28.01.2013 Views

For inspection purposes only. Consent of copyright owner required ...

For inspection purposes only. Consent of copyright owner required ...

For inspection purposes only. Consent of copyright owner required ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Operator Control<br />

Daily control<br />

Carlow Precast Tanks<br />

Domestic Waste Water Treatment Plant<br />

Notes:<br />

• The AQUAstar tank is designed for maximum 1.0m overburden. Higher level <strong>of</strong> overburden<br />

must be consulted with structural engineer.<br />

• Garbage grinder in the kitchen may cause food wastes rotting in the tank which may<br />

cause bad smell from the tank.<br />

Recommendations:<br />

• Installation <strong>of</strong> standard <strong>inspection</strong> manhole at the CPT Zons AQUAstar tank inlet side.<br />

This will allow to easily remove any possible blockages from the inlet pipe.<br />

• Installation <strong>of</strong> domestic grease trap at the kitchen outlet pipe. According to EPA 2000<br />

Manual - Grease should not be allowed to enter the reactor. Major problem in the<br />

drainage system in dwelling houses is the build up <strong>of</strong> grease and waste solids in the<br />

drainage system. While the grease is still warm it flows freely but once it cools it solidifies<br />

and eventually blocks the pipes. The grease trap can be easily installed in new and existing<br />

waste water systems where 110mm piping is already being used.<br />

Soil polishing filters<br />

Soil polishing filters should be used to treat wastewater from mechanical aeration systems<br />

which AQUAstar is. These filters are employed to reduce micro-organisms, phosphorus, and<br />

nitrate nitrogen. Soil polishing filters may comprise in situ soil, improved soil or imported soil.<br />

There grass growth is allowed, there can be a large reduction in NO3-N. These soils should<br />

have percolation values (P or T) in the range <strong>of</strong> 1-50. Dosing may be by gravity or by pumped<br />

arrangements. Please contact us for soil polishing filter type and size recommendation (Mob.:<br />

086 1735964 or e-mail: aquastar@carlowprecasttanks.com).<br />

CPT Zons does not provide design and installation <strong>of</strong> soil polishing filters. CPT Zons may recommend<br />

trenches length or area according to EPA Manual. Client may ask County Council<br />

for established list <strong>of</strong> approved site assessors.<br />

Ensure that plant is in operation by checking the beacon installed<br />

above the tank. Green led confirms that plant is in operation,<br />

when green led is <strong>of</strong>f that means that there is no power<br />

supply. Red led on beacon indicates malfunction in operation<br />

and alarm message is displayed on the MULTICOM control unit.<br />

In this case contact Carlow Precast Tanks <strong>of</strong>fice for advice.<br />

Monthly controls<br />

<strong>For</strong> <strong>inspection</strong> <strong>purposes</strong> <strong>only</strong>.<br />

<strong>Consent</strong> <strong>of</strong> <strong>copyright</strong> <strong>owner</strong> <strong>required</strong> for any other use.<br />

Check if there is sludge in the plant's outflow and if inlet and outlet<br />

pipes are not blocked.<br />

When the end user is absent for a longer period, he must ensure<br />

that the operation controls are executed by another person.<br />

Sludge disposal<br />

The wastewater’s solid deposits (sludge) are retained in the<br />

plant’s primary settlement chamber. These solids must be disposed<br />

by an authorized waste management company.<br />

To guarantee optimum function <strong>of</strong> the plant, we recommend sludge removal <strong>only</strong> when <strong>required</strong>.<br />

Sludge removal must be performed when the primary settlement chamber’s sludge<br />

content exceeds 50 %. Ensure that <strong>only</strong> the primary settlement chambers are emptied, not<br />

the aeration tank. Otherwise, the bacteria which perform the biological treatment are lost<br />

and the plant must be reseeded.<br />

After de-sludging the primary settlement chamber must be refilled with clear or rain water.<br />

Refill from the middle chamber, so that possible remaining sludge is transferred into the first<br />

primary settlement chamber.<br />

4<br />