a) (ii) Lubricant (only for units with<br />

captive power Plant)<br />

C106<br />

0.65 kgs.<br />

5 b) (i) Furnace oil for oil-fired<br />

Reheating Furnace in Rolling<br />

Mill.<br />

50 kgs<br />

b) (ii) Furnace oil for Ladle heating 6 kgs.<br />

1. The above norms is applicable only if the export product(s) is/are manfactured through Electric arc<br />

furnace/ Induction furnace route using steel melting scrap as basic raw material.<br />

2. In case the product is manufactured through induction furnace route, the item at Sl.No 3(a) shall not be<br />

allowed.<br />

3. Import of item at Sl.No 4(c)(d)(e) shall be allowed against of export of wire below 1mm dia only.<br />

4. The item Non Alloy Steel Melting Scrap will be allowed as per the definition given in Section XV of<br />

Customs Tariff.<br />

C508 Hot Rolled Non Alloy<br />

Steel Plates/Sheets /hoops<br />

& Strips. (including<br />

skelp)/ wide Coils<br />

through DC arc Furnace<br />

Route (for open Cycle<br />

Operation).<br />

1000 kgs 1 a) Copper Scrap/Copper<br />

Cathode/Copper Wire<br />

Bar/Copper Rod (if copper is<br />

present in the export product)<br />

0.04 kg<br />

b) Energy Sources/Fuels (Natural<br />

Gas/LNG, NGL<br />

(Condensate/gaseous), Naptha,<br />

HSD Oil, Furnace Oil) (only for<br />

plants having captive power plant<br />

with facilities installed for use of<br />

specific energy sources/fuel)<br />

2626330K. Cal<br />

c) Energy Sources/Fuels (Natural<br />

Gas/LNG,NGL<br />

(condensate/gaseous), Naptha,<br />

High Speed Diesel Oil, Light<br />

Diesel Oil, Furnace Oil)(for reheating<br />

furnace in rolling mills,<br />

ladle heating and tundish preheating)<br />

565670 K Cal.<br />

NGL for re-heating furnaces in<br />

rolling mills, ladle heating and<br />

tundish pre-heating (only for<br />

plants having facilities installed<br />

for the use of this fuel)<br />

56 kgs<br />

2 MAJOR INPUTS :<br />

a)Non-Alloy Steel Melting 1111 Kgs.<br />

Scrap/Direct reduced iron<br />

(sponge iron/Hot Brequitted<br />

Iron)/ Pig Iron<br />

b)Lime Stone 200 kgs<br />

3 i)ADDITIVES :<br />

a)Cored wires/lumps/ powder of 1 kg<br />

Calcium Silicide (CaSi)<br />

b)Silico Manganese<br />

13 kgs<br />

OR<br />

i)Ferro Silicon 3 kgs<br />

ii)Ferro Manganese 10 kgs<br />

c)Raw Petroleum Coke /Calcined 5 kgs<br />

Petroleum Coke/Metallurigical<br />

Coke/Coke Breeze<br />

d)Cored Wires/Scrap/<br />

1 kg<br />

Ingots/Shots of Aluminium<br />

e)Dolomite 40 kgs<br />

f)Ferro Titanium/ Ferro 3 kgs