MCDR INSPECTION REPORT<br />
INDIAN BUREAU OF MINES<br />
MINES CONTROL & CONSERVATION OF MINERALS DIVISION<br />
Regional Office Bhubaneswar<br />
File No . ORI/IRON/KJR/MCDR- 118/BBS Vol- II Mine Code No. 30ORI 08072<br />
1) Name <strong>of</strong> Inspecting <strong>of</strong>ficer: Ibrahim Sharief<br />
2) Designation ACOM<br />
3) Accompanying <strong>mine</strong> <strong>of</strong>ficial with designation Shri M B Singh, AGM <strong>Mines</strong>,<br />
Shri Sisupal Singh, Sr. Manager (<strong>Mines</strong>)<br />
Shri K C Sahu, Manager (Geo)<br />
4) Date <strong>of</strong> Inspection 10.06.2011<br />
1.Name <strong>of</strong> <strong>mine</strong><br />
PART –I GENERAL INFORMATION<br />
<strong>Roida</strong> I <strong>Iron</strong> <strong>ore</strong> <strong>mine</strong><br />
a. Category <strong>of</strong> <strong>mine</strong><br />
A-Fully Mechanized<br />
( A-Fully mechanized, B-Other than fully<br />
mechanized )<br />
b. Mode <strong>of</strong> working ( OC/UG/Both o/c & u/g)<br />
c. Postal address<br />
OC<br />
d. State Odisha<br />
e. District Keonjhar<br />
f. Tehsil/ Taluka Barbil<br />
g. Police station Barbil<br />
h. Village Tonto<br />
i. Post Bhadrasai<br />
j. Pin Code 758035<br />
k. FAX<br />
l. E-mail<br />
06767-277524<br />
m. Phone 09937287283<br />
n. Date <strong>of</strong> first opening 05.05.2005<br />
o. Weekly day <strong>of</strong> rest Sunday<br />
2. a) Lease No. :<br />
b) Lease area in hect. with f<strong>ore</strong>st area, if any : Reserve F<strong>ore</strong>st 104.68 ha,<br />
c) Period <strong>of</strong> lease : 20 years,<br />
d) In case <strong>of</strong> f<strong>ore</strong>st area if the permission<br />
has been taken, its details like area<br />
permitted to be worked & letter No. etc.<br />
e) if the area is worked on any interim Govt.<br />
order or court order, its details.<br />
f) Date <strong>of</strong> expiry. : 04/05/2025<br />
3.a) Mineral(s) included in the lease deed :<br />
Main <strong>mine</strong>rals worked <strong>Iron</strong> Ore<br />
Mineral(s) worked : Nil<br />
: 51.99 Ha <strong>of</strong> f<strong>ore</strong>st land has been diverted as per<br />
MoEF letter no F.No.8-106/2005-FC dated<br />
19.02.2008<br />
: Not applicable<br />
4. Name and address <strong>of</strong> ( including FAX/ E-mail, if any)<br />
a) Lessee/ owner : Mideast Integrated Steels Ltd.<br />
H-1 zamarudpur Community Centre,<br />
Kailash Colony 054, New Delhi-110048<br />
b) Nominated owner : Shri R H Rao,<br />
Panchavati, Barbil,<br />
Keonjhar, Odisha- 758035
01.09.2008<br />
c) Agent with date <strong>of</strong> appointment : Shri Kamala Kanta Nanda<br />
Panchavati, Barbil, Keonjhar, 758035<br />
d) Mining Engineer and geologists appointed<br />
under rule 42 <strong>of</strong> MCDR, 1988 with date <strong>of</strong><br />
appointment and whether full/ part time with<br />
qualification.<br />
e) Mine Manager with qualification and date <strong>of</strong><br />
appointment<br />
5. Details about Mining Plan/ Mining Scheme<br />
a) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />
plan<br />
b) Letter No. and date <strong>of</strong> approval <strong>of</strong> mining<br />
scheme.<br />
c) Condition while approving the MP/ MS/<br />
modification<br />
d) Period <strong>of</strong> mining plan/ mining scheme in<br />
force :<br />
01.09.2008<br />
: Shri Sisupal Singh<br />
B E in Mining Engg., 10.01.2011<br />
K C Sahu,<br />
M Sc in Geology, 16.02.2011<br />
: Shri .Manibhushan Singh<br />
B E in Mining Engg., 10.09.2010<br />
: 314(3)/2008/285 Dt 04.03.09<br />
: 314(3)/2010/MCCM/(CZ)/MS-25 Dt 14.10.10<br />
: No Specific Condition<br />
: From 2010-11 to 2012-13<br />
(financial year)<br />
PART II-TECHNICAL DETAILS<br />
1. Details about employment.<br />
Maximum number <strong>of</strong> persons employed on any day during the year(i) below ground (ii) above<br />
ground and (iii) in all in the <strong>mine</strong>s.<br />
Classification<br />
Average daily employment Average No.<br />
Direct Contract Total <strong>of</strong> days<br />
worked in a<br />
year<br />
OPENCAST<br />
a) Managerial person 37 3 40 275<br />
b) Supervisory persons 40 42 82 258<br />
c) Workers 99 303 402 236<br />
d) Ministerial persons Nil Nil Nil Nil<br />
c) Employment in plant Nil Nil Nil Nil<br />
f) Others Nil Nil Nil Nil<br />
2. Community Development Plan (in and around the <strong>mine</strong>s)<br />
S.<br />
N<br />
1<br />
Proposed action<br />
towards socioeconomic<br />
development during<br />
the current year<br />
Expenditure<br />
proposed in<br />
Rs. Lakhs<br />
( Previous<br />
financial<br />
year) (2010-<br />
11)<br />
Expenditure<br />
incurred in<br />
Rs. Lakhs<br />
(Previous<br />
financial<br />
year) (2010-<br />
11)<br />
Expenditure<br />
incurred so<br />
far Till date<br />
<strong>of</strong> inspection<br />
General development<br />
in the area<br />
a) Housing 4.0 5.0 11.0 2.0<br />
b) Water supply 6.0 7.0 33.0 3.5<br />
c) Sanitation 1.0 1.0 1.0 1.0<br />
Expenditure<br />
proposed in<br />
Rs. Lakhs for<br />
current year<br />
2011-12<br />
Remarks<br />
Remarks
d) Health, safety and<br />
medical facilities.<br />
3.0 3.5 13.5 4.5<br />
2 Training 5.0 7.0 18.0 5.0<br />
3 Employment to local<br />
inhabitants<br />
30.0 34.0 124.32 35.0<br />
4 Infrastructure-public<br />
transport, roads,<br />
communication and<br />
electricity<br />
13.0 18.0 44.0 10.0<br />
5 Recreation and other<br />
sports activities<br />
5.0 7.84 25.0 5.0<br />
6 Expenditure for<br />
environment<br />
management<br />
30.0 36.50 125.50 30.0<br />
7 Others( contribution<br />
to district peripheral<br />
development fund)<br />
243.0<br />
Total<br />
% expenditure out <strong>of</strong><br />
total annual budget<br />
Total<br />
85 119.84 620.32 96.0<br />
3. Status <strong>of</strong> compliance <strong>of</strong> MCDR, 88 including therewith the rectification <strong>of</strong> outstanding violation<br />
<strong>of</strong> the rules.<br />
Date <strong>of</strong> last inspection Violation pointed out Compliance reported<br />
07.11.2009 No violations NA<br />
There is no pending violation.<br />
During present inspection, violation <strong>of</strong> Rule 13(1), 33(2) and 46 under MCDR ‘88 has been<br />
pointed out to the party vide even letter no dated 24.06.2011.<br />
4. (a) A note on justification in case <strong>of</strong> suspension <strong>of</strong> mining operations under rule 1392) or<br />
prohibition <strong>of</strong> deployment <strong>of</strong> any person under rule 56 <strong>of</strong> MCDR, 1988 if recommended.<br />
Not applicable<br />
(b) If rule 13(2) or 56 has been imposed in the past, their detail needs to be included specially<br />
giving reasons and letter number.<br />
Mining operations were suspended under rule 13(2) for violation <strong>of</strong> rule 13(1) <strong>of</strong> MCDR<br />
1988 vide even no H/11021/2/2010-BBS Team-3 dated 24/08/2010 for stocking <strong>of</strong> <strong>ore</strong> in quarry<br />
8,9,9B instead <strong>of</strong> working and 9 b<strong>ore</strong> holes were not expl<strong>ore</strong>d as proposed in approved scheme <strong>of</strong><br />
mining.<br />
5. Scientific Mining (As per latest approved mining Plan/Scheme)<br />
Item Proposal Actual work done<br />
i) Exploration (Rule 13)<br />
2010-11<br />
2010-11<br />
a) Type <strong>of</strong> prospecting and exploration<br />
i.e. pitting, drilling etc.<br />
Nil Nil<br />
b) Total area covered<br />
ii) Workings (Rule 13)<br />
Nil Nil<br />
a) Opencast/ underground Opencast Opencast<br />
b) Manual/ mechanized Mechanized Mechanized<br />
c) No. and size <strong>of</strong> each pit (L x W x H) Block 4- 560 X 358 435 x 270<br />
Remarks
Block 8- 170 X 150 170 x 150<br />
Block 9- 180 X 110 197 x 107<br />
d) Bench size (1 x w x h) length can be 9 x 9 <strong>of</strong> irregular length Some portion <strong>of</strong><br />
defined as regular or irregular<br />
quarry4 has 9 x 3,<br />
while rest have<br />
regular benches.<br />
e) Ore to waste ratio pit wise if possible<br />
otherwise for <strong>mine</strong>.<br />
1 : 0.1 1: 0.15<br />
f) Total area covered under<br />
excavation/pits<br />
25.230 18.76 ha<br />
iii) Waste disposal (Rule 13) Dump- co ordinates<br />
a) Location <strong>of</strong> dumps D1-331600-243790 0.2 Million cu m<br />
D2-331600-2437500 0.5 Million cu m<br />
b) Method <strong>of</strong> dumping whether<br />
advancing/ retreat<br />
Advancing Advancing<br />
c) Total area covered under waste dump 1.944 1.911 ha<br />
d) No. & size <strong>of</strong> each waste dump with<br />
D1-7530 m²<br />
number <strong>of</strong> steps lift/ bench.<br />
D2-11580 m²<br />
e) Yearly generation <strong>of</strong> waste quantity. 0.3 Million M³ 333675 M³<br />
f) Year-wise quantity <strong>of</strong> top soil<br />
removed, utilized & stacked.<br />
6. Conservation <strong>of</strong> <strong>mine</strong>ral- both quantitative and qualitative.<br />
i) Mineral (Rule 15)<br />
(a) No benches in <strong>ore</strong> and waste Block-4<br />
Block-8<br />
Block-9<br />
(b) Percentage <strong>of</strong> recovery <strong>of</strong> <strong>ore</strong> pit-wise w.r.t.<br />
ROM and total material<br />
Nil Nil<br />
Cumulative <strong>of</strong><br />
1000 M³ <strong>of</strong> Top<br />
soil was utilized<br />
for plantation<br />
purpose<br />
6 nos <strong>of</strong> benches in Ore & 1 no in waste<br />
5 nos <strong>of</strong> benches in Ore & 1 no in waste<br />
2 nos <strong>of</strong> benches in Ore & 1 no in waste<br />
90%<br />
ii) Sub-grade <strong>mine</strong>ral/ fines (Rule 16) 113613.17 MT <strong>of</strong> sub grade is stocked in the<br />
<strong>mine</strong><br />
(a) Separate stacking from waste Yes<br />
(b) Location <strong>of</strong> stacking D3-(900E/100N)<br />
330800-2437220<br />
(c) Total area covered for stacking D3-33000 cu m<br />
(d) No. and size <strong>of</strong> each stack One, 3300 m²<br />
(e) Quantity <strong>of</strong> yearly generation, utilization and<br />
total quantity available during inspection<br />
with grade.<br />
As on 1.4.2010 is 130902.2 MT utiliseded Qty.<br />
13989.03 MT<br />
Qty available during inspection is 113613.17 Mt<br />
iii) Beneficiation (Rule 20)<br />
(a) Efforts for improving low grade and sub-grade <strong>mine</strong>ral:<br />
3 Dry screening plant having capacity <strong>of</strong> 150TPH, & 2 dry crushing plants <strong>of</strong> 100 TPH &<br />
200TPH capacity. 13,989.03 MT <strong>of</strong>
7. Environment Management both quantitative and qualitative<br />
i) Land Environment<br />
(a) Landscape<br />
(b) Aesthetic environment<br />
(c) Soil and land use pattern<br />
Fine dumps are matted in order to prevent landscapes from fine<br />
accumulation. Made retaining wall.<br />
Reserve f<strong>ore</strong>st 104.68 Ha<br />
Degraded land by dump 8.0 Ha<br />
Degraded land by pit in f<strong>ore</strong>st 18.00 Ha<br />
Degraded land by plant, building in f<strong>ore</strong>st 6.44<br />
F<strong>ore</strong>st land occupied 45.293 Ha<br />
(d) Agriculture There is no agricultural land in & around lease area<br />
(e) F<strong>ore</strong>st (flora & fauna) The area consist <strong>of</strong> vegetation <strong>of</strong> dry deciduous species like Pisal,<br />
Bella, Harida, Amla, Gamba, Mahula. The fauna in f<strong>ore</strong>st areas<br />
are spotted deer, sloth beer. Movement <strong>of</strong> elephant is <strong>of</strong>ten<br />
noticed.<br />
(f) Vegetation<br />
(g) Public building, places and monuments (protected monument and historical monument), places<br />
<strong>of</strong> worship and places <strong>of</strong> tourist interest. : Not Applicable<br />
ii) Water Environment<br />
(a) Surface water<br />
As the slope <strong>of</strong> the active <strong>mine</strong> & dump is steep any precipitation<br />
trigger to soil erosion. For prevention garland drain being<br />
provided in a7 around pit & dump slope % water flowing there<br />
directed to silt pond. The accumulated water after sedimentation<br />
can be been used for water sprinkling on haul road & drinking<br />
purpose for f<strong>ore</strong>st habitants<br />
(b) Ground water<br />
(c) Quality <strong>of</strong> water<br />
Regular monitoring <strong>of</strong> water upstream & down stream <strong>of</strong> Karo<br />
nala is being carried out and record is maintained & submitted to<br />
state pollution control board<br />
iii) Air Environment<br />
Water sprinkling arrangements at regular intervals and static auto<br />
water sprinkler has been installed in main haul road to suppress<br />
the dust.<br />
(a) Noise<br />
Noise survey will be carried out quarterly. Noise generated are<br />
within permissible limit<br />
(b) Air In built dry fog system has been installed in screening & crushing<br />
plants. Periodically air monitoring has been carried out.<br />
(c) Climatic condition Mild<br />
iv) Socio-economic<br />
environment<br />
Local villagers are employed in the <strong>mine</strong>.<br />
(a) Social and demographic<br />
pr<strong>of</strong>ile<br />
(b) Recommending health and 2 doctors and pharmacist have been appointed. Medical camps are<br />
safety<br />
being conducted in near by villages to provide treatment to<br />
villagers. Ambulance service being provided to children.<br />
(c) Human settlement There is no human settlement within the lease area.<br />
(d) Recreational facility The villagers are provided with sports goods 7 contribution<br />
towards sports arrangements
8. Sensitive technical items on conservation <strong>of</strong> <strong>mine</strong>ral, scientific mining and protection <strong>of</strong><br />
environment<br />
Specific issues that are required to be kept in focus for examination & monitoring should be stated<br />
here.<br />
Mining is carried out with all exploratory data & mechanized mining operation with three shift<br />
working. All the permission required to mining has been obtained. Except in north western part <strong>of</strong><br />
quarry-4, benches are designed 09 mtr height & width 20 ntrs. Haul roads <strong>of</strong> sufficient width &<br />
safety features such as safety berm, signals and curves are well maintained. Wet drilling is in<br />
practice. Sufficient no <strong>of</strong> supervisory personnel are employed. Dust suppression is done by water<br />
sprinklers, controlled blasting is followed in order to minimize ground vibration. Dry fog system is<br />
followed in crushers. DG sets <strong>of</strong> acoustic barriers are provided. Material chutes are kept at 9 mtrs<br />
height to prevent dust generation. Conveyor belts are covered with corrugated sheet<br />
1.F<strong>ore</strong>st clearance for 51.99 ha obtained vide letter no F.No 8-106/2005-FC dated 19.02.2008<br />
9. Scrutiny <strong>of</strong> annual returns on cost <strong>of</strong> operation, reserves, production, pit mouth value, stock,<br />
land use pattern and fixed assets for the year 2010-11.<br />
Cost <strong>of</strong> operation Rs. 632.00<br />
(1) Reserve 111 26.17 Million Tonnes<br />
121 & 122 35.47 Million Tonnes<br />
(2) Production 15,27,000 MT<br />
(3) Pit's Mouth Value Rs. 1963.73<br />
(5) Stock Lumps 2,01,112.69 MT<br />
Fines 9,59,668.097 MT<br />
(6) Land use pattern F<strong>ore</strong>st<br />
Covered under current o/c working 18.76 Ha<br />
Reclaimed/ Rehabilitated ----<br />
Waste disposal 08.00 Ha<br />
Occupied by Plant, Building, 6.44 Ha<br />
Other purpose (Green Belt) 02.125 Ha<br />
(7) Fixed assets Rs. 35,27,39,756<br />
10. Development, production and Ore: O.B. ratio proposed in the Mining Plan/ Scheme for the last<br />
year and current year vis–a–vis those achieved.<br />
Activity<br />
[Items (a) & (e) are not<br />
very appropriately placed,<br />
but are furnished for<br />
convenience]<br />
(a) Exploration<br />
(b) Development/ Over<br />
burden:<br />
(i) Top –soil<br />
(ii) Any other over<br />
burden than top-soil, subgrade<br />
<strong>ore</strong> and ROM<br />
<strong>mine</strong>ral rejects<br />
(iii) Sub-grade <strong>ore</strong><br />
(iv) ROM <strong>mine</strong>ral rejects<br />
(c) Production<br />
Previous Financial Year<br />
2010-11<br />
2011-12<br />
(up to the month previous to<br />
date <strong>of</strong> inspection )<br />
Proposed Achieved Proposed Achieved<br />
Nil<br />
Nil<br />
0.6 million tons<br />
0.5 Million tones<br />
3 million tons<br />
Nil<br />
Nil<br />
3,33,675 cu m<br />
0.25 Million<br />
tones<br />
15,27,000 MT<br />
Nil<br />
Nil<br />
0.6million<br />
tons<br />
0.5million ton<br />
3 million tons<br />
Nil<br />
Nil<br />
49950 cu.m<br />
Nil<br />
248000 MT
(d) Ore: Overburden ratio<br />
(e) Aff<strong>ore</strong>station<br />
1 : 0.1<br />
1600 Nos<br />
1 : 0.1<br />
2000 Nos<br />
1 : 0.1<br />
3200 Nos<br />
1 : 0.13<br />
200 Nos<br />
PARTIII-PERFORMANCE OF THE MINE<br />
Comments on performance <strong>of</strong> the <strong>mine</strong> owner has not been furnished as the lease is not expiring<br />
within the next two years.<br />
PART-IV PROPOSAL FOR FURTHER ACTION FOR<br />
a) <strong>Indian</strong> <strong>Bureau</strong> <strong>of</strong> <strong>Mines</strong> ( any issue related to CGPB, SPCB, assistance, consultancy, annual<br />
programme and studies & etc): None<br />
b) The state Govt, ( illegal Mining, mining dispute, infrastructure, <strong>mine</strong>ral based industry,<br />
<strong>mine</strong>ral policy & etc.) : None<br />
c) The Central Govt. ( Infrastructure development, Mineral policy and legislation, <strong>mine</strong>ral based<br />
industry & etc,) : None<br />
(IBRAHIM SHARIEF)<br />