Joda West Manganese Mine of TATA Steel - Indian Bureau of Mines
Joda West Manganese Mine of TATA Steel - Indian Bureau of Mines
Joda West Manganese Mine of TATA Steel - Indian Bureau of Mines
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
- 4 -<br />
4. (a) A note on justification in case <strong>of</strong> suspension <strong>of</strong> mining operations under rule 13(2) or<br />
prohibition <strong>of</strong> deployment <strong>of</strong> any person under rule 56 <strong>of</strong> MCDR, 1988 if recommended.<br />
Not recommended<br />
(b) If rule 13(2) or 56 has been imposed in the past, its details needs to be included specially giving<br />
reasons and letter number.<br />
Not Applicable<br />
5. Scientific Mining (As per latest approved mining Plan/Scheme)<br />
Item Proposal Actual work done Remarks<br />
i) Exploration (Rule 13)<br />
2010-11 2010-11<br />
a) Type <strong>of</strong> prospecting Core BHs - 20 , 800 mts - 24, 1197 mts 564, 24293 mts<br />
and exploration i.e. core DTH BHs - 145, 2825 mts - 141, 2682 mts 141, 2682 mts<br />
drilling & dth drilling etc.<br />
Cumulative<br />
ai) no <strong>of</strong> BHs 165<br />
165<br />
705<br />
max depth 40 mts<br />
73.4 mts 84.1 mts<br />
min depth 15 mts<br />
15 mts<br />
15 mts<br />
t meterage 3625 mts 3879.45 mts 26975.76 mts<br />
no <strong>of</strong> pits<br />
b) Total area covered<br />
ii) Workings (Rule 13)<br />
-<br />
-<br />
166<br />
a) Opencast/ underground Opencast Opencast<br />
b) Manual/ mechanized<br />
c) No. and size <strong>of</strong> each pit (L x W x H)<br />
Mechanized Mechanized<br />
D Quarry 485m x 397m x58m 450m x 350m x58m<br />
D Quarry (Extn.) 278m x 192m x 48m No excavation<br />
H Quarry 450m x 300m x 64m 400m x 300m x 58m<br />
Old -H Quarry 275m x 180m x 62m 255m x 175m x 60m<br />
Gangaigora 220m x 192m x 24m No excavation<br />
Shankiaburu 215m x 100m x 21m No excavation<br />
d) Bench size (1 x w x h) length can be Irregular length Irregular length<br />
defined as regular or irregular<br />
with 6-8m H & 6- with 6-8m H & 6-<br />
e) Ore to waste ratio pit wise if possible<br />
8m W<br />
8m W<br />
otherwise for mine. D Quarry<br />
D Quarry (Extn.)<br />
1: 5.22<br />
1: 3.70<br />
H Quarry 1: 985<br />
Old -H Quarry<br />
1: 7.6<br />
Gangaigora 1: 3<br />
No excavation<br />
Shankiaburu 1: 35.65 No excavation<br />
I - Quarry 1: 7.34<br />
No excavation<br />
f) Total area covered under<br />
excavation/pits<br />
iii) Waste disposal (Rule 13)<br />
a) Location <strong>of</strong> dumps<br />
72.260 81.320 Ha<br />
b) Method <strong>of</strong> dumping whether<br />
advancing/ retreat<br />
Retreating Retreating<br />
c) Total area covered under waste dump 66.740<br />
d) No. & size <strong>of</strong> each waste dump with number <strong>of</strong> steps lift/<br />
66.740