MCDR INSPECTION REPORT<br />

INDIAN BUREAU OF MINES<br />

MINES CONTROL & CONSERVATION OF MINERALS DIVISION<br />

Regional Office Bhubaneswar<br />

File No . ORI/IRON/KJR/MCDR- 118/BBS Vol- II Mine Code No. 30ORI 08072<br />

1) Name <strong>of</strong> Inspecting <strong>of</strong>ficer: Ibrahim Sharief<br />

2) Designation ACOM<br />

3) Accompanying <strong>mine</strong> <strong>of</strong>ficial with designation Shri M B Singh, AGM <strong>Mines</strong>,<br />

Shri Sisupal Singh, Sr. Manager (<strong>Mines</strong>)<br />

Shri K C Sahu, Manager (Geo)<br />

4) Date <strong>of</strong> Inspection 10.06.2011<br />

1.Name <strong>of</strong> <strong>mine</strong><br />

PART –I GENERAL INFORMATION<br />

<strong>Roida</strong> I <strong>Iron</strong> <strong>ore</strong> <strong>mine</strong><br />

a. Category <strong>of</strong> <strong>mine</strong><br />

A-Fully Mechanized<br />

( A-Fully mechanized, B-Other than fully<br />

mechanized )<br />

b. Mode <strong>of</strong> working ( OC/UG/Both o/c & u/g)<br />

c. Postal address<br />

OC<br />

d. State Odisha<br />

e. District Keonjhar<br />

f. Tehsil/ Taluka Barbil<br />

g. Police station Barbil<br />

h. Village Tonto<br />

i. Post Bhadrasai<br />

j. Pin Code 758035<br />

k. FAX<br />

l. E-mail<br />

06767-277524<br />

m. Phone 09937287283<br />

n. Date <strong>of</strong> first opening 05.05.2005<br />

o. Weekly day <strong>of</strong> rest Sunday<br />

2. a) Lease No. :<br />

b) Lease area in hect. with f<strong>ore</strong>st area, if any : Reserve F<strong>ore</strong>st 104.68 ha,<br />

c) Period <strong>of</strong> lease : 20 years,<br />

d) In case <strong>of</strong> f<strong>ore</strong>st area if the permission<br />

has been taken, its details like area<br />

permitted to be worked & letter No. etc.<br />

e) if the area is worked on any interim Govt.<br />

order or court order, its details.<br />

f) Date <strong>of</strong> expiry. : 04/05/2025<br />

3.a) Mineral(s) included in the lease deed :<br />

Main <strong>mine</strong>rals worked <strong>Iron</strong> Ore<br />

Mineral(s) worked : Nil<br />

: 51.99 Ha <strong>of</strong> f<strong>ore</strong>st land has been diverted as per<br />

MoEF letter no F.No.8-106/2005-FC dated<br />

19.02.2008<br />

: Not applicable<br />

4. Name and address <strong>of</strong> ( including FAX/ E-mail, if any)<br />

a) Lessee/ owner : Mideast Integrated Steels Ltd.<br />

H-1 zamarudpur Community Centre,<br />

Kailash Colony 054, New Delhi-110048<br />

b) Nominated owner : Shri R H Rao,<br />

Panchavati, Barbil,<br />

Keonjhar, Odisha- 758035


01.09.2008<br />

c) Agent with date <strong>of</strong> appointment : Shri Kamala Kanta Nanda<br />

Panchavati, Barbil, Keonjhar, 758035<br />

d) Mining Engineer and geologists appointed<br />

under rule 42 <strong>of</strong> MCDR, 1988 with date <strong>of</strong><br />

appointment and whether full/ part time with<br />

qualification.<br />

e) Mine Manager with qualification and date <strong>of</strong><br />

appointment<br />

5. Details about Mining Plan/ Mining Scheme<br />

a) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />

plan<br />

b) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />

scheme.<br />

c) Condition while approving the MP/ MS/<br />

modification<br />

d) Period <strong>of</strong> mining plan/ mining scheme in<br />

force :<br />

01.09.2008<br />

: Shri Sisupal Singh<br />

B E in Mining Engg., 10.01.2011<br />

K C Sahu,<br />

M Sc in Geology, 16.02.2011<br />

: Shri .Manibhushan Singh<br />

B E in Mining Engg., 10.09.2010<br />

: 314(3)/2008/285 Dt 04.03.09<br />

: 314(3)/2010/MCCM/(CZ)/MS-25 Dt 14.10.10<br />

: No Specific Condition<br />

: From 2010-11 to 2012-13<br />

(financial year)<br />

PART II-TECHNICAL DETAILS<br />

1. Details about employment.<br />

Maximum number <strong>of</strong> persons employed on any day during the year(i) below ground (ii) above<br />

ground and (iii) in all in the <strong>mine</strong>s.<br />

Classification<br />

Average daily employment Average No.<br />

Direct Contract Total <strong>of</strong> days<br />

worked in a<br />

year<br />

OPENCAST<br />

a) Managerial person 37 3 40 275<br />

b) Supervisory persons 40 42 82 258<br />

c) Workers 99 303 402 236<br />

d) Ministerial persons Nil Nil Nil Nil<br />

c) Employment in plant Nil Nil Nil Nil<br />

f) Others Nil Nil Nil Nil<br />

2. Community Development Plan (in and around the <strong>mine</strong>s)<br />

S.<br />

N<br />

1<br />

Proposed action<br />

towards socioeconomic<br />

development during<br />

the current year<br />

Expenditure<br />

proposed in<br />

Rs. Lakhs<br />

( Previous<br />

financial<br />

year) (2010-<br />

11)<br />

Expenditure<br />

incurred in<br />

Rs. Lakhs<br />

(Previous<br />

financial<br />

year) (2010-<br />

11)<br />

Expenditure<br />

incurred so<br />

far Till date<br />

<strong>of</strong> inspection<br />

General development<br />

in the area<br />

a) Housing 4.0 5.0 11.0 2.0<br />

b) Water supply 6.0 7.0 33.0 3.5<br />

c) Sanitation 1.0 1.0 1.0 1.0<br />

Expenditure<br />

proposed in<br />

Rs. Lakhs for<br />

current year<br />

2011-12<br />

Remarks<br />

Remarks


d) Health, safety and<br />

medical facilities.<br />

3.0 3.5 13.5 4.5<br />

2 Training 5.0 7.0 18.0 5.0<br />

3 Employment to local<br />

inhabitants<br />

30.0 34.0 124.32 35.0<br />

4 Infrastructure-public<br />

transport, roads,<br />

communication and<br />

electricity<br />

13.0 18.0 44.0 10.0<br />

5 Recreation and other<br />

sports activities<br />

5.0 7.84 25.0 5.0<br />

6 Expenditure for<br />

environment<br />

management<br />

30.0 36.50 125.50 30.0<br />

7 Others( contribution<br />

to district peripheral<br />

development fund)<br />

243.0<br />

Total<br />

% expenditure out <strong>of</strong><br />

total annual budget<br />

Total<br />

85 119.84 620.32 96.0<br />

3. Status <strong>of</strong> compliance <strong>of</strong> MCDR, 88 including therewith the rectification <strong>of</strong> outstanding violation<br />

<strong>of</strong> the rules.<br />

Date <strong>of</strong> last inspection Violation pointed out Compliance reported<br />

07.11.2009 No violations NA<br />

There is no pending violation.<br />

During present inspection, violation <strong>of</strong> Rule 13(1), 33(2) and 46 under MCDR ‘88 has been<br />

pointed out to the party vide even letter no dated 24.06.2011.<br />

4. (a) A note on justification in case <strong>of</strong> suspension <strong>of</strong> mining operations under rule 1392) or<br />

prohibition <strong>of</strong> deployment <strong>of</strong> any person under rule 56 <strong>of</strong> MCDR, 1988 if recommended.<br />

Not applicable<br />

(b) If rule 13(2) or 56 has been imposed in the past, their detail needs to be included specially<br />

giving reasons and letter number.<br />

Mining operations were suspended under rule 13(2) for violation <strong>of</strong> rule 13(1) <strong>of</strong> MCDR<br />

1988 vide even no H/11021/2/2010-BBS Team-3 dated 24/08/2010 for stocking <strong>of</strong> <strong>ore</strong> in quarry<br />

8,9,9B instead <strong>of</strong> working and 9 b<strong>ore</strong> holes were not expl<strong>ore</strong>d as proposed in approved scheme <strong>of</strong><br />

mining.<br />

5. Scientific Mining (As per latest approved mining Plan/Scheme)<br />

Item Proposal Actual work done<br />

i) Exploration (Rule 13)<br />

2010-11<br />

2010-11<br />

a) Type <strong>of</strong> prospecting and exploration<br />

i.e. pitting, drilling etc.<br />

Nil Nil<br />

b) Total area covered<br />

ii) Workings (Rule 13)<br />

Nil Nil<br />

a) Opencast/ underground Opencast Opencast<br />

b) Manual/ mechanized Mechanized Mechanized<br />

c) No. and size <strong>of</strong> each pit (L x W x H) Block 4- 560 X 358 435 x 270<br />

Remarks


Block 8- 170 X 150 170 x 150<br />

Block 9- 180 X 110 197 x 107<br />

d) Bench size (1 x w x h) length can be 9 x 9 <strong>of</strong> irregular length Some portion <strong>of</strong><br />

defined as regular or irregular<br />

quarry4 has 9 x 3,<br />

while rest have<br />

regular benches.<br />

e) Ore to waste ratio pit wise if possible<br />

otherwise for <strong>mine</strong>.<br />

1 : 0.1 1: 0.15<br />

f) Total area covered under<br />

excavation/pits<br />

25.230 18.76 ha<br />

iii) Waste disposal (Rule 13) Dump- co ordinates<br />

a) Location <strong>of</strong> dumps D1-331600-243790 0.2 Million cu m<br />

D2-331600-2437500 0.5 Million cu m<br />

b) Method <strong>of</strong> dumping whether<br />

advancing/ retreat<br />

Advancing Advancing<br />

c) Total area covered under waste dump 1.944 1.911 ha<br />

d) No. & size <strong>of</strong> each waste dump with<br />

D1-7530 m²<br />

number <strong>of</strong> steps lift/ bench.<br />

D2-11580 m²<br />

e) Yearly generation <strong>of</strong> waste quantity. 0.3 Million M³ 333675 M³<br />

f) Year-wise quantity <strong>of</strong> top soil<br />

removed, utilized & stacked.<br />

6. Conservation <strong>of</strong> <strong>mine</strong>ral- both quantitative and qualitative.<br />

i) Mineral (Rule 15)<br />

(a) No benches in <strong>ore</strong> and waste Block-4<br />

Block-8<br />

Block-9<br />

(b) Percentage <strong>of</strong> recovery <strong>of</strong> <strong>ore</strong> pit-wise w.r.t.<br />

ROM and total material<br />

Nil Nil<br />

Cumulative <strong>of</strong><br />

1000 M³ <strong>of</strong> Top<br />

soil was utilized<br />

for plantation<br />

purpose<br />

6 nos <strong>of</strong> benches in Ore & 1 no in waste<br />

5 nos <strong>of</strong> benches in Ore & 1 no in waste<br />

2 nos <strong>of</strong> benches in Ore & 1 no in waste<br />

90%<br />

ii) Sub-grade <strong>mine</strong>ral/ fines (Rule 16) 113613.17 MT <strong>of</strong> sub grade is stocked in the<br />

<strong>mine</strong><br />

(a) Separate stacking from waste Yes<br />

(b) Location <strong>of</strong> stacking D3-(900E/100N)<br />

330800-2437220<br />

(c) Total area covered for stacking D3-33000 cu m<br />

(d) No. and size <strong>of</strong> each stack One, 3300 m²<br />

(e) Quantity <strong>of</strong> yearly generation, utilization and<br />

total quantity available during inspection<br />

with grade.<br />

As on 1.4.2010 is 130902.2 MT utiliseded Qty.<br />

13989.03 MT<br />

Qty available during inspection is 113613.17 Mt<br />

iii) Beneficiation (Rule 20)<br />

(a) Efforts for improving low grade and sub-grade <strong>mine</strong>ral:<br />

3 Dry screening plant having capacity <strong>of</strong> 150TPH, & 2 dry crushing plants <strong>of</strong> 100 TPH &<br />

200TPH capacity. 13,989.03 MT <strong>of</strong>


7. Environment Management both quantitative and qualitative<br />

i) Land Environment<br />

(a) Landscape<br />

(b) Aesthetic environment<br />

(c) Soil and land use pattern<br />

Fine dumps are matted in order to prevent landscapes from fine<br />

accumulation. Made retaining wall.<br />

Reserve f<strong>ore</strong>st 104.68 Ha<br />

Degraded land by dump 8.0 Ha<br />

Degraded land by pit in f<strong>ore</strong>st 18.00 Ha<br />

Degraded land by plant, building in f<strong>ore</strong>st 6.44<br />

F<strong>ore</strong>st land occupied 45.293 Ha<br />

(d) Agriculture There is no agricultural land in & around lease area<br />

(e) F<strong>ore</strong>st (flora & fauna) The area consist <strong>of</strong> vegetation <strong>of</strong> dry deciduous species like Pisal,<br />

Bella, Harida, Amla, Gamba, Mahula. The fauna in f<strong>ore</strong>st areas<br />

are spotted deer, sloth beer. Movement <strong>of</strong> elephant is <strong>of</strong>ten<br />

noticed.<br />

(f) Vegetation<br />

(g) Public building, places and monuments (protected monument and historical monument), places<br />

<strong>of</strong> worship and places <strong>of</strong> tourist interest. : Not Applicable<br />

ii) Water Environment<br />

(a) Surface water<br />

As the slope <strong>of</strong> the active <strong>mine</strong> & dump is steep any precipitation<br />

trigger to soil erosion. For prevention garland drain being<br />

provided in a7 around pit & dump slope % water flowing there<br />

directed to silt pond. The accumulated water after sedimentation<br />

can be been used for water sprinkling on haul road & drinking<br />

purpose for f<strong>ore</strong>st habitants<br />

(b) Ground water<br />

(c) Quality <strong>of</strong> water<br />

Regular monitoring <strong>of</strong> water upstream & down stream <strong>of</strong> Karo<br />

nala is being carried out and record is maintained & submitted to<br />

state pollution control board<br />

iii) Air Environment<br />

Water sprinkling arrangements at regular intervals and static auto<br />

water sprinkler has been installed in main haul road to suppress<br />

the dust.<br />

(a) Noise<br />

Noise survey will be carried out quarterly. Noise generated are<br />

within permissible limit<br />

(b) Air In built dry fog system has been installed in screening & crushing<br />

plants. Periodically air monitoring has been carried out.<br />

(c) Climatic condition Mild<br />

iv) Socio-economic<br />

environment<br />

Local villagers are employed in the <strong>mine</strong>.<br />

(a) Social and demographic<br />

pr<strong>of</strong>ile<br />

(b) Recommending health and 2 doctors and pharmacist have been appointed. Medical camps are<br />

safety<br />

being conducted in near by villages to provide treatment to<br />

villagers. Ambulance service being provided to children.<br />

(c) Human settlement There is no human settlement within the lease area.<br />

(d) Recreational facility The villagers are provided with sports goods 7 contribution<br />

towards sports arrangements


8. Sensitive technical items on conservation <strong>of</strong> <strong>mine</strong>ral, scientific mining and protection <strong>of</strong><br />

environment<br />

Specific issues that are required to be kept in focus for examination & monitoring should be stated<br />

here.<br />

Mining is carried out with all exploratory data & mechanized mining operation with three shift<br />

working. All the permission required to mining has been obtained. Except in north western part <strong>of</strong><br />

quarry-4, benches are designed 09 mtr height & width 20 ntrs. Haul roads <strong>of</strong> sufficient width &<br />

safety features such as safety berm, signals and curves are well maintained. Wet drilling is in<br />

practice. Sufficient no <strong>of</strong> supervisory personnel are employed. Dust suppression is done by water<br />

sprinklers, controlled blasting is followed in order to minimize ground vibration. Dry fog system is<br />

followed in crushers. DG sets <strong>of</strong> acoustic barriers are provided. Material chutes are kept at 9 mtrs<br />

height to prevent dust generation. Conveyor belts are covered with corrugated sheet<br />

1.F<strong>ore</strong>st clearance for 51.99 ha obtained vide letter no F.No 8-106/2005-FC dated 19.02.2008<br />

9. Scrutiny <strong>of</strong> annual returns on cost <strong>of</strong> operation, reserves, production, pit mouth value, stock,<br />

land use pattern and fixed assets for the year 2010-11.<br />

Cost <strong>of</strong> operation Rs. 632.00<br />

(1) Reserve 111 26.17 Million Tonnes<br />

121 & 122 35.47 Million Tonnes<br />

(2) Production 15,27,000 MT<br />

(3) Pit's Mouth Value Rs. 1963.73<br />

(5) Stock Lumps 2,01,112.69 MT<br />

Fines 9,59,668.097 MT<br />

(6) Land use pattern F<strong>ore</strong>st<br />

Covered under current o/c working 18.76 Ha<br />

Reclaimed/ Rehabilitated ----<br />

Waste disposal 08.00 Ha<br />

Occupied by Plant, Building, 6.44 Ha<br />

Other purpose (Green Belt) 02.125 Ha<br />

(7) Fixed assets Rs. 35,27,39,756<br />

10. Development, production and Ore: O.B. ratio proposed in the Mining Plan/ Scheme for the last<br />

year and current year vis–a–vis those achieved.<br />

Activity<br />

[Items (a) & (e) are not<br />

very appropriately placed,<br />

but are furnished for<br />

convenience]<br />

(a) Exploration<br />

(b) Development/ Over<br />

burden:<br />

(i) Top –soil<br />

(ii) Any other over<br />

burden than top-soil, subgrade<br />

<strong>ore</strong> and ROM<br />

<strong>mine</strong>ral rejects<br />

(iii) Sub-grade <strong>ore</strong><br />

(iv) ROM <strong>mine</strong>ral rejects<br />

(c) Production<br />

Previous Financial Year<br />

2010-11<br />

2011-12<br />

(up to the month previous to<br />

date <strong>of</strong> inspection )<br />

Proposed Achieved Proposed Achieved<br />

Nil<br />

Nil<br />

0.6 million tons<br />

0.5 Million tones<br />

3 million tons<br />

Nil<br />

Nil<br />

3,33,675 cu m<br />

0.25 Million<br />

tones<br />

15,27,000 MT<br />

Nil<br />

Nil<br />

0.6million<br />

tons<br />

0.5million ton<br />

3 million tons<br />

Nil<br />

Nil<br />

49950 cu.m<br />

Nil<br />

248000 MT


(d) Ore: Overburden ratio<br />

(e) Aff<strong>ore</strong>station<br />

1 : 0.1<br />

1600 Nos<br />

1 : 0.1<br />

2000 Nos<br />

1 : 0.1<br />

3200 Nos<br />

1 : 0.13<br />

200 Nos<br />

PARTIII-PERFORMANCE OF THE MINE<br />

Comments on performance <strong>of</strong> the <strong>mine</strong> owner has not been furnished as the lease is not expiring<br />

within the next two years.<br />

PART-IV PROPOSAL FOR FURTHER ACTION FOR<br />

a) <strong>Indian</strong> <strong>Bureau</strong> <strong>of</strong> <strong>Mines</strong> ( any issue related to CGPB, SPCB, assistance, consultancy, annual<br />

programme and studies & etc): None<br />

b) The state Govt, ( illegal Mining, mining dispute, infrastructure, <strong>mine</strong>ral based industry,<br />

<strong>mine</strong>ral policy & etc.) : None<br />

c) The Central Govt. ( Infrastructure development, Mineral policy and legislation, <strong>mine</strong>ral based<br />

industry & etc,) : None<br />

(IBRAHIM SHARIEF)<br />

Assistant Controller <strong>of</strong> <strong>Mines</strong>