Table 2 CPT Zons® AQUAstar® System - Biological Process Design and Settings<br />

CPT Zons® AQUAstar® 2 to 6 PE Unit<br />

2 PE system 4 PE system 6 PE system<br />

Design PE 2 PE 4 PE 6 PE<br />

Tank size<br />

Total treatment capacity 4.10 m 3<br />

Storage in event <strong>of</strong> failure, including buffer<br />

storage (assuming tank full at time <strong>of</strong><br />

1.58 m<br />

failure)<br />

3<br />

Primary treatment chamber volume 1.35m 3<br />

5.45m 3 (1200 gallon)<br />

4.10 m 3<br />

1.62 m 3<br />

1.38m 3<br />

Certificate No. 08/0318 / CPT Zons® AQUAstar®<br />

4.10 m 3<br />

0.38 m 3<br />

2.06m 3<br />

Primary treatment chamber water level 0.98m 1.0m 1.51m<br />

Primary treatment chamber surface area 1.37m 2<br />

Activation chamber volume 1.28m 3<br />

1.37m 2<br />

1.32m 3<br />

1.37m 2<br />

1.98m 3<br />

Activation chamber water level 1.0m 1.03m 1.55m<br />

Activation chamber surface area 1.28m 2<br />

1.28m 2<br />

1.28m 2<br />

Designed flow rate 0.36 m 3 /day 0.72 m 3 /day 1.08 m 3 /day<br />

Designed BOD load 0.12 kg BOD5/day 0.24 kg BOD5/day 0.36 kg BOD5/day<br />

Aeration on / Aeration <strong>of</strong>f 3min. / 15min. 4min. / 15min. 6min. / 15min.<br />

Save Mode<br />

Aeration on / Aeration <strong>of</strong>f<br />

1min. / 15min. 2min. / 15min. 2min. / 15min.<br />

Tank de-sludging period Annual or as specified by service technician<br />

Energy consumption* 1.16 kWh/day 1.45 kWh/day 1.94 kWh/day<br />

CPT Zons® AQUAstar® 6 to 10 PE unit<br />

6 PE system 8 PE system 10 PE system<br />

Max designed population 6 PE 8 PE 10 PE<br />

Tank size<br />

Total treatment capacity 6.460 m 3<br />

Storage in event <strong>of</strong> failure including buffer<br />

storage (assuming tank full at time <strong>of</strong><br />

2.91 m<br />

failure)<br />

3<br />

Primary treatment chamber volume 1.89m 3<br />

6.82m 3 (1500 gallon)<br />

6.460 m 3<br />

1.72 m 3<br />

2.53m 3<br />

6.460 m 3<br />

0.54 m 3<br />

3.16m 3<br />

Primary treatment chamber water level 1.09m 1.45m 1.82m<br />

Primary treatment chamber surface area 1.74m 2<br />

Activation chamber volume 1.98m 3<br />

1.74m 2<br />

2.64m 3<br />

1.74m 2<br />

3.30m 3<br />

Activation chamber water level 1.11m 1.47m 1.84m<br />

Activation chamber surface area 1.79m 2<br />

<strong>For</strong> <strong>inspection</strong> <strong>purposes</strong> <strong>only</strong>.<br />

<strong>Consent</strong> <strong>of</strong> <strong>copyright</strong> <strong>owner</strong> <strong>required</strong> for any other use.<br />

1.79m 2<br />

1.79m 2<br />

Designed flow rate 1080 litres/day 1440 litres/day 1800 litres/day<br />

Designed BOD load 0.36 kg BOD5/day 0.48 kg BOD5/day 0.60 kg BOD5/day<br />

Aeration on / Aeration <strong>of</strong>f 6min. / 15min. 7min. / 15min. 8min. / 15min.<br />

Save Mode<br />

Aeration on / Aeration <strong>of</strong>f<br />

2min. / 15min. 3min. / 15min. 3min. / 15min.<br />

Tank de-sludging period Annual or as specified by service technician<br />

Energy consumption* 1.94 kWh/day 2.16 kWh/day 2.36 kWh/day<br />

Note 1: System settings have been derived from Prüfinstitut für Abwassertechnik-RWTH Aachen Final Test Report for RHEBAU Zons Aquastar SBR<br />

System September 2004. Testing <strong>of</strong> the RHEBAU Zons Aquastar SBR System was carried out in accordance with EN 12566-3. The design is based on<br />

DIN 4261-2: 1984 Small sewage treatment plants; plants with sewage aeration; application, design, construction and testing, using the influent loadings<br />

stated above.<br />

Note 2: ‘PE’ refers to the population equivalent.<br />

Note 3: The system settings are initially configured for the design PE, and should subsequently be adjusted, during servicing, to accommodate the actual<br />

hydraulic and biological loading on the system.<br />