28.01.2013 Views

Joda West Manganese Mine of TATA Steel - Indian Bureau of Mines

Joda West Manganese Mine of TATA Steel - Indian Bureau of Mines

Joda West Manganese Mine of TATA Steel - Indian Bureau of Mines

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

- 8 -<br />

b) Analysis <strong>of</strong> trace metals (Fe, Cr+6, Cu, Se, As, Cd, Hg, Pb, Zn & Mn) in ground water<br />

at lower elevation,<br />

c) Quality <strong>of</strong> drinking water &<br />

d) Trace metals ( Ni, Co, As, Hg) in dust fall.<br />

9. Scrutiny <strong>of</strong> annual returns on cost <strong>of</strong> operation, reserves, production, pit mouth value, stock, land<br />

use pattern and fixed assets for the year 2010-11.<br />

Cost <strong>of</strong> operation Rs. 2391.03<br />

(1) Reserve 111 1374420 MT<br />

121 & 122 305281 MT<br />

(2) Production 113666.388 Mt<br />

(3) Pit's Mouth Value Rs. 3018.828<br />

(5) Stock 43014.138 MT<br />

(4) Land use pattern Forest Area Non Forest area<br />

Under o/c workings 75.075 6.245<br />

Waste disposal 60.240 6.50<br />

Reclaimed/rehabilitated 18.112 2.055<br />

Occupied by plant, township, building 117.431 38.689<br />

Other purpose: <strong>Mine</strong>ral storage 24.690 07.550<br />

Green Belt 67.675 02.055<br />

Storage <strong>of</strong> top soil 10.00 Nil<br />

(7) Fixed assets Rs. 12479576.44<br />

10. Development, production and Ore: O.B. ratio proposed in the Mining Plan/ Scheme for the last<br />

year and current year vis–a–vis those achieved.<br />

Activity<br />

[Items (a) & (e) are not<br />

very appropriately placed,<br />

but are furnished for<br />

convenience]<br />

(a) Exploration<br />

(b) Development/ Over<br />

burden:<br />

(i) Top –soil<br />

(ii) Any other over<br />

burden than top-soil, subgrade<br />

ore and ROM<br />

mineral rejects<br />

(iii) Sub-grade ore<br />

(iv) ROM mineral rejects<br />

(c) Production<br />

(d) Ore: Overburden ratio<br />

(e) Afforestation<br />

Core BHs- 20 no<br />

(800 mtrs)<br />

Dth BHs-145 no<br />

(2825 Mtrs)<br />

Previous Financial Year<br />

2010-11<br />

2011-12<br />

(up to the month previous to<br />

date <strong>of</strong> inspection )<br />

Proposed Achieved Proposed Achieved<br />

1415294 cu.m<br />

Nil<br />

Nil<br />

21176 MT<br />

10588 MT<br />

180000 MT<br />

1:6.86 cu.m<br />

11425 Nos<br />

(4.570 Ha)<br />

Core BHs- 24 no<br />

(1197 mtrs)<br />

Dth BHs-141 no<br />

(2682 Mtrs)<br />

659600 cu.m<br />

Nil<br />

Nil<br />

13079 MT<br />

6154 MT<br />

113666 MT<br />

1:5.46 cu.m<br />

16000 Nos.<br />

(1.240Ha)<br />

Core BHs- 20 no<br />

(800 mtrs)<br />

1415294 cu.m<br />

21176 MT<br />

10588 MT<br />

180000 MT<br />

1 : 6.86 cu.m<br />

7725 Nos<br />

(4.550 Ha)<br />

Nil<br />

287271<br />

cu.m<br />

Nil<br />

Nil<br />

3034 MT<br />

1847 MT<br />

32053 MT<br />

1 : 7.78<br />

cu.m<br />

Not yet<br />

started

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!