</strong> arbitrators for the settlement <strong>of</strong> disputes.<br />

Our MIArb Arbitration Rules (2005 Edition) are up-to-date and aim to overcome the common pitfalls <strong>of</strong><br />

arbitration as well as ensuring fair and speedy disposal <strong>of</strong> disputes. The rationale <strong>of</strong> MIArb Arbitration<br />

rules include recognition <strong>of</strong> party autonomy; flexibility for modification or simplification <strong>of</strong> arbitration<br />

procedure to suit nature and extent <strong>of</strong> disputes; facilitating expeditions proceedings; deferment <strong>of</strong> case<br />

stated or challenge <strong>of</strong> interim awards/decisions until after the main award or substantive merits are made,<br />

yet preserving a party’s right to challenge an interlocutory decision or interim award. The MIArb Rules<br />

can be adapted for use in complex or simple arbitrations in different fields or industries.<br />

MIArb plans to extend its coverage to other forms <strong>of</strong> ADRs such as mediation, adjudication, etc. It is<br />

also MIArb’s plan in the long term to formulate its forms <strong>of</strong> contract for use by various industries and<br />

fields.<br />

MIArb publishes Newsletters regularly. These Newsletters contain among others, articles on topics<br />

relevant to arbitration. MIArb also organises Seminars and Workshops on topics relevant to arbitration<br />

and alternative dispute resolution (ADR).<br />

There are three categories <strong>of</strong> membership in MIArb namely, Associates, Members and Fellows. MIArb<br />

Fellows, the highest category <strong>of</strong> membership, comprises retired judges <strong>of</strong> the Superior Courts and active<br />

practicing arbitrators <strong>of</strong> extensive experience. Our distinguished Fellows are well known for their<br />

experience and impartiality. MIArb Members, the second category, comprises pr<strong>of</strong>essionals from various<br />

disciplines who have hands-on experience in arbitration, whether in capacity as arbitrators, counsels,<br />

advisers or expert witnesses. Our Members and Associates are from a wide spectrum <strong>of</strong> pr<strong>of</strong>essional<br />

disciplines, including architects, engineers, insurance brokers, lawyers, loss adjusters, quantity surveyors,<br />

valuers, etc. The wide spectrum <strong>of</strong> pr<strong>of</strong>essionals in our membership <strong>of</strong>fers much choice for arbitrating<br />

parties to appoint an arbitrator with the relevant expertise and experience.<br />

Fellows <strong>of</strong> MIArb are entitled to use the designation FMIArb, while the Members and Associates<br />

bear the designations MMIArb and AMIArb respectively. There is one-time Entrance Fee <strong>of</strong> RM250,<br />

Annual Subscription Fees for Fellow, Member and Associate categories are RM250, RM200 and RM150<br />

respectively.


42 FEATURE<br />

THE INGENIEUR<br />

Dispute On Arbitrators,<br />

Advertising And Ethics<br />

By C.K. Khoo<br />

This paper was presented at the Kuala Lumpur Regional Centre for Arbitration<br />

An Arbitrator Development <strong>Pro</strong>gramme: January 22 - 23, 1992, revised January 2007<br />

The familiar tale <strong>of</strong> the three blind men<br />

each with his own unique description <strong>of</strong> an<br />

elephant may aptly apply to laymen’s notions<br />

<strong>of</strong> arbitration and arbitrators. They harbour feelings<br />

<strong>of</strong> respect, awe, admiration, envy, scepticism,<br />

cynicism or contempt, depending on the impressions<br />

gained from their personal encounters.<br />

Encounters however are relatively few and<br />

arbitration is not a feature <strong>of</strong> the average person’s<br />

experience, nor even that <strong>of</strong> the average practitioner<br />

<strong>of</strong> any pr<strong>of</strong>ession, although most pr<strong>of</strong>essionals have<br />

some degree <strong>of</strong> awareness <strong>of</strong> the subject and will<br />

quickly learn more about it when the need arises.<br />

Now all this might change and arbitrators might be<br />

poised to project themselves into the public eye,<br />

if one sector <strong>of</strong> the community prevails with its<br />

proposal to permit arbitrators to advertise. Some<br />

may react with disbelief, but self-styled avant<br />

garde are actively propounding that arbitration is<br />

no different from any other pr<strong>of</strong>essional business,<br />

and should fall in line with modern thinking on<br />

permitting pr<strong>of</strong>essionals to publicise their services<br />

for the benefit <strong>of</strong> those who need them and do not<br />

know where to turn. Given the benefit <strong>of</strong> doubt, an<br />

admirable samaritan act it could be, but it cannot<br />

be justified by such simplistic argument. Serious<br />

issues surface, and these go to the very roots <strong>of</strong><br />

the ethics <strong>of</strong> arbitration and arbitrators.<br />

The <strong>of</strong>fice <strong>of</strong> arbitrator is commissioned only<br />

by appointment on a case-to-case basis and in the<br />

normal course <strong>of</strong> events expires upon publication<br />

<strong>of</strong> award in each case. In a wider sense the term<br />

‘arbitrator’ is <strong>of</strong>ten used to denote:<br />

(i) an appointed arbitrator who holds current<br />

<strong>of</strong>fice [hereinafter called “ARBITRATOR”];<br />

(ii) one whose arbitral <strong>of</strong>fice has expired<br />

[hereinafter called “arbitrator”];<br />

(iii) one who aspires to arbitral <strong>of</strong>fice [hereinafter<br />

called “arbitrator”].<br />

The three categories are not mutually exclusive,<br />

and a person can be any or all <strong>of</strong> the three, at<br />

different times or all at the same time. The reason<br />

why I draw attention to such distinctions will<br />

become clear if you will bear with me.<br />

Disputes are hideous monsters some <strong>of</strong> us are<br />

forced to live with from time to time. Disputes<br />

and their resolution with or without ARBITRATOR<br />

or Court usually cause much stress to the parties<br />

and contribute nothing to real economic growth.<br />

They actually hamper real economic growth, as<br />

parties and their staff, advisors and experts are<br />

diverted from their normal production activities to<br />

attend to dispute resolution. Nonetheless, disputes<br />

need to be resolved. The engines <strong>of</strong> real economic<br />

growth are: Agriculture, Mining, Manufacturing<br />

and Services. No doubt dispute resolution may be<br />

considered a service but it is a unique service in<br />

the sense that it does not produce anything that<br />

adds to the economic growth <strong>of</strong> society, but merely<br />

transfers money from one pocket to another. Thus<br />

notwithstanding its usefulness to parties in dispute,<br />

it is erroneous (as sometimes propagated) to say<br />

that arbitration (or dispute resolution) is ‘a growing<br />

industry’.<br />

The mention <strong>of</strong> advertising reminds me <strong>of</strong> an<br />

arbitrator canvassing for appointment (because<br />

he had not enough arbitration ‘jobs’ to do?) and<br />

prompted someone to remark:<br />

I should hope that ARBITRATION is one <strong>of</strong> the<br />

last remaining noble callings. Arbitrators perform<br />

their duty when called upon to do so but we<br />

should not wish that there will be more disputes<br />

to arbitrate.<br />

Granted that disputes will arise independently<br />

<strong>of</strong> and not in answer to arbitrators’ prayers (if any<br />

- God forbid!), and that a would-be ARBITRATOR’s<br />

private thoughts and motives towards each new<br />

dispute that rears its ugly head are not exposed<br />

to public scrutiny, yet we must be sure that our<br />

conduct should not lead the public to think they<br />

detect signs <strong>of</strong> joy! If arbitrators do not conduct<br />

themselves with proper decorum it might provoke<br />

others to indulge in reverie: that it must be far<br />

more congenial to be arbitrating other people’s<br />

problems than to be beset by one’s own. The crux<br />

<strong>of</strong> the matter is that the public regard <strong>of</strong> arbitrators,<br />

ARBITRATORS and ARBITRATION should not be<br />

tarnished by any kind <strong>of</strong> negative publicity. I fear


THE INGENIEUR FEATURE 43<br />

that advertising by arbitrators, however ‘dignified’,<br />

could not but impress upon the public that the<br />

objective <strong>of</strong> such advertising is to tout for ‘jobs’ and<br />

promote lucrative ARBITRATION ‘practices’ and that<br />

justice may well be compromised in the pursuit <strong>of</strong><br />

such objective. Perhaps some noble soul might rise<br />

above suspicion if he advertised to <strong>of</strong>fer his services<br />

gratis or for just a nominal fee to meet his basic<br />

needs and expenses, but that is another story.<br />

I am not in favour <strong>of</strong> advertising by arbitrators.<br />

I firmly believe that it is inconsistent with the<br />

ethics <strong>of</strong> arbitration. In broad terms while ‘ethics’<br />

means for most pr<strong>of</strong>essionals that with every<br />

commission he undertakes he works himself out<br />

<strong>of</strong> the job at optimum benefit-cost to his client,<br />

for the arbitrator the standard is somewhat higher<br />

and he should wish that the odious events<br />

which call for his services would not happen too<br />

<strong>of</strong>ten if at all, let alone pr<strong>of</strong>fering his services<br />

in the market place! In other words, the ethics<br />

<strong>of</strong> arbitration requires that arbitrators shall be<br />

persons who uphold the kind <strong>of</strong> moral values<br />

which would make them ‘reluctant’ ARBITRATORS<br />

who answer the call only if they are deemed fit<br />

for service to resolve disputes that regrettably<br />

arise, and the same ethics disqualify ardent selfserving<br />

candidates. I recognize that such ideals<br />

are utopian and will be hard put to survive in<br />

the real utilitarian world but that does not mean<br />

that we should not keep them in sight (publicly)<br />

and in mind (privately) for at least, even though<br />

they may not be practised with religious fervour,<br />

they furnish guidelines that point the way towards<br />

some semblance <strong>of</strong> order.<br />

While acknowledging that some pr<strong>of</strong>essions<br />

have assumed more liberal attitudes towards<br />

advertising, we should remember that after<br />

all ARBITRATORS are not in the same boat<br />

as Counsel (<strong>of</strong> legal or any other discipline),<br />

but rather they are auxiliary to judiciary, no<br />

less! The difference between a Judge and an<br />

ARBITRATOR is that the latter is usually one<br />

who has specialist technical skill in the subject<br />

matter <strong>of</strong> the dispute, practises in his specialised<br />

field and not in the Judiciary as a Judge does,<br />

but is ‘co-opted’ to temporary judiciary service<br />

if the occasion should ever arise for him to<br />

serve. It would not be proper for an arbitrator<br />

to advertise his availability or competence as a<br />

potential ARBITRATOR, anymore than it would<br />

be for anyone to publicly pr<strong>of</strong>fer himself as a<br />

potential Judge. Judges are remunerated for their<br />

services by the State and do not ask for fee from<br />

litigants. There is merit in structuring a similar<br />

system for arbitrators who see ARBITRATION as<br />

a full time calling thus allowing such arbitrators<br />

to make their arbitral services available within<br />

the framework <strong>of</strong> a public institution rather than<br />

through commercial enterprise. For the rest <strong>of</strong> our<br />

fraternity, let us continue to be called upon, for<br />

we are not (and should not be) in the habit <strong>of</strong><br />

calling upon potential ARBITRATION ‘clients’.<br />

Scholarly research may show that there are<br />

laws which account for the orderly behaviour <strong>of</strong><br />

arbitrators and arbitration. Meanwhile, not having<br />

applied the rigorous scientific methods required<br />

to test and establish laws, I would state several<br />

hypotheses:<br />

Hypothesis I: An arbitrator abhors disputes but<br />

enjoys resolving them.<br />

Hypothesis II: An arbitrator does not practise.<br />

(‘To practise’ being understood as<br />

“to operate a business <strong>of</strong>fering and<br />

rendering pr<strong>of</strong>essional services”)<br />

Hypothesis III: An arbitrator lives and thrives in<br />

a constant state <strong>of</strong> ‘non-practice’<br />

and his <strong>of</strong>fice is activated for the<br />

duration he is appointed to resolve<br />

a dispute.<br />

Hypothesis IV: An arbitrator has no clients.<br />

Hypothesis V: Arbitration is not a commercial<br />

enterprise or an industry.<br />

Perhaps within such hypotheses, and others which<br />

are relevant, we might discover basic philosophies<br />

or tenets to guide us. It is a subject which merits<br />

diligent study by those who believe in arbitration<br />

as an institution for dispute resolution.<br />

While it behoves the individual arbitrator to<br />

keep a low pr<strong>of</strong>ile, a disputant who needs to resort<br />

to arbitration for the first time may well ask: “where<br />

can I find a suitable arbitrator?” This question can<br />

be answered by any <strong>of</strong> the arbitral or pr<strong>of</strong>essional<br />

institutions such as RCAKL, MIArb, IEM, PAM, ISM,<br />

etc. Such institutions may publicize their role as<br />

bodies for referral whenever ARBITRATION services<br />

are required. Each institution should maintain a<br />

computerised list <strong>of</strong> members with particulars <strong>of</strong><br />

their pr<strong>of</strong>essional qualifications and specialized<br />

fields <strong>of</strong> experience. When a referral is made<br />

to the institution the computer records will be<br />

searched and a list made <strong>of</strong> the most appropriate<br />

persons who would then be notified and asked to<br />

respond to indicate their availability and from this<br />

enquiry a short-list <strong>of</strong> candidates can be prepared<br />

and sent to the disputing parties who may then<br />

communicate with some <strong>of</strong> the candidates selected<br />

from such a list and at this point these candidates<br />

can do their private ‘advertising’ by mail.<br />

To advertise or not to advertise? This question<br />

represents the tip <strong>of</strong> the iceberg that represents a<br />

much more serious and fundamental issue - to go<br />

or not to go commercial (i.e. to be in ‘practice’<br />

or ‘non-practice’) - which is the real issue that<br />

needs to be addressed. <strong>BEM</strong>


44 FEATURE<br />

THE INGENIEUR<br />

Structural Inspection Of<br />

Existing Bridges<br />

By Ir. Chong Min Khong<br />

Permas Jaya bridge<br />

In any rehabilitation <strong>of</strong> existing structures or effective<br />

maintenance, a thorough structural assessment <strong>of</strong><br />

the structures is necessary. This would give a clear<br />

picture <strong>of</strong> the current state <strong>of</strong> the structures. Generally,<br />

this could be achieved through a combination <strong>of</strong>:-<br />

(a) structural inspection<br />

(b) structural assessment<br />

The intent <strong>of</strong> this paper is to outline the<br />

recommendations for the structural inspection <strong>of</strong><br />

existing bridges. It should be emphasized that the<br />

extent and details <strong>of</strong> the assessment process should<br />

be tailored to each structure. Structural assessment,<br />

which involves the strength evaluation <strong>of</strong> the existing<br />

structure is not covered in this paper.<br />

Desk Study<br />

Generally, desk study should first be carried out.<br />

The purpose <strong>of</strong> the desk study is to obtain as much<br />

existing information as possible about the structures.<br />

These would include “as built” drawings, construction<br />

records, maintenance history, inspection records,<br />

previous test data, etc. and should be sought by the<br />

Client.<br />

It is possible that some if not all <strong>of</strong> these structures<br />

could have been evaluated and assessed by the<br />

relevant authority/owners through their maintenance<br />

programme. Thus, the above information, wherever<br />

possible, should be retrieved from the relevant<br />

authority/owners, who might have a database <strong>of</strong> their<br />

structures. However, it should be appreciated that not<br />

all <strong>of</strong> this information may be available, particularly<br />

for older structures. Nonetheless, effort should be<br />

made to obtain as much information as this would<br />

assist in confirming the information to be collected<br />

on site and in increasing the confidence level in<br />

the subsequent structural assessment.<br />

Where sufficient information is not available<br />

through the relevant authority/owners, attempts<br />

should be made to contact other sources such as the<br />

original designer and/or construction organisations.<br />

The dimensions <strong>of</strong> the various components <strong>of</strong><br />

the bridge structures could be verified by field<br />

surveys.<br />

Field Investigation<br />

A field survey and inspection should be carried<br />

out to:-<br />

● Verify the accuracy <strong>of</strong> existing information<br />

obtained earlier<br />

● Verify the construction details, form <strong>of</strong><br />

articulation, etc. in general terms<br />

● Gather new and additional information<br />

● Identify signs <strong>of</strong> defects, deterioration, water<br />

staining, vulnerable areas <strong>of</strong> the structure, access<br />

requirements, traffic management requirements<br />

to minimise the disruption to traffic, etc.<br />

● Obtain samples for laboratory testing, if the<br />

need arises.<br />

A field inspection team would comprise an<br />

Inspection Engineer accompanied by two to three<br />

technicians. The Evaluation Engineer should also<br />

familiarise himself with first-hand information on the<br />

condition <strong>of</strong> the bridge he is to evaluate. Typically,<br />

inspection equipment would consist <strong>of</strong> measuring<br />

tapes, hammer, camera, special vehicle or mobile<br />

elevated work platform (for high & wide bridges<br />

to allow for inspection <strong>of</strong> the underside <strong>of</strong> the


THE INGENIEUR FEATURE 45<br />

bridge structure over the parapets), torchlight and<br />

safety clothing and gears.<br />

The severity <strong>of</strong> the surface condition could be<br />

rated using a numerical index from 0 to 5 as a<br />

guide such as:<br />

0 - Not Applicable<br />

1 - As New<br />

2 - Good<br />

3 - Fair<br />

4 - Poor<br />

5 - Unsafe<br />

It should be noted that this rating on its own<br />

does not represent the overall structural condition<br />

<strong>of</strong> the bridge.<br />

Visual surveys would be undertaken to detect<br />

possible:-<br />

● Structural defects such as crack, deflection,<br />

settlement, etc.<br />

● Signs <strong>of</strong> staining, efflorescence, etc.<br />

● Component behaviour as such as vibration,<br />

etc.<br />

● <strong>Pro</strong>blems <strong>of</strong> joint connection, expansion joints,<br />

bearings, drainage, etc.<br />

It may be necessary to use binoculars to gain<br />

detailed knowledge <strong>of</strong> the condition <strong>of</strong> the bridge<br />

for areas <strong>of</strong> the bridge<br />

which cannot be seen from<br />

the ground (e.g. bearing<br />

shelves). Any observed or<br />

suspected defects would<br />

then be inspected at a<br />

touching distance using a<br />

special vehicle or mobile<br />

elevated work platform or<br />

other appropriate access<br />

equipment.<br />

The details (including<br />

sketches) and severity <strong>of</strong><br />

deformation should be<br />

jotted on a prescribed<br />

and standardised format.<br />

Fig. 1 shows a sample<br />

<strong>of</strong> a bridge pr<strong>of</strong>orma.<br />

Reports <strong>of</strong> visual inspection<br />

should be supplemented<br />

by photographs whenever<br />

possible.<br />

Non-Destructive Tests<br />

Visual inspection gives<br />

an indication <strong>of</strong> surface<br />

condition <strong>of</strong> the members.<br />

Often, deterioration is only<br />

detected visually when it is<br />

Fig 1 – Sample <strong>of</strong> <strong>Pro</strong>forma<br />

at its advanced stage. The use <strong>of</strong> non-destructive<br />

testing is therefore recommended as it could give<br />

signs or early warning <strong>of</strong> the presence <strong>of</strong> adverse<br />

deterioration.<br />

The technical documentation and site inspection<br />

sheets would be reviewed to confirm the initial test<br />

programme for the bridge in terms <strong>of</strong> the testing<br />

required and test locations. Such testing would be<br />

carried out on a representative area <strong>of</strong> the structure<br />

which would include parts both in visually good<br />

condition as well as those exhibiting defects.<br />

The following field tests may be helpful:-<br />

● Cover Survey<br />

– To measure the depth <strong>of</strong> concrete cover to<br />

individual bars and, if required to determine the<br />

diameters <strong>of</strong> the reinforcement. Care should be taken<br />

when using cover meter as readings are affected by<br />

the location and numbers <strong>of</strong> lapping bars and bar<br />

size. Hacking may be necessary to confirm the size<br />

and condition <strong>of</strong> reinforcement.<br />

● Hammer Survey<br />

– A simple method <strong>of</strong> locating delamination is by<br />

tapping on the surface <strong>of</strong> the structure with a hammer<br />

during the course <strong>of</strong> the visual surveys.


46 FEATURE<br />

THE INGENIEUR<br />

● Schmidt Rebound Hammer<br />

– A quick test to check the strength <strong>of</strong> the concrete.<br />

These may need to be verified by conducting<br />

compressive test on concrete core samples where<br />

appropriate.<br />

● Ultrasonic Pulse Velocity<br />

– To identify the homogenity <strong>of</strong> the concrete, cracks<br />

and voids.<br />

● Depth <strong>of</strong> Carbonation<br />

– This is normally measured by spraying phenolphthalein<br />

indicator onto a freshly broken concrete surface.<br />

Uncarbonated concrete is characterised by a deep<br />

pink colour. In practice, it has been found that<br />

sufficiently accurate results can <strong>of</strong>ten be obtained<br />

and less damage caused to the concrete by slowly<br />

drilling into the concrete and allowing the dust to<br />

fall onto a filter paper soaked in phenolphthalein.<br />

The depth <strong>of</strong> the hole at which the dust turns pinks<br />

indicates the depth <strong>of</strong> carbonation.<br />

● Half-Cell Potential Measurement<br />

– To provide an economic means <strong>of</strong> identifying<br />

the probability <strong>of</strong> active corrosion being present,<br />

provided the various factors which can influence<br />

potential readings, such as changes in temperature<br />

and concrete moisture content are recognised and<br />

taken into account.<br />

While half-cell potential maps are useful in<br />

predicting the likely site <strong>of</strong> active corrosion (and<br />

when interpreted by trained staff, can usually<br />

indicate whether general or pitting corrosion is<br />

occurring) they do not provide any data on the<br />

rate <strong>of</strong> corrosion.<br />

● Chemical Tests<br />

– Cement content, alkali level, sulphate, chloride,<br />

etc could be determined by the removal <strong>of</strong> concrete<br />

dust samples. Samples would be obtained by rotary<br />

percussive drilling using 20-25mm diameter bits<br />

and collecting the dust samples in purpose-made<br />

collection tubes.<br />

● Petrographic Analysis<br />

– To diagnose the presence <strong>of</strong> alkali-silica reaction,<br />

ettringite formation, etc.<br />

● Tendon Investigation<br />

– The condition <strong>of</strong> the tendon within prestressed<br />

members would only be investigated if there is any<br />

concern about their condition. It would therefore<br />

be carried out after the condition survey and the<br />

initial assessment <strong>of</strong> the results <strong>of</strong> the survey.<br />

The locations <strong>of</strong> the prestressing ducts would<br />

initially be determined from the ‘as-built’ drawings.<br />

However, it has been found in practice that the<br />

ducts could vary significantly from their design<br />

positions and that radar and/or radiography can<br />

provide a valuable aid to their precise location.<br />

Reporting & Rehabilitation Options<br />

On completion <strong>of</strong> the visual inspections and<br />

testing a condition report would be prepared<br />

providing details <strong>of</strong> all testing carried out and the<br />

results obtained. A diagnosis <strong>of</strong> the condition <strong>of</strong><br />

the structures would be made with a prognosis <strong>of</strong><br />

likely future deterioration.<br />

Recommendations should also be made as to any<br />

preventative works and maintenance programmes<br />

that need to be implemented to avoid subsequent<br />

deterioration.<br />

Pending further structural assessment, options for<br />

repair and refurbishment works or total replacement<br />

would be reviewed.<br />

Conclusion<br />

The importance <strong>of</strong> structural assessment <strong>of</strong><br />

any structure before any rehabilitation option is<br />

proposed could not be over-emphasized. The level<br />

and extent <strong>of</strong> the assessment is dependent on each<br />

structure and its condition. Thus, it is important<br />

that time and budget be allocated by the Client<br />

for this exercise. <strong>BEM</strong>


48 FEATURE<br />

THE INGENIEUR<br />

Strata Titles (Amendment)<br />

Act 2007<br />

By Andrew Wong, Advocate & Solicitor, High Court <strong>of</strong> Malaya<br />

This paper was presented at the 14 th <strong>Malaysia</strong>n Law Conference on October 29, 2007.<br />

Background <strong>of</strong> strata titles legislation<br />

The <strong>Malaysia</strong>n concept <strong>of</strong> sub-dividing a building was imported from New South Wales, Australia<br />

and was first introduced in West <strong>Malaysia</strong> on January 1, 1966 by the National Land Code, 1965<br />

(NLC). Individual parcels or units <strong>of</strong> property, within a multi-storey building, were then held under<br />

a separate subsidiary title.<br />

In time, the demand for ownership <strong>of</strong> flats, apartments, condominiums and commercial premises<br />

grew rapidly and the makeshift provisions in the NLC were found to be inadequate and in 1985, the<br />

Strata Titles Act (Act 318) came into force to govern the issue <strong>of</strong> strata titles for such properties.<br />

We now have land titles issued under the NLC and titles issued under Act 318. Registration <strong>of</strong><br />

dealings relating to strata titles are still governed by the NLC.<br />

On April 12, 2007, Strata<br />

Titles (Amendment) Act<br />

(A1290) came into force<br />

and made amendments to:<br />

● provide for the sub-division <strong>of</strong><br />

land into land parcels;<br />

● implement the computerization<br />

system <strong>of</strong> strata titles in the<br />

land registry;<br />

● add provisions relating to the<br />

application for sub-division<br />

and application for strata<br />

titles;<br />

● delete provisions which deal<br />

with low cost buildings;<br />

● define the initial period,<br />

determination <strong>of</strong> contributions<br />

payable during the initial<br />

period and made it mandatory<br />

for accounts during the initial<br />

period to be audited;<br />

● introduce a new Section<br />

40A to make it mandatory<br />

for original proprietors and<br />

purchasers to execute the<br />

transfer <strong>of</strong> ownership <strong>of</strong> strata<br />

titles;<br />

● empower a Commissioner<br />

<strong>of</strong> Buildings to oversee the<br />

management <strong>of</strong> buildings by<br />

management corporations;<br />

● enable buildings with no<br />

c e r t i f i c a t e o f f i t n e s s o r<br />

approved buildings plans to<br />

be sub-divided into parcels;<br />

and<br />

● add provisions relating to<br />

provisional blocks and allow<br />

for payment <strong>of</strong> quit rent on a<br />

parcel instead <strong>of</strong> on the lot,<br />

and<br />

● clarify the duties and powers<br />

<strong>of</strong> the Strata Titles <strong>Board</strong>.<br />

Subdivision <strong>of</strong> land into<br />

land parcels<br />

By far, the most interesting<br />

amendments introduced by Act<br />

A1290 are those made to meet<br />

the needs <strong>of</strong> the new housing<br />

development concept referred to<br />

as Gated Community Schemes<br />

or ‘GACOS’. Before Act A1290,<br />

1 S. 6(1).<br />

strata titles could only be issued<br />

for multi-storey buildings and<br />

single storey buildings on the<br />

same lot.<br />

Now, land with buildings <strong>of</strong> not<br />

more than four storeys can also<br />

be sub-divided into land parcels<br />

for the issue <strong>of</strong> strata titles.<br />

This amendment has effectively<br />

enlarged the types <strong>of</strong> strata<br />

schemes available to property<br />

developers.<br />

Unless otherwise stated, reference<br />

to sections <strong>of</strong> an enactment in<br />

this paper and the footnotes,<br />

refers to sections in Act 318, as<br />

amended by Act A1290.<br />

Strata schemes<br />

Any building having two or<br />

more storeys on one lot <strong>of</strong> land<br />

is capable <strong>of</strong> being sub-divided<br />

into parcels, each to be held<br />

under a separate strata title 1 .<br />

This is the most commonly used<br />

strata scheme in <strong>Malaysia</strong> and is<br />

illustrated as Scheme A.


THE INGENIEUR FEATURE 49<br />

B e f o r e A c t A 1 2 9 0 , a ny<br />

building or buildings having<br />

only one storey, on the same<br />

lot <strong>of</strong> land is capable <strong>of</strong> being<br />

sub-divided into parcels, each to<br />

be held under a separate strata<br />

title. This strata scheme is not<br />

so commonly used as it is not<br />

cost effective and is illustrated as<br />

Scheme B. Scheme B has been<br />

deleted by Act A1290.<br />

After Act A1290, land in<br />

the same lot can also be subdivided<br />

into land parcels, to<br />

be held under separate strata<br />

titles 2 . However, each land parcel<br />

must have a completed building<br />

thereon, <strong>of</strong> not more than four<br />

storeys 3 , and therefore, vacant<br />

land cannot be a land parcel<br />

to be held under a strata title.<br />

This scheme is illustrated as<br />

Scheme C.<br />

Finally, any alienated land<br />

having two or more buildings<br />

held as one lot under final title<br />

is capable <strong>of</strong> being sub-divided<br />

into land parcels, each to be<br />

held under a separate strata title 4 .<br />

The notable difference here is<br />

that a multi-storey building is<br />

not required to be in the same<br />

lot <strong>of</strong> land and this allows for<br />

development <strong>of</strong> an up-market<br />

Gated Community Schemes<br />

(GACOS), illustrated as Scheme<br />

D.<br />

Computerization <strong>of</strong><br />

strata titles<br />

I n W e s t M a l a y s i a ,<br />

computerization <strong>of</strong> titles issued<br />

under the NLC, which commenced<br />

some time ago, have been<br />

completed in all States, and have<br />

greatly improved the registration <strong>of</strong><br />

dealings. Most legal practitioners<br />

are already familiar with the<br />

computerization system <strong>of</strong> titles<br />

issued under the NLC.<br />

Act A1290 sought to introduce<br />

similar provisions found in the NLC<br />

and provides for the coming into<br />

operation <strong>of</strong> the computerization<br />

system <strong>of</strong> strata titles in the land<br />

registry 5 .<br />

Scheme A - Multi-storey buildings<br />

Scheme B<br />

Building<br />

Parcel<br />

Application for subdivision<br />

Under an amended Section 8,<br />

the circumstances under which<br />

it is compulsory for a proprietor<br />

<strong>of</strong> any alienated land on which<br />

there is a completed building<br />

capable <strong>of</strong> being sub-divided, to<br />

apply for sub-division have been<br />

changed. Compulsory application<br />

for sub-division is only required<br />

2 S. 6(1).<br />

3 S. 4 - definition <strong>of</strong> “land parcel”<br />

4 S. 6(1A).<br />

5 S. 4A.<br />

Club House<br />

Building<br />

Parcel<br />

Club House<br />

Parcel<br />

if the proprietor <strong>of</strong> an alienated<br />

land has sold or agreed to sell<br />

any parcel in such building.<br />

Generally, if a sale is made<br />

before completion or erection <strong>of</strong><br />

the building, the application for<br />

sub-division is required to be<br />

made within six months from the<br />

date <strong>of</strong> completion or erection. If<br />

a sale is made after completion<br />

or erection <strong>of</strong> the building, the


50 FEATURE<br />

THE INGENIEUR<br />

Scheme C<br />

Scheme D<br />

Club House<br />

Double Storey<br />

Bungalow<br />

Parcel<br />

application for sub-division is<br />

required to be made within six<br />

months from the date <strong>of</strong> the<br />

sale.<br />

Completion or erection means<br />

when the certificate <strong>of</strong> fitness<br />

for occupation or the certificate<br />

<strong>of</strong> completion and compliance,<br />

as the case may be, has been<br />

issued 6 , and ‘sale’ includes ‘an<br />

agreement to sell’.<br />

Where an application is not<br />

made within the prescribed<br />

period or within such time as<br />

may be extended by the Director,<br />

the original proprietor shall be<br />

guilty <strong>of</strong> an <strong>of</strong>fence and shall,<br />

Club House<br />

Single Storey Terrace House<br />

Double Storey<br />

Semi-Detached<br />

Houses<br />

Double Storey<br />

Bungalows<br />

Land<br />

Parcel<br />

on conviction, be liable to a<br />

fine <strong>of</strong> not less than RM10,000<br />

but not more than RM100,000<br />

and to a further fine <strong>of</strong> not less<br />

than RM100 but not more than<br />

RM1,000 for every day during<br />

which the <strong>of</strong>fence continues to<br />

be committed 7 .<br />

Deletion <strong>of</strong> provisions relating<br />

to low cost buildings<br />

The provisions for low-cost<br />

buildings which were contained<br />

6 S. 8(8).<br />

7 S. 8(7).<br />

in Part IX, Sections 58-67 <strong>of</strong><br />

Act 318, were deleted by Act<br />

A1290.<br />

Under the old Section 64,<br />

the management corporation<br />

<strong>of</strong> a low-cost building comes<br />

into existence only upon the<br />

completion <strong>of</strong> the transfer <strong>of</strong><br />

strata title in respect <strong>of</strong> all the<br />

parcels by the original proprietor,<br />

unless an order has been made<br />

by the Director on an application<br />

made by parcel proprietors (other<br />

than the original proprietor)<br />

having share units totalling more<br />

than half <strong>of</strong> total share units <strong>of</strong><br />

all parcels.<br />

The deletion <strong>of</strong> provisions<br />

relating to low cost buildings<br />

means that, for the purpose <strong>of</strong><br />

determining when the management<br />

corporation comes into existence,<br />

there is now no difference between<br />

low cost buildings and non-low<br />

cost buildings. In both cases, the<br />

management corporation will<br />

come into existence upon the<br />

opening <strong>of</strong> the book <strong>of</strong> strata<br />

register.<br />

<strong>Pro</strong>visions for classification <strong>of</strong><br />

low cost buildings by the State<br />

Authority are now contained in<br />

a new Section 10B, which also<br />

provides that the State Authority<br />

may, on an application by the<br />

management corporation, or on its<br />

own motion, appoint a managing<br />

agent to exercise powers and<br />

discharge duties and functions <strong>of</strong><br />

the management corporation.<br />

New definition <strong>of</strong><br />

initial period<br />

Initial period, in relation<br />

to a management corporation,<br />

was defined as the period<br />

commencing on the day on which<br />

the management corporation is<br />

formed and ending on the day<br />

when the purchasers <strong>of</strong> at least<br />

one-third <strong>of</strong> the aggregate share<br />

units <strong>of</strong> the parcels are registered<br />

as parcel proprietors.


THE INGENIEUR FEATURE 51<br />

Act A1290 has amended the<br />

initial period to make it expire<br />

when the purchasers <strong>of</strong> at least<br />

one-quarter <strong>of</strong> the aggregate share<br />

units <strong>of</strong> the parcels are registered<br />

as parcel proprietors 8 .<br />

This means that the first<br />

annual general meeting <strong>of</strong> the<br />

management corporation can be<br />

convened earlier than before,<br />

so that the elected council can<br />

then take over the maintenance<br />

and management <strong>of</strong> the common<br />

property and perform and exercise<br />

the duties and powers <strong>of</strong> the<br />

management corporation.<br />

It is pertinent to note that the<br />

penalty which may be imposed<br />

on the original proprietor who<br />

fails to convene the first annual<br />

general meeting within one month<br />

after the expiration <strong>of</strong> the initial<br />

period has been enhanced from<br />

a fine not exceeding RM1,000 to<br />

a fine not exceeding RM25,000<br />

and a further fine not exceeding<br />

RM2,000 for each day the <strong>of</strong>fence<br />

continues to be committed 9 .<br />

Contributions payable during<br />

the initial period<br />

Where the first annual general<br />

m e e t i n g o f a m a n a g e m e n t<br />

c o r p o r a t i o n h a s n o t b e e n<br />

convened, the proprietor <strong>of</strong> the<br />

parcels or provisional blocks shall,<br />

commencing from the opening <strong>of</strong><br />

the book <strong>of</strong> strata register, pay to<br />

the management corporation any<br />

sum determined by the original<br />

proprietor as the contributions<br />

payable by the parcel proprietors<br />

to the management fund 10 .<br />

Before Act A1290, the amount<br />

<strong>of</strong> contribution was such sum<br />

which has been approved by<br />

the Director, and obviously this<br />

did not work well, as many<br />

developers did not apply to the<br />

Director for an approved sum<br />

and merely continued to collect<br />

the sum originally determined by<br />

them under the contract <strong>of</strong> sale.<br />

Any proprietor who is not<br />

satisfied with the sum determined<br />

by the original proprietor may<br />

Condominium<br />

apply to the Commissioner for<br />

a review 11 and any amount<br />

determined by the Commissioner<br />

shall be deemed to be the amount<br />

determined by the management<br />

corporation.<br />

Accounts <strong>of</strong> the management<br />

corporation to be audited<br />

Before Act A1290, there was<br />

no requirement for the accounts<br />

<strong>of</strong> the management corporation<br />

during the initial period, to be<br />

audited and correspondingly, at<br />

the first annual general meeting<br />

<strong>of</strong> the management corporation<br />

8 S. 4 - definition <strong>of</strong> “initial period”.<br />

9 S. 41(2).<br />

10 S. 41A (1).<br />

11 S. 41A (2).<br />

12 S. 40(4).<br />

13 S. 41(5) (e).<br />

there was no requirement for<br />

any audited accounts <strong>of</strong> the<br />

management corporation to be<br />

presented.<br />

Act A1290 now requires the<br />

accounts <strong>of</strong> the management<br />

corporation during the initial<br />

period to be audited by a<br />

registered auditor appointed by<br />

the original proprietor, and to be<br />

presented to the Commissioner<br />

<strong>of</strong> Buildings 12 . In addition,<br />

the audited accounts <strong>of</strong> the<br />

management corporation are<br />

to be presented at the first<br />

annual general meeting <strong>of</strong> the<br />

management corporation 13 .


52 FEATURE<br />

THE INGENIEUR<br />

Mandatory to execute transfer<br />

<strong>of</strong> ownership <strong>of</strong> strata titles<br />

Under a new Section 40A,<br />

any original proprietor or any<br />

person appointed by a court<br />

<strong>of</strong> competent jurisdiction shall<br />

execute the transfer <strong>of</strong> strata<br />

titles to the parcel proprietors<br />

within 12 months from the date<br />

<strong>of</strong> issue <strong>of</strong> strata titles by the<br />

Land Administrator or within such<br />

extended time approved by the<br />

Director.<br />

Likewise, any purchaser shall<br />

execute complete documents <strong>of</strong><br />

transfer <strong>of</strong> strata titles within 12<br />

months from the date <strong>of</strong> notice<br />

<strong>of</strong> transfer <strong>of</strong> strata titles issued<br />

by the original proprietor or from<br />

the date <strong>of</strong> purchase <strong>of</strong> the parcel,<br />

whichever is the later.<br />

Any person who fails to<br />

comply with the above provisions<br />

shall be guilty <strong>of</strong> an <strong>of</strong>fence and<br />

shall on conviction, be liable to<br />

a fine <strong>of</strong> not less than RM1,000<br />

and not more than RM10,000<br />

per parcel.<br />

These mandatory provisions<br />

will perhaps go a long way<br />

to solve the ever increasing<br />

problems caused by the delaying<br />

tactics <strong>of</strong> the original proprietor<br />

or the purchasers, as the case<br />

may be, to complete the transfer<br />

<strong>of</strong> strata titles, which in turn is<br />

the principal cause <strong>of</strong> delay in<br />

convening the first annual general<br />

meeting <strong>of</strong> the management<br />

corporation.<br />

Section 40A will further<br />

e n h a n c e e x i s t i n g s t a t u t o r y<br />

p r o v i s i o n s r e g u l a t i n g t h e<br />

transfer <strong>of</strong> strata titles relating<br />

to housing accommodation.<br />

Under Regulation 11A(3) <strong>of</strong> the<br />

Housing Development (Control<br />

and Licensing) Regulations, 1989<br />

(1989 Regulations), in a sale <strong>of</strong><br />

housing accommodation to which<br />

no separate title has been issued,<br />

a housing developer is required to<br />

execute the instrument <strong>of</strong> transfer<br />

within 21 days from the date<br />

the separate title is subsequently<br />

issued and received by the<br />

High-rise buildings<br />

housing developer and thereafter<br />

forward the same to the purchaser<br />

who shall execute the instrument<br />

<strong>of</strong> transfer within 21 days from<br />

the receipt <strong>of</strong> the same from the<br />

housing developer.<br />

Any person who contravenes<br />

any <strong>of</strong> the provisions <strong>of</strong> the 1989<br />

Regulations shall be guilty <strong>of</strong><br />

an <strong>of</strong>fence and shall be liable<br />

on conviction to a fine not<br />

exceeding RM5,000 or to a term <strong>of</strong><br />

imprisonment not exceeding three<br />

years or to both 14 and any person<br />

who knowingly and willfully aids<br />

and abets the commission <strong>of</strong> an<br />

<strong>of</strong>fence against any provisions <strong>of</strong><br />

the 1989 Regulations shall be<br />

liable to be punished with the<br />

same punishment provided for<br />

the <strong>of</strong>fence 15 .<br />

It is now quite common for:<br />

(a) purchasers who have defaulted<br />

in their loan to refuse or neglect<br />

to come forward and execute<br />

the instrument <strong>of</strong> transfer,<br />

when the strata titles relating<br />

to their properties have been<br />

issued, presumably for the<br />

reason that these purchasers<br />

are not willing to fork out<br />

additional monies to complete<br />

the transfer for properties for<br />

14 Regulation 13(1) <strong>of</strong> 1989 Regulations.<br />

15 Regulation 13(3) <strong>of</strong> 1989 Regulations.<br />

16 S. 3(1) <strong>of</strong> Act 663.<br />

which foreclosure proceedings<br />

have been commenced by the<br />

respective financiers;<br />

(b) financiers <strong>of</strong> such properties,<br />

not to make any effort to<br />

complete the transfer <strong>of</strong> the<br />

strata titles, which they are<br />

entitled to do under the power<br />

<strong>of</strong> attorney granted to them,<br />

as such financiers prefer to<br />

have the liberty to conduct<br />

non-judicial auctions;<br />

(c) liquidators appointed by a<br />

court in respect <strong>of</strong> a developer<br />

under liquidation to refuse<br />

or neglect, for whatever<br />

reasons they have, to execute<br />

the instrument <strong>of</strong> transfer<br />

when strata titles have been<br />

issued.<br />

Perhaps, the new Section 40A,<br />

coupled with strict enforcement<br />

<strong>of</strong> Regulation 11A (3) will<br />

make purchasers, financiers and<br />

liquidators fulfill their respective<br />

obligations to execute the<br />

instrument <strong>of</strong> transfer when the<br />

strata titles have been issued.<br />

The Commissioner <strong>of</strong><br />

Buildings<br />

The Commissioner <strong>of</strong> Buildings<br />

is a person appointed under<br />

Section 3 <strong>of</strong> the Building and<br />

Common <strong>Pro</strong>perty (Maintenance<br />

and Management) Act 2007 (Act<br />

663), which also came into force<br />

on April 12, 2007. Under Act<br />

663, the State Authority may, in<br />

respect <strong>of</strong> a local authority area<br />

or any other area, appoint a<br />

Commissioner for the purposes <strong>of</strong><br />

administering and carrying out the<br />

provisions <strong>of</strong> Act 663 16 , and the<br />

Commissioner shall have charge<br />

<strong>of</strong> administration Parts VI and VII<br />

<strong>of</strong> Act 318.<br />

Hence, in respect <strong>of</strong> the rights<br />

and obligations attaching to


THE INGENIEUR FEATURE<br />

53<br />

individual parcels and provisional<br />

blocks 17 and the management<br />

<strong>of</strong> a sub-divided building 18 , the<br />

Commissioner has replaced the<br />

Director and the Commissioner<br />

will now be the person in charge<br />

to oversee all matters relating<br />

thereto.<br />

Special Buildings<br />

Strata titles for many buildings<br />

occupied before June 1996 could<br />

not be issued as an application<br />

for strata titles could not be made<br />

as either the buildings have not<br />

been issued with the certificate<br />

<strong>of</strong> fitness for occupation or<br />

the buildings plans are lost or<br />

destroyed.<br />

Any building occupied before<br />

June 1996 is now classified<br />

as a special building under<br />

Act A1290 19 and the amended<br />

provision 20 now allows for an<br />

application to be made to obtain<br />

strata titles for a special building,<br />

without having to satisfy the<br />

Director that the building to be<br />

sub-divided have been certified<br />

by the local authority to be fit<br />

for occupation or use.<br />

<strong>Pro</strong>visional blocks<br />

When a development on the<br />

same lot <strong>of</strong> land, comprising a<br />

number <strong>of</strong> blocks <strong>of</strong> high-rise<br />

buildings, is developed in phases,<br />

after the first block is completed<br />

the developer is required to<br />

apply for the sub-division <strong>of</strong> the<br />

building for issuance <strong>of</strong> strata<br />

title for the completed block.<br />

At the same time the developer<br />

will apply for provisional strata<br />

titles for the uncompleted blocks.<br />

These blocks to be erected or<br />

are uncompleted are known as<br />

provisional blocks.<br />

It is pertinent to note that<br />

under an amended Section 10A <strong>of</strong><br />

Act 318, no land can be included<br />

in the application for the issuance<br />

<strong>of</strong> a provisional strata title for the<br />

provisional block. This means for<br />

a Scheme C development 21 , if the<br />

developer chooses to complete<br />

the two blocks <strong>of</strong> buildings, he<br />

may not apply for provisional<br />

strata titles for the uncompleted<br />

land parcels.<br />

If provisional strata title has<br />

been issued for an uncompleted<br />

block, the original proprietor<br />

<strong>of</strong> the provisional strata title is<br />

required to apply for the issue<br />

<strong>of</strong> separate strata titles to the<br />

parcels in the building as soon<br />

as the building in respect <strong>of</strong> that<br />

title has been completed and<br />

a certificate <strong>of</strong> completion and<br />

compliance has been issued, and<br />

in any event within six months<br />

from the date <strong>of</strong> issue <strong>of</strong> the said<br />

certificate.<br />

Payment <strong>of</strong> quit rent on<br />

a parcel<br />

Quit rent has always been<br />

made payable on the lot <strong>of</strong><br />

land, <strong>of</strong>ten known as the master<br />

title, and legal practitioners <strong>of</strong>ten<br />

face a common problem when<br />

registering a dealing relating to<br />

a strata title.<br />

Under the NLC, any instrument<br />

<strong>of</strong> dealing shall not be registered<br />

if any rent due in respect <strong>of</strong> the<br />

land has not been paid at the<br />

time <strong>of</strong> presentation 22 .<br />

Many developers or proprietors<br />

<strong>of</strong> master titles <strong>of</strong>ten do not pay<br />

the rent due in respect <strong>of</strong> the<br />

land until May <strong>of</strong> each year.<br />

Presentation <strong>of</strong> instrument <strong>of</strong><br />

dealings during the period from<br />

January to May <strong>of</strong> each year, are<br />

hindered by such non-payment<br />

<strong>of</strong> the rent.<br />

Section 43(1) <strong>of</strong> Act 318 has<br />

been amended by Act 1290 by<br />

the deletion <strong>of</strong> paragraph (j) to<br />

17 Part VI.<br />

18 Part VII.<br />

19 S. 4 - definition <strong>of</strong> “special building”.<br />

20 S. 9(1).<br />

21 Illustrated in paragraph 4.03 <strong>of</strong> this paper.<br />

22 S. 301A NLC.<br />

23 S. 67A (1).<br />

24 S. 37(2) has been deleted by Act A1290.<br />

25 S. 45(6)(b).<br />

allow for the payment <strong>of</strong> annual<br />

rent on the parcels and not on<br />

the lot. Correspondingly, Form 4<br />

in the First Schedule <strong>of</strong> Act 318<br />

has been amended to allow for<br />

payment <strong>of</strong> rent on the parcel.<br />

The Strata Titles <strong>Board</strong><br />

Act A1290 has made much<br />

clearer the duties and powers <strong>of</strong><br />

the Strata Titles <strong>Board</strong>.<br />

The <strong>Board</strong> is now established<br />

to hear and determine any<br />

disputes under Act 318, on an<br />

application made by a proprietor<br />

or the management corporation,<br />

or any other person having a<br />

registered interest in a parcel 23 .<br />

Such disputes can relate to byelaws<br />

made by the management<br />

corporation, resolutions passed<br />

by the management corporation,<br />

elections held, interest rate for<br />

late payment <strong>of</strong> contributions to<br />

the management fund, insurance<br />

matters, disputes on costs <strong>of</strong><br />

repairs in a parcel carried out<br />

by the management corporation,<br />

alterations to common property<br />

and other related matters.<br />

Other significant<br />

amendments<br />

Act A1290 has enabled parcel<br />

proprietors who are chargors to<br />

vote in general meetings <strong>of</strong> the<br />

management corporation without<br />

having to obtain an agreement<br />

from the chargee24 .<br />

The management corporation<br />

is now empowered to levy<br />

contributions to the management<br />

fund on the purchasers who<br />

are not yet registered as parcel<br />

proprietors 25 . <strong>BEM</strong>


54 FEATURE<br />

THE INGENIEUR<br />

In the mechanical method,<br />

demolition is usually carried<br />

out piece by piece at a<br />

time using heavy tools such as<br />

diamond saws, oxygen cutters<br />

and hydraulic bursters. The<br />

traditional mechanical method is<br />

already commonplace in <strong>Malaysia</strong><br />

and is therefore not described<br />

further. In the explosive method,<br />

demolition is carried out using<br />

powerful military explosives to<br />

enable the building to be pulled<br />

down in a matter <strong>of</strong> seconds.<br />

This method <strong>of</strong> demolition is<br />

very new in the country. In fact,<br />

there is hardly any building or<br />

structure demolished this way in<br />

this country, despite the fact that<br />

the method has been successfully<br />

used elsewhere since the 1950s,<br />

particularly in North America<br />

and Europe. One <strong>of</strong> the reasons<br />

could be the lack <strong>of</strong> knowledge,<br />

exposure and confidence among<br />

engineers, clients and contractors<br />

with regards to the method.<br />

With many concrete buildings<br />

in <strong>Malaysia</strong> approaching their<br />

designed lives and some <strong>of</strong> which<br />

are high-rise structures, there is<br />

a need to consider the explosive<br />

method should the buildings need<br />

to be demolished. While the legal<br />

aspects <strong>of</strong> an explosive engineer’s<br />

job have been described elsewhere<br />

[1], this article attempts to give an<br />

overview and share with readers<br />

knowledge and experience with<br />

An Overview Of The<br />

Use Of Explosives For<br />

The Demolition Of<br />

Building Structures<br />

By Assoc. <strong>Pro</strong>f Ir. Dr. Arazi Bin Idrus 1 , University Teknologi Petronas, Perak<br />

A building structure is normally designed for a life span <strong>of</strong> about 50 years. However, if<br />

it has sustained severe damage during or after its life span that is beyond economical<br />

repair, the last resort would be to demolish it. The demolition should be done in<br />

a controlled manner, either by the traditional mechanical method or by explosives<br />

means.<br />

respect to the use <strong>of</strong> explosives<br />

for the demolition <strong>of</strong> building<br />

structures.<br />

Explosives And Their<br />

Detonating Effects<br />

An explosive (or ‘explosive<br />

charge’) can be defined as ‘a<br />

material which can decompose<br />

extremely rapidly when correctly<br />

initiated to produce energy (heat)<br />

and expanding gases, which can<br />

perform work on the immediate<br />

surroundings [2]. An explosive is<br />

basically a mixture <strong>of</strong> a fuel and<br />

oxidizer with or without a binder<br />

(stabilizer) material. <strong>Pro</strong>bably<br />

the first explosive, gunpowder,<br />

was used by the Chinese in<br />

700 AD. It was a mixture <strong>of</strong><br />

charcoal (the fuel), sulphur (the<br />

binder/ stabilizer) and potassium<br />

nitrate salt (the oxidizer) [3].<br />

More modern explosives were<br />

developed by the Swedish Nobel<br />

family, notably by Alfred (<strong>of</strong> the<br />

Nobel Prize), who discovered<br />

nitroglycerine (NG) in 1863 and<br />

dynamite in 1866. Trinitrotoluene<br />

(TNT) was discovered at about<br />

the same time, perhaps by the<br />

Germans. Since then, more and<br />

more powerful explosives had<br />

been developed particularly for<br />

military uses, such as cyclonite<br />

(RDX) in 1899, octogen (HMX)<br />

in 1930, ANFO in 1955 and C4<br />

(91% RDX) in the 1960s.<br />

1 BEng (Civil), Msc (Weapons Effects on Structures), PhD (Construction)<br />

Explosives are classified<br />

according to their ease <strong>of</strong> initiation<br />

and speed <strong>of</strong> reaction. They can<br />

be classified either as ‘primary’<br />

or ‘secondary’ (high) explosives.<br />

Primary explosives are those which<br />

can easily be primed or initiated<br />

to either burn or detonate, for<br />

example, lead azide and mercury<br />

fulminate. They are usually used as<br />

detonating devices or “detonators”<br />

to initiate the detonation <strong>of</strong> more<br />

powerful, secondary explosives.<br />

Secondary explosives (e.g. TNT,<br />

RDX, HMX and C4) are more<br />

difficult to explode and so require<br />

initiation from primary explosives.<br />

These explosives detonate to<br />

produce powerful shock waves at<br />

speeds in the order <strong>of</strong> 4000 ms -1<br />

to 9000 ms -1 . They are the types<br />

used as the “main charges” for<br />

demolition works.<br />

The detonating effect <strong>of</strong> an<br />

explosive is largely due to the<br />

very high dynamic over pressure<br />

in the shock front <strong>of</strong> its detonation<br />

wave which passes through the<br />

length <strong>of</strong> the charge and out<br />

into the surrounding medium<br />

[3]. Fig. 1 depicts the detonation<br />

<strong>of</strong> a length <strong>of</strong> explosive charge<br />

in air with the corresponding<br />

pressure pr<strong>of</strong>ile beneath it. The<br />

overpressure produced in the<br />

shock front is in the range <strong>of</strong><br />

150 to 400 kilobar. Behind the<br />

shock front is a very short (1-10<br />

mm) ‘reaction’ zone in which the


THE INGENIEUR FEATURE<br />

55<br />

Expanding Gas<br />

Pressure<br />

(Not to scale)<br />

Gas Front<br />

Reaction<br />

Zone<br />

Shock Front<br />

explosive material decomposes<br />

into gases. The rear <strong>of</strong> this zone<br />

is marked by a negative pressure<br />

because the gases are moving<br />

backwards relative to the forward<br />

movement <strong>of</strong> the shock front.<br />

Behind the reaction zone, the<br />

gases immediately move outwards<br />

(expands) very rapidly applying a<br />

huge force to everything in the<br />

surrounding area.<br />

Th e m a i n p r o b l e m w i t h<br />

explosives is that they can be<br />

sensitive to heat and shock. In<br />

order to ensure stability during<br />

handling and storage, the explosive<br />

material is <strong>of</strong>ten combined with<br />

Unconsumed<br />

explosive<br />

Distance from<br />

Detonator<br />

Fig.1 Section through a Detonating Explosive and Corresponding<br />

Overpressure <strong>Pro</strong>file [3]<br />

a plastic binder material to avoid<br />

initiation under normal handling<br />

and storage conditions. Today’s<br />

secondary high explosives are<br />

usually produced in plastic<br />

rather than in pure form, hence<br />

the name ‘plastic’ or ‘plasticbonded’<br />

explosives. The plastic<br />

binder also makes the explosive<br />

material more malleable i.e. can<br />

be molded into different shapes<br />

so as to change the direction and<br />

focus <strong>of</strong> the explosion. This leads<br />

to the creation <strong>of</strong> ‘shape charges’<br />

commonly used in demolition<br />

works to cut steel or reinforced<br />

concrete members.<br />

2/3 <strong>of</strong><br />

circumference<br />

charged<br />

Point<br />

<strong>of</strong> impact<br />

(a) (b)<br />

Techniques For Explosive<br />

Demolition<br />

There are basically five<br />

techniques for carrying out<br />

explosive demolition <strong>of</strong> buildings<br />

and other similar structures,<br />

namely, ‘telescoping’, ‘toppling’,<br />

‘implosion,’ ‘progressive collapse’<br />

and ‘shattering’.<br />

● Telescoping<br />

Telescoping is the near-vertical<br />

collapse <strong>of</strong> a structure by the<br />

introduction <strong>of</strong> a large stress at<br />

the base so that the upper floors<br />

are broken up by impact with the<br />

ground as the structure descends,<br />

see Fig. 2(a)[5]. The method is<br />

widely used for demolishing tall<br />

shell structures such as cooling<br />

towers and chimneys.<br />

In the demolition <strong>of</strong> cooling<br />

towers, for example, about twothirds<br />

<strong>of</strong> the legs are removed<br />

to create a slight tilting <strong>of</strong> the<br />

structure with the rear legs (or<br />

first floor columns) acting as a<br />

hinge, Fig.2(b). Within a delay<br />

<strong>of</strong> between 75 to 100 ms,<br />

approximately two-thirds <strong>of</strong> the<br />

shell circumferences higher above<br />

the legs are then weakened using<br />

two to three rows <strong>of</strong> explosives<br />

placed at 450mm centre to<br />

centre. Typically a total <strong>of</strong> 60<br />

2/3 <strong>of</strong> legs charged<br />

Fig 2 Telescoping Technique On A Cooling Tower (a) collapse mode (b) charging method


56 FEATURE<br />

THE INGENIEUR<br />

Fig. 3 Toppling Technique<br />

to 80 kg <strong>of</strong> explosive charges is<br />

needed to demolish a structure<br />

like this.<br />

● Toppling<br />

The toppling technique is<br />

applicable for rectangular highrise<br />

structures. In this technique,<br />

toppling is induced by the use<br />

<strong>of</strong> cutting charges placed on the<br />

front legs, see Fig. 3. Once the<br />

front legs are charged, a hinge<br />

is formed at the back to allow<br />

topple to take place. Toppling<br />

requires more space and also<br />

throws more debris than any other<br />

techniques.<br />

● Implosion<br />

Hinge<br />

Implosion (Fig. 4) refers to<br />

the centrally motivated explosive<br />

demolition <strong>of</strong> a structure where<br />

the outer walls are left free <strong>of</strong><br />

explosives and remain intact.<br />

Placing and timing <strong>of</strong> the charges<br />

are arranged in such a way<br />

so that the structure collapses<br />

inwards on itself. This technique<br />

is <strong>of</strong>ten the choice in highly<br />

developed areas where damage to<br />

the surrounding must be greatly<br />

reduced or totally avoided. The<br />

technique requires an estimate,<br />

based on experience, <strong>of</strong> the rate<br />

at which various elements <strong>of</strong> a<br />

structure will fail, collapse and<br />

then fall.<br />

● <strong>Pro</strong>gressive collapse<br />

Shatter<br />

This technique is generally<br />

used for long structures where<br />

ground vibrations are critical.<br />

The collapse is designed so<br />

that relatively small parts <strong>of</strong><br />

the structure hit the ground at<br />

considerable intervals to avoid<br />

a single large impact.<br />

Fig. 4 The Implosion Method Of Explosive Demolition [5]<br />

● Shattering<br />

In this technique, the structure<br />

is simply brought down by drilled<br />

explosives. There is no intention<br />

<strong>of</strong> controlling the collapse, as<br />

this is not important, for example<br />

in demolishing small, isolated<br />

buildings.<br />

Charging The Structure<br />

A n y d e m o l i t i o n , b e i t<br />

mechanical or explosive, is<br />

preceded with the formation<br />

<strong>of</strong> collapse mechanisms i.e.<br />

formation <strong>of</strong> appropriate number<br />

<strong>of</strong> plastic hinges in the structure.<br />

Once the hinges are formed, the<br />

collapsed member must then be<br />

free to fall under its own selfweight.<br />

In an explosive demolition,<br />

formation <strong>of</strong> collapse mechanisms<br />

is achieved by applying explosive<br />

charges at specific locations in<br />

the structural members such as<br />

beams and columns (‘charging the<br />

structure’). For this, the charges<br />

are inserted into pre-drilled<br />

holes in the structural members<br />

as required These charges are<br />

usually contained in cylindrical<br />

aluminium tubes <strong>of</strong> diameter<br />

between 25-50 mm and length<br />

between 100-300 mm (See Fig. 5).<br />

The tube also houses a detonation<br />

mechanism which consists <strong>of</strong><br />

a primary explosive, a booster<br />

explosives and a fuse head. The<br />

fuse head flashes to activate<br />

the primary explosive, which<br />

in turn explodes to activate the<br />

booster charge and subsequently<br />

the main (or secondary high<br />

explosive) charge. The charges<br />

are connected together either<br />

using safety fuse cords or more<br />

<strong>of</strong>ten, using leading copper wires.<br />

In a fuse cord connection, the<br />

end <strong>of</strong> the fuse cord is ignited<br />

to produce a flash that will<br />

activate the primary explosive. In<br />

a leading copper wire connection<br />

(See Fig. 5), an electric current<br />

is passed through a copper wire,<br />

which heats up the fuse head to<br />

initiate the primary explosive.


THE INGENIEUR FEATURE<br />

57<br />

Leading copper<br />

wire<br />

In most demolition work, delay<br />

is usually necessary to produce a<br />

sequence <strong>of</strong> detonation necessary<br />

for the structure to collapse in a<br />

systematic and controlled manner<br />

and achieve the desired collapse<br />

mode.<br />

This delay is provided by<br />

a column <strong>of</strong> a slow burning<br />

element in the tube. The length<br />

<strong>of</strong> this column determines the<br />

length <strong>of</strong> delay required. Once<br />

all the charges are connected,<br />

the structure is ready to be<br />

exploded using a remotelycontrolled<br />

central switch.<br />

Important Considerations<br />

Fuse head<br />

In deciding whether to use<br />

conventional or explosive method<br />

<strong>of</strong> demolition, or even which<br />

particular explosive technique<br />

is appropriate for a given<br />

situation, certain factors have<br />

to be considered. These are as<br />

follows:<br />

■ Type <strong>of</strong> structural construction<br />

If the building is <strong>of</strong> panel<br />

construction, more charges would<br />

be required to weaken the<br />

structure. There would be a large<br />

number <strong>of</strong> holes to drill and also<br />

more extensive detonation cords<br />

to use. This can have a negative<br />

impact on the demolition cost.<br />

In fact, for panel buildings with<br />

walls less than 150mm thick, the<br />

explosive technique is usually not<br />

economic [4].<br />

■ Local geography<br />

I n h i g h l y d e v e l o p e d o r<br />

urban areas, the building to be<br />

Primary Explosive<br />

Fig. 5 Electric Detonator-Main Charge arrangement<br />

Booster<br />

Explosive<br />

demolished tends to be in close<br />

proximity, or even adjoining,<br />

other buildings. Any explosive<br />

technique used in the demolition<br />

work must aim to avoid direct<br />

impact on the annexed or<br />

surrounding buildings.<br />

■ Building geometry<br />

The geometry <strong>of</strong> the building<br />

to be demolished can also be<br />

an important consideration.<br />

For example in the toppling<br />

technique, the building must<br />

have a certain minimum heightto-width<br />

ratio to initiate the<br />

toppling effect. Besides, the<br />

hinge or pivot point for the<br />

toppling must also lie behind the<br />

centre <strong>of</strong> gravity <strong>of</strong> the structure<br />

so that it would fall towards the<br />

front.<br />

■ Availability <strong>of</strong><br />

design information<br />

As demolition works are<br />

normally carried out on old<br />

buildings, drawings and other<br />

design information may no<br />

longer be available. As a result,<br />

extensive structural assessment<br />

on the building may therefore<br />

be required to determine the<br />

r e i n f o r c e m e n t d e s i g n a n d<br />

existing material properties.<br />

This necessitates extra work<br />

and additional costs. Besides,<br />

even if drawings are available,<br />

designers naturally would tend<br />

to design with high factors <strong>of</strong><br />

safety. Consequently, there is a<br />

possibility that calculated charge<br />

weights and proposed layout for<br />

the demolition work may be<br />

inadequate.<br />

Massive charge<br />

(secondary high explosive)<br />

■ Cost<br />

For building demolition, charge<br />

weights may range between 5 kg<br />

to 100 kg, depending on how<br />

massive the structure is. With<br />

an explosive material cost <strong>of</strong><br />

perhaps less than a few hundred<br />

ringgits per kg, the bulk <strong>of</strong> the<br />

demolition cost does not come<br />

from the charge material itself.<br />

Rather, from the cost <strong>of</strong> the<br />

installation and operation work<br />

involved such as drilling and<br />

preparing the holes, providing<br />

the specialized workers and<br />

equipment, the ‘accessories’<br />

required, insurances and the<br />

necessary mitigation measures<br />

taken before the demolition work<br />

begins.<br />

■ Undesirable effects <strong>of</strong><br />

ground vibration<br />

Ground vibration as a result<br />

<strong>of</strong> the structure impacting on<br />

the ground can cause damage<br />

to nearby buildings or buried<br />

structures. The effect may be<br />

evaluated empirically by finding<br />

the Root Mean Square <strong>of</strong> the<br />

Peak Particle Velocity (RMS PPV)<br />

<strong>of</strong> the soil below the structure<br />

[4]. In order to limit the effects<br />

<strong>of</strong> the ground vibration, RMS<br />

PPV for buried and above ground<br />

structure should not exceed 5<br />

mm/s and 50 mm/s respectively.<br />

Consideration must also be given<br />

to extend this limit by taking<br />

certain mitigation measures, such<br />

as cushioning the impact with<br />

a loose blanket <strong>of</strong> fill around<br />

the building to be demolished,<br />

or cutting trenches around the<br />

buildings to be protected.


58 FEATURE<br />

THE INGENIEUR<br />

■ Undesirable effects <strong>of</strong> air blast<br />

and flying debris<br />

The demolition technique<br />

used must ensure that effects<br />

from air blast and flying debris<br />

are within control. Appropriate<br />

mitigation measures must be<br />

taken to reduce these effects<br />

such as by wrapping the columns<br />

and beams in the building to<br />

be demolished with iron sheets<br />

and screening the surrounding<br />

buildings using tarpaulins or<br />

plywood.<br />

Conclusion<br />

The explosive method <strong>of</strong><br />

demolition can provide a very<br />

fast and efficient means <strong>of</strong><br />

demolishing high-rise building<br />

structures. Besides, it also<br />

ensures safety to all personnel<br />

involved, as the demolition<br />

operation is remotely done and<br />

controlled. Several techniques<br />

for the explosive demolition<br />

<strong>of</strong> the buildings have been<br />

Subscription Form<br />

The Ingenieur is the <strong>of</strong>ficial publication <strong>of</strong> the <strong>Board</strong> <strong>of</strong> <strong>Engineers</strong> <strong>Malaysia</strong>. The journal provides useful and quality<br />

information on policy update, accreditation <strong>of</strong> local and foreign universities, training and courses, safety and health,<br />

business opportunities and others within the engineering arena. It is published four (4) times a year. To subscribe, please<br />

complete the following details:<br />

BLOCK CAPITALS PLEASE<br />

Name:<br />

Address:<br />

described and discussed. These<br />

a r e t e l e s c o p i n g , t o p p l i n g ,<br />

implosion, progressive collapse<br />

and shattering. The choice<br />

depends on a number <strong>of</strong> factors<br />

such as type <strong>of</strong> structural<br />

construction, building geometry<br />

and local geography. However,<br />

b e f o r e e m b a r k i n g o n a n y<br />

explosive technique as an<br />

REFERENCES<br />

Postcode: Country:<br />

Tel: Fax: E-mail:<br />

Enclosed is a postal order/cheque No.<br />

payable to Lembaga Jurutera <strong>Malaysia</strong>. Please fax/mail this<br />

form to:<br />

Lembaga Jurutera <strong>Malaysia</strong>,<br />

Tingkat 17, Ibu Pejabat JKR, Kompleks Kerja Raya <strong>Malaysia</strong>,<br />

Jalan Sultan Salahuddin, 50580 Kuala Lumpur<br />

Tel: 03-2698 0590 Fax: 03-2692 5017<br />

Yes! I would like to subscribe The Ingenieur for:<br />

1 year <strong>of</strong> 4 issues RM30.00<br />

2 year <strong>of</strong> 8 issues RM60.00<br />

3 year <strong>of</strong> 12 issues RM90.00<br />

Others (Please specify)<br />

(Please tick the appropriate circle)<br />

alternative to conventional<br />

demolition, an assessment must<br />

also be made on whether the<br />

large savings in time outweigh<br />

the higher installation and<br />

equipment costs, the extensive<br />

planning work needed as well<br />

as the necessary measures taken<br />

to mitigate the undesirable<br />

effects <strong>of</strong> the operation. <strong>BEM</strong><br />

[1] Sahari, L.K. Blasters and Explosive <strong>Engineers</strong>: The Job and<br />

The <strong>Malaysia</strong>n Law. Buletin Jurutera, October 2006.<br />

[2] BS 6187:2000: Code <strong>of</strong> Practice for Demolition<br />

[3] Walter, K. Introduction to Explosives. Lecture Notes, MSc<br />

Weapons Effects on Structures, Royal Military College <strong>of</strong><br />

Science, Cranfield University UK, WES No. 7, 1993<br />

[4] Mays G.C. Damage Assessment, Repair and Demolition.<br />

Lecture Notes, MSc Weapons Effects on Structures, Royal<br />

Military College <strong>of</strong> Science, Cranfield University UK,<br />

WES No. 7, 1993<br />

[5] http://www.implosionworld.com


60 FEATURE<br />

THE INGENIEUR<br />

Disabled People As<br />

Stakeholders In A Barrier-<br />

Free Built Environment<br />

By Naziaty Mohd Yaacob, Department <strong>of</strong> Architecture, Faculty <strong>of</strong> the Built Environment, University<br />

<strong>of</strong> Malaya and Nor Rasidah Hashim, Department <strong>of</strong> Environmental Sciences, Faculty <strong>of</strong> Environmental<br />

Studies, Universiti Putra <strong>Malaysia</strong><br />

This paper describes the vital roles that disabled people should play as significant<br />

stakeholders in the development process <strong>of</strong> a barrier-free built environment. Their roles<br />

are conducting Disability Awareness Training; conducting Access Survey and Access Audits;<br />

and being Technical Advisors on matters pertaining to accessibility, inclusive policies and<br />

universal design to local authorities and the private sector. In order to realize these roles,<br />

disabled people need to empower themselves by disability advocacy work for a barrierfree<br />

built environment.<br />

In <strong>Malaysia</strong>, the participation <strong>of</strong><br />

disabled people as a significant<br />

stakeholders in the built<br />

environment’s construction and<br />

development process was started<br />

by an international disability<br />

awareness in the last decade.<br />

Firstly, the Asian and Pacific<br />

Decade <strong>of</strong> Disabled Persons 1993-<br />

2002 provided the framework <strong>of</strong><br />

action for countries in the region<br />

aiming for equal opportunities for<br />

disabled people, enabling them to<br />

participate in society’s mainstream<br />

development. In 2007, further<br />

disability awareness resulted in<br />

the Biwako Plus Five 1 , which saw<br />

<strong>Malaysia</strong> as one <strong>of</strong> the signatories<br />

to an action plan to promote<br />

disability-inclusive development<br />

(UNESCAP, 2007).<br />

One <strong>of</strong> the priority areas under<br />

the Biwako Millenium Framework<br />

(BMF) for Action is “Access to<br />

built environments and public<br />

transport” (UNESCAP, 2007).<br />

Under this section in the BMF,<br />

the Government would need to<br />

do the following:<br />

(a) Take appropriate measures to<br />

enforce accessibility standards<br />

effectively and to promote<br />

accessibility in both existing<br />

and newly built environments<br />

and public transport;<br />

(b) <strong>Pro</strong>mote the concept <strong>of</strong><br />

universal design among public<br />

and private entities, with a<br />

view to benefit persons with<br />

different disabilities;<br />

(c) Ensure, in collaboration with<br />

other stakeholders, that all<br />

services which are open to or<br />

provided for the public take<br />

into account all aspects <strong>of</strong><br />

accessibility for persons with<br />

disabilities;<br />

(d) Encourage and promote<br />

the research into and the<br />

development <strong>of</strong> good quality<br />

mobility aids and devices<br />

a t a f f o r d a b l e p r i c e s i n<br />

order to enable access by<br />

persons with disabilities to<br />

built environments, public<br />

transport, information and<br />

communications, and other<br />

services;<br />

(e) Take appropriate measures to<br />

promote accessible tourism.<br />

All the points in italics above<br />

can be addressed in the three<br />

different roles that disabled<br />

people should participate in,<br />

which are: (i) conduct Disability<br />

Awareness Training; (ii) conduct<br />

access survey and access audits;<br />

and (iii) be technical advisors on<br />

matters pertaining to accessibility,<br />

inclusive policies and universal<br />

design to local authorities and<br />

the private sector.<br />

Furthermore, the <strong>Malaysia</strong>n<br />

Parliament recently passed the<br />

Persons with Disabilities Bill<br />

2007 (PWD Bill 2007) and the<br />

Act resulting from this Bill can<br />

provide greater opportunities for<br />

disabled people to participate in<br />

the development process <strong>of</strong> a<br />

barrier-free built environment. The<br />

Persons with Disabilities Act 2007<br />

(PWD Act 2007) would create<br />

a framework for action at the<br />

national level that would reinforce<br />

the various roles for advocacy.<br />

This shows the commitment <strong>of</strong><br />

the <strong>Malaysia</strong>n Government as<br />

a major stakeholder to ensure<br />

that disabled people have equal<br />

participation in the nation’s<br />

development.<br />

1 The Biwako Millennium Framework (BMF) provides a framework for action<br />

to further the goals <strong>of</strong> an inclusive, barrier-free and rights-based society for<br />

persons with disabilities in Asia and the Pacific. BMF contains seven priority<br />

areas for action and four strategic actions that Governments, in co-operation<br />

with civil society, are urged to pursue to further achieve the goals and<br />

commitments <strong>of</strong> BMF in the period 2003-2012. See http://www.worldenable.<br />

net/bmf5/bmf5adopted.htm.


THE INGENIEUR FEATURE 61<br />

Nevertheless, there are still<br />

unresolved issues that should<br />

prompt disabled people to carry<br />

out advocacy work. At the<br />

moment there are no strict<br />

implementation and enforcement<br />

<strong>of</strong> By-law 34A <strong>of</strong> the Uniform<br />

Building By-laws which requires<br />

all buildings to have access<br />

for disabled people. The use<br />

<strong>of</strong> <strong>Malaysia</strong>n Standards 1184<br />

and 1183 2 has not been fully<br />

addressed, although it has been<br />

incorporated under the building<br />

by-law (Arikisamy, 2007) 3 . For<br />

example, many light rail transit<br />

(LRT) stations in Kuala Lumpur<br />

are not accessible (Arikisamy,<br />

2007), such as the Monorail line<br />

and the former STAR line, which<br />

seriously excludes low-income<br />

disabled people from gaining<br />

better employment prospects.<br />

Furthermore, existing buildings<br />

built before 1991, should be<br />

surveyed and audited, and be<br />

upgraded to comply with the<br />

Building Regulations. Another<br />

aspect that is lacking is the street<br />

environment as the <strong>Malaysia</strong>n<br />

Standard 1331: Access <strong>of</strong> Disabled<br />

Persons Outside Buildings (2003)<br />

has yet to be incorporated in<br />

any <strong>of</strong> the legislation (Yaacob,<br />

2007). 4<br />

Government buildings that<br />

do not have to comply with the<br />

codes <strong>of</strong> practice and fall under<br />

the responsibility <strong>of</strong> the Public<br />

Works Department should also<br />

be made accessible, safe and<br />

usable for disabled people.<br />

T h i s c o m p l i c a t e d<br />

implementation process has<br />

left disabled people with no<br />

choice but to be involved in the<br />

building and construction process<br />

<strong>of</strong> the nation.<br />

Advocating A Barrier-Free<br />

Built Environment<br />

Th e r e a r e t h r e e m a j o r<br />

stakeholders in a Barrier-Free<br />

Built Environment: disabled<br />

people, the Government, and the<br />

private sector. In this country,<br />

therefore, disabled people need<br />

Figure 1: This cartoon illustrates the expectations <strong>of</strong> disabled people not<br />

being met by the authorities who assume that they have implemented<br />

the policies and building regulation to satisfaction as there is no<br />

complaint.<br />

to take the lead in promoting a<br />

barrier-free built environment.<br />

The full engagement <strong>of</strong> disabled<br />

people in a barrier-free built<br />

environment development process<br />

means disabled people are able<br />

to articulate their concerns such<br />

as the ability to conduct access<br />

surveys; write access audits to<br />

present findings and solutions;<br />

and that the society wholeheartedly<br />

adopts the concepts<br />

<strong>of</strong> barrier-free environment and<br />

universal design as what has<br />

happened in many developed<br />

countries.<br />

Disabled people need to<br />

advocate many ways to achieve<br />

equal participation within society<br />

and to achieve a barrier-free<br />

environment. Understanding<br />

physical barriers and suggesting<br />

what to do to overcome the<br />

barriers are essential skills to<br />

advocacy. However, it is a teameffort<br />

that requires updating<br />

knowledge in many areas, such<br />

as building, architecture, street<br />

environment, landscaping, urban<br />

design and town planning.<br />

Assuming the role <strong>of</strong> a resource<br />

person would make a lot <strong>of</strong><br />

difference by giving input in the<br />

process <strong>of</strong> development.<br />

In many instances, a lack <strong>of</strong><br />

understanding about the need to<br />

fulfill certain requirements is one<br />

<strong>of</strong> the problems <strong>of</strong> implementation<br />

<strong>of</strong> a barrier-free environment<br />

apart from misinterpretation<br />

<strong>of</strong> the standards and codes<br />

<strong>of</strong> development practice. In<br />

order to fulfill one <strong>of</strong> BMF’s<br />

objectives which is to ‘enforce<br />

accessibility standards effectively<br />

and to promote accessibility<br />

2 MS 1184: 2002 Code <strong>of</strong> Practice on Access for Disabled Persons to Public<br />

Buildings; MS 1183: Part 8: 1990: Specifications for Fire Precautions in the<br />

Design and Construction <strong>of</strong> Buildings Part 8: Code <strong>of</strong> Practice for Means <strong>of</strong><br />

Escape for Disabled People.<br />

3 Arikisamy, A., 2007, Country Paper on <strong>Malaysia</strong> reported to UNESCAP,<br />

Accessed on 23 rd December 2007 (http://www.worldenable.net/cdpf2006/<br />

papermalaysia.htm)<br />

4 Yaacob, N.M. 2007. The Social Model versus the Medical Model <strong>of</strong> Disability:<br />

UK and <strong>Malaysia</strong>n Perceptions. Forum on Public Transport for Disadvantaged<br />

Groups. May 2007 at the Caring Society Complex, Penang. (unpublished<br />

paper)


62 FEATURE<br />

THE INGENIEUR<br />

in both existing and newly<br />

built environments and public<br />

transport’, disabled persons need<br />

to acquire technical knowledge<br />

to practice the use <strong>of</strong> access<br />

survey and audits.<br />

Disability Awareness<br />

Training<br />

Effective advocacy requires<br />

training. Firstly, disabled people<br />

need to educate themselves<br />

about issues concerning the<br />

built environment and various<br />

modes <strong>of</strong> transport. They need<br />

to understand how different<br />

s t a k e h o l d e r s wo r k a n d b e<br />

able to differentiate between<br />

strategies, policies, regulations<br />

and implementation. These skills<br />

will ensure that their concerns<br />

will be well articulated.<br />

Secondly, disabled people must<br />

be trainers and resource persons.<br />

With their new found skills, they<br />

could be partners to the building<br />

and construction process by<br />

providing training for technical<br />

personnel in local authorities,<br />

university administrators and the<br />

private sectors (UNESCAP, 2001). 5<br />

To date, disabled people had<br />

conducted Disability Awareness<br />

Training (DAT) training with<br />

Universiti Sains <strong>Malaysia</strong> (USM),<br />

Universiti Malaya (UM), Majlis<br />

Perbandaran Pulau Pinang (MPPP)<br />

and Majlis Bandaran Petaling<br />

Jaya (MBPJ) from the year 2000<br />

until 2002. In <strong>Malaysia</strong>, disabled<br />

people had been involved in<br />

DAT programmes and recently<br />

the BEAT group (Barrier-free<br />

Environment and Accessible<br />

Transport Group) were involved<br />

with the private sector training<br />

employees <strong>of</strong> Air Asia 6 . The<br />

method that BEAT employs is<br />

called Disability Equality Training<br />

which does not use Simulation<br />

Exercises but is similar in many<br />

ways to DAT.<br />

Participants in a DAT will be<br />

given exercises in:<br />

(i) Understanding Barriers<br />

(ii) Simulation Exercises on<br />

experiencing difficulties that<br />

disabled people undergo<br />

(iii) Understanding Dimensions<br />

(iv) Conducting Access Surveys;<br />

and<br />

(v) Writing Access Audit<br />

Reports<br />

The content <strong>of</strong> the DAT will<br />

vary according to the needs<br />

and purpose <strong>of</strong> the group <strong>of</strong><br />

participants but in essence<br />

would provide the necessary<br />

skills for action.<br />

The Use <strong>of</strong> Access Survey and<br />

Audits in the Development<br />

<strong>Pro</strong>cess<br />

Thirdly, disabled people can<br />

act as volunteers or consultants<br />

in Access Survey and Access<br />

Audit. We have come across<br />

<strong>of</strong>ficers in local Government<br />

that expressed the lack <strong>of</strong><br />

feedback from disabled people<br />

on accessibility issues (see<br />

Figure 1). This is due to the<br />

fact that disabled people do<br />

not have adequate knowledge<br />

and language <strong>of</strong> the built<br />

environment to enable them to<br />

communicate with architects and<br />

contractors.<br />

A p a r t f r o m t e c h n i c a l<br />

knowledge that deepens with<br />

practice, advocacy work will<br />

not be successful without<br />

understanding how different<br />

stakeholders, building regulations<br />

and pr<strong>of</strong>essionals work. In<br />

particular it is important to<br />

identify which Government<br />

department is responsible to<br />

what area or sectors and who<br />

are the decision-makers in<br />

policy-making, guidelines and<br />

implementation. Hence, strategic<br />

knowledge is vital in advocacy<br />

(see Figure 2). Disabled people<br />

need to be prepared when<br />

<strong>Malaysia</strong> has laws in place and<br />

with the technical and strategic<br />

knowledge, disabled people<br />

Figure 2: The lack <strong>of</strong> integration and implementation <strong>of</strong> the Building<br />

Regulation relating to access for disabled people has led to a situation<br />

that disabled people need to address themselves. The figure shows the<br />

many variants <strong>of</strong> implementation or lack <strong>of</strong> it in access to the built<br />

environment and public transport in <strong>Malaysia</strong>.<br />

5 UNESCAP, 2001, Pathfinders: Towards Full Participation and Equality <strong>of</strong><br />

Persons with Disabilities in the ESCAP Region, Social Policy Paper No. 2,<br />

2001, ST/ESCAP/2170


THE INGENIEUR FEATURE<br />

63<br />

Plate 1: Disabled people involved with an Access Survey and Consultation<br />

exercise with the Technical Committee <strong>of</strong> the Petaling Jaya Municipal<br />

Council (MBPJ) in May 2007. They recommended what needed to<br />

be done for a stretch <strong>of</strong> pavement and crossings in front <strong>of</strong> MBPJ’s<br />

headquarters building in Section 52, Petaling Jaya. (Photo Credit: Nor<br />

Rasidah Hashim)<br />

can be ready to do access<br />

surveys and access audits, and<br />

also train Government <strong>of</strong>ficers,<br />

businesses and service providers<br />

on disability awareness.<br />

Local authorities usually<br />

have different departments to<br />

supervise different components<br />

<strong>of</strong> the Built Environment (see<br />

Figure 2). Awareness training for<br />

local authority <strong>of</strong>ficers should<br />

be conducted as and when<br />

it is needed. It is the role <strong>of</strong><br />

disabled people to continuously<br />

communicate with the <strong>of</strong>ficers on<br />

issues in the built environment<br />

that needs to be rectified.<br />

Access surveys and audits are<br />

implemented in several stages,<br />

as follows:<br />

● Presenting general findings<br />

At this stage, disabled people<br />

need to know who requested for<br />

the Access Audit to be done. The<br />

survey and audit done will be a<br />

preliminary one without costs <strong>of</strong><br />

the specifications, and would be<br />

informative enough to provide<br />

the management with ideas on<br />

how to solve the problems. This<br />

will enable a good discussion<br />

at the preliminary stages.<br />

● Design and management<br />

When the Access Audit has<br />

been presented, disabled people<br />

need to do a follow-up and<br />

stress on their availability to<br />

discuss with the management<br />

on barrier-free issues generally<br />

and the audited building in<br />

particular. The meeting with<br />

the management or even the<br />

designers if invited to consultant<br />

meetings would reveal to what<br />

extent the management is<br />

considering incorporating the<br />

audit suggestions.<br />

● Access Audits complete with<br />

costs<br />

T h e i n p u t f r o m t h e<br />

management and designers<br />

wo u l d a l l ow r e f i n i n g a n d<br />

completion <strong>of</strong> the preliminary<br />

access audit with the addition<br />

<strong>of</strong> costs. The specifications in<br />

the audits should be as detailed<br />

as possible, and be advised<br />

by suppliers and even quantity<br />

surveyors if necessary.<br />

● Budgeting and upgrading<br />

work<br />

This stage is almost the<br />

same as the stage before,<br />

but in certain cases disabled<br />

people might have to advise<br />

certain owners and service<br />

providers on the budgeting<br />

and upgrading work with<br />

the help <strong>of</strong> pr<strong>of</strong>essionals and<br />

contractors. This is certainly<br />

not applicable to businesses<br />

but may be applicable to non-<br />

Governmental organisations and/<br />

or owners that cannot afford<br />

consultants.<br />

Disabled People as<br />

Resource Persons and<br />

Technical Advisors<br />

A f t e r e x p e r i e n c i n g t h e<br />

Disability Awareness Training and<br />

other technical training, disabled<br />

people will have sufficient skills<br />

in being Technical Advisors on<br />

matters pertaining to accessibility,<br />

inclusive policies and universal<br />

design to local authorities and<br />

the private sector. This had been<br />

proven with the incorporation<br />

<strong>of</strong> the Technical Committee on<br />

Accessibility by the Petaling Jaya<br />

City Council (MBPJ). In this<br />

case, disabled people involved<br />

in this committee meet once<br />

a month and recommend what<br />

needs to be done (see Plate 1).<br />

Conclusions<br />

With the adoption <strong>of</strong> the Biwako<br />

Plus Five action plan and the<br />

enactment <strong>of</strong> the Persons with<br />

Disability Act 2007, disabled<br />

people in this country are<br />

given the boost to advocate a<br />

barrier-free built environment.<br />

Although there are still gaps<br />

in the country’s policies and<br />

regulations to attain a truly<br />

barrier-free built environment,<br />

disabled people should participate<br />

by volunteering in access audits<br />

and surveys. It is vital to know<br />

the right tools and the right<br />

knowledge to make changes<br />

in society. <strong>BEM</strong>


64 ENGINEERING NOSTALGIA<br />

THE INGENIEUR<br />

Kuala Lumpur – Major Flood In<br />

January 1971<br />

Bangunan Sultan Abdul Samad<br />

Bank Negara, Benteng<br />

Jalan Tunku Abdul Rahman<br />

Submitted by: Nasrul Hadi and Ir. Ishak Abdul Rahman

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!