For inspection purposes only. Consent of copyright owner required ...
For inspection purposes only. Consent of copyright owner required ... For inspection purposes only. Consent of copyright owner required ...
1B1 Drainage Geocomposite Datasheet: D1 Data GB05 Construction Core Extruded Polyethylene (PE) Net Dated 01.01.2010 Page 1 of 2 Filter/Separator Nonwoven thermally bonded geotextile (Polyethylene/Polypropylene) on each side of the core Hydraulic Properties — Composite (Mean values) In Plane Water Flow EN ISO 12958 20kPa l.m.s (10 -3 m 2 /s) 0.70 (Surfaces Hard/Hard, Hydraulic Gradient = 1.0) 100kPa l.m.s (10 -3 m 2 /s) 0.65 200kPa l.m.s (10 -3 m 2 /s) 0.58 Hydraulic Properties — Filter (Mean Values) Pore Size EN ISO 12956 mm 0.15 Permeability (Velocity Index H50) EN ISO 11058 l/m 2 s (10 -3 m/s) 100 Mechanical Properties — Composite (Mean values) Tensile Strength EN ISO 10319 MD kN/m 20.0 EN ISO 10319 CMD kN/m 15.5 CBR Puncture Resistance EN ISO 12236 N 3300 Physical Properties—Composite (Typical values) Mass per Unit Area EN ISO 9864 g/m 2 670 Thickness (2kPa) EN ISO 9863-1 mm 5.0 Roll Width m 2.0 or 4.0 Roll Length m 25, 50 or 100 Filter Overlap (One Side) mm 100 Notes: For inspection purposes only. Consent of copyright owner required for any other use. 1. TERRAM 1B1 comprises a polyethylene, three dimensional net structure with a layer of TERRAM geotextile bonded to each side by thermal lamination. 2. The mechanical and hydraulic results quoted are the family means of the appropriate tests derived over periods of time. 3. The in-plane water flow is measured in the length (longitudinal) direction. EPA Export 24-08-2012:23:55:49
Datasheet: D1 Data GB05 Water Flow l.m.s (10 -3 m 2 /s) 1.1 1 0.9 0.8 0.7 0.6 0.5 TERRAM Geotextile TERRAM B Drainage Net Dated 01.01.2010 Page 2 of 2 20kPA 100kPa 200kPa Confining Pressure kPa (kN/m 2 ) TERRAM Geotextile The information contained herein is, to the best of our knowledge, accurate in all material respects. However, since the circumstances and condi‐ tions in which such information and the products mentioned herein can be used may vary and are beyond our control, no representation or war‐ ranty, express or implied, of any nature whatsoever is or will be made and no responsibility or liability is or will be accepted by us, any of our affili‐ ates or our or their respective directors, officers, employees or agents in relation to the accuracy or completeness or use of the information con‐ tained herein or any such products and any such liability is expressly disclaimed. FM22730 CPD 0338 For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 24-08-2012:23:55:49
- Page 1 and 2: For inspection purposes only. Conse
- Page 3 and 4: Storage Systems Portasilo® M-Type
- Page 5 and 6: BRIDGEMONT BMS For inspection purpo
- Page 7 and 8: Weigh Bars ® Braided stainless ste
- Page 9 and 10: The newforce BridgeMont’s innovat
- Page 11 and 12: WESLEY Wheel Wash : Specification W
- Page 13 and 14: Pump House Fitted With • 24 volt
- Page 15: Datasheet: P1 Data GB01 Notes Compo
- Page 19 and 20: Application Sheet system to avoid a
- Page 21 and 22: GSE STANDARD PRODUCTS GEOMEMBRANE Q
- Page 23 and 24: GSE HD GSE HD is a high quality, hi
- Page 25 and 26: system can be thoroughly electrical
- Page 27 and 28: Contents 3 Introduction 6 Factors a
- Page 29 and 30: Landfill cells of any shape and siz
- Page 31 and 32: Four (DAC) cores of approximately 9
- Page 33 and 34: Stability on Slopes 13 Key Points D
- Page 35 and 36: Robustness In terms of relative rob
- Page 37 and 38: Cost DAC has been used as an imperm
- Page 39 and 40: Walo UK Limited is a division of th
- Page 41 and 42: For inspection purposes only. Conse
- Page 43 and 44: SuDS Site Evaluation Site Name: MEH
- Page 45 and 46: The Use of SuDS for Infiltration Th
- Page 47 and 48: 100 Year incl. 10%CC 81 m³ Filter
- Page 49 and 50: Qbar (2.3 Year) 3,786 m³ Rainfall
- Page 51 and 52: Total PRELIMINARY - SURFACE WATER S
- Page 53 and 54: Pipe Run Area Imperm. Imperm. Area
- Page 55 and 56: POLLUTANT REMOVAL �Ideally sedime
- Page 57 and 58: For inspection purposes only. Conse
- Page 59 and 60: DETENTION BASINS S I T E CONTROL Vo
- Page 61 and 62: STORMWATER WETLANDS REGIONAL CONTRO
- Page 63 and 64: OIL INTERCEPTORS Example of an Oil
- Page 65 and 66: CARLOW PRECAST Concrete Engineering
Datasheet: D1 Data GB05<br />
Water Flow l.m.s<br />
(10 -3 m 2 /s)<br />
1.1<br />
1<br />
0.9<br />
0.8<br />
0.7<br />
0.6<br />
0.5<br />
TERRAM Geotextile<br />
TERRAM B<br />
Drainage Net<br />
Dated 01.01.2010 Page 2 <strong>of</strong> 2<br />
20kPA 100kPa 200kPa<br />
Confining Pressure kPa (kN/m 2 )<br />
TERRAM Geotextile<br />
The information contained herein is, to the best <strong>of</strong> our knowledge, accurate in all material respects. However, since the circumstances and condi‐<br />
tions in which such information and the products mentioned herein can be used may vary and are beyond our control, no representation or war‐<br />
ranty, express or implied, <strong>of</strong> any nature whatsoever is or will be made and no responsibility or liability is or will be accepted by us, any <strong>of</strong> our affili‐<br />
ates or our or their respective directors, <strong>of</strong>ficers, employees or agents in relation to the accuracy or completeness or use <strong>of</strong> the information con‐<br />
tained herein or any such products and any such liability is expressly disclaimed.<br />
FM22730<br />
CPD 0338<br />
<strong>For</strong> <strong>inspection</strong> <strong>purposes</strong> <strong>only</strong>.<br />
<strong>Consent</strong> <strong>of</strong> <strong>copyright</strong> <strong>owner</strong> <strong>required</strong> for any other use.<br />
EPA Export 24-08-2012:23:55:49