REC- 1-51.p65 - Rural Electrification Corporation Ltd.
REC- 1-51.p65 - Rural Electrification Corporation Ltd.
REC- 1-51.p65 - Rural Electrification Corporation Ltd.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
22<br />
crore and Fixed Assets of Rs.89.91 crore (including Capital<br />
Work in Progress), Investments of Rs.909.86 crore,<br />
Deferred Tax Asset of Rs.7.37 crore and balance of Rs.(-)<br />
431.19 crore in Net Current Assets.<br />
During the year 2009-10 an amount of Rs.3068.39 lacs was<br />
written back to income as provision for Bad & Doubtful<br />
Debts made in earlier years, which were no longer required<br />
due to realisation / upgradation of Loan Assets.<br />
6. DI<strong>REC</strong>TORS’ RESPONSIBILITY STATEMENT<br />
With reference to Section 217 (2AA) of the Companies<br />
Act,1956, it is confirmed as under : –<br />
(i) that in the preparation of the Yearly Accounts for the<br />
period ended 31.03.2010, the applicable Accounting<br />
Standards had been followed and no material departures<br />
have been made from the same;<br />
(ii) that such accounting policies have been selected and<br />
applied consistently and judgements and estimates made<br />
that are reasonable and prudent so as to give a true and<br />
fair view of the state of affairs of the Company at the end<br />
of the financial year and of the profit of the Company for<br />
that period;<br />
(iii) that proper and sufficient care is taken for the maintenance<br />
of adequate accounting records in accordance with the<br />
provisions of the Companies Act, 1956, for safeguarding<br />
the assets of the Company and for preventing and detecting<br />
fraud and other irregularities;<br />
(iv) that the annual accounts have been prepared on a going<br />
concern basis.<br />
7. FINANCING ACTIVITIES<br />
<strong>REC</strong> has been funding power generation, transmission &<br />
distribution projects besides electrification of villages.<br />
Various initiatives in this regard are enumerated below:<br />
7.1 Generation<br />
During the year 2009-10, the Company sanctioned 26 nos.<br />
of generation / R&M loans including 5 nos. additional loan<br />
assistance with total financial outlay of Rs.24031.32 crore,<br />
Since 2002-03 and upto 31.03.2010, <strong>REC</strong> has sanctioned<br />
financial assistance of Rs.103804 crore for R&M, thermal,<br />
wind and hydro generation projects. <strong>REC</strong> has disbursed<br />
Rs.8349 crore during 2009-10 against the on-going<br />
generation projects.<br />
The sector wise break up of loans sanctioned including<br />
additional loan assistance is as below:<br />
No. of Loans Loan Amount<br />
(Rs. in crore)<br />
STATE SECTOR<br />
Fresh Loan 9 12282.37<br />
Additional Loan 4<br />
PRIVATE SECTOR<br />
Fresh Loan 12 11749.95<br />
Additional loan 1<br />
Total : Fresh Loan+Additional Loan 21+5=26 24031.32<br />
41st ANNUAL REPORT 2009-10<br />
7.2 Transmission & Distribution<br />
<strong>REC</strong> continued to play an active role in creating new<br />
infrastructure and improving the existing ones under the<br />
transmission and distribution network in the country<br />
under its T&D portfolio. In line with the country’s objective<br />
to provide power for all by the year 2012 and also reduce<br />
the AT&C losses, <strong>REC</strong> has been financing schemes for<br />
expansion and strengthening of the transmission network<br />
and more importantly, modernizing of the distribution<br />
system.<br />
7.3 System Improvement & Bulk Loan<br />
During the year 2009-10, a total of 289 system<br />
improvement schemes and bulk loan schemes were<br />
sanctioned involving a loan outlay of Rs.15421.64 crore.<br />
This included: (i) 30 schemes involving a loan assistance<br />
of Rs. 1177.75 crore for financing investment in the<br />
distribution system by way of installation of essential<br />
equipments like transformers, meters, capacitors etc. (ii)<br />
29 schemes involving a loan assistance of Rs.1705.48 crore<br />
for conversion of Low Voltage Distribution to High Voltage<br />
Distribution System (HVDS), (iii) 122 schemes for<br />
Rs.3466.33 crore for improving the distribution system,<br />
and (iv) 108 schemes for Rs.9072.07 crore for improving<br />
the transmission network.<br />
7.4 Pumpset energization<br />
During the year, 240020 electric irrigation pumpsets were<br />
reported energized under <strong>REC</strong> financed schemes. 103 new<br />
schemes for a loan assistance of Rs.964.74 crore were<br />
sanctioned during the year under this category. The statewise<br />
details and cumulative position up to 31.3.2010 are<br />
given in the enclosed Table-5<br />
7.5 Activities in North Eastern (NE) States<br />
A loan assistance of Rs.30.83 crore was disbursed to the<br />
NE states under T&D programme during the year 2009-10<br />
as compared to Rs.25 crore during the previous year. 1<br />
scheme for a loan assistance of Rs.32.54 crore was<br />
sanctioned to Nagaland during 2009-10 under System<br />
Improvement category.<br />
8. RAJIV GANDHI GRAMEEN VIDYUTIKARAN YOJANA<br />
(RGGVY)<br />
Government of India, in April 2005, launched the scheme<br />
‘Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)–<br />
Scheme of <strong>Rural</strong> Electricity Infrastructure and Household<br />
<strong>Electrification</strong>’ for the attainment of the National Common<br />
Minimum Programme (NCMP) goal of providing access<br />
to electricity to all households in 5 years. The scheme is<br />
being implemented through <strong>REC</strong>. Under the scheme 90%<br />
capital subsidy is being provided by Govt. of India for<br />
overall cost of the projects.<br />
8.1 <strong>Electrification</strong> of villages and BPL Households<br />
Initial approval was for implementation of Phase I of the<br />
scheme for capital subsidy of Rs.5000 crore during X-Plan<br />
period. 235 projects covering 180699 villages (68763 unelectrified<br />
and 111936 electrified villages) with the total<br />
sanctioned project cost of Rs. 9733 crore were sanctioned<br />
for implementation by the Ministry of Power in X-Plan<br />
period.