FIGURE 4-2 SUBJECT PROPERTY CONSTRUCTION BUDGET<br />
Conclusion<br />
Component<br />
SOFT/FINANCING COSTS<br />
Project Management<br />
Architectural & Engineering<br />
Interior Design<br />
Permits & Fees<br />
SUB TOTAL SOFT COSTS<br />
Soft Cost Contingency (3%)<br />
TOTAL SOFT COSTS<br />
CONSTRUCTION<br />
Guestrooms (including site work and utilities)<br />
Remodel of Visitor Center (including lobby and<br />
restaurant)<br />
Restaurant Patio<br />
Pool<br />
Kitchen Equipment<br />
FF&E<br />
OS&E<br />
IT Systems<br />
Event Lawn<br />
SUB TOTAL CONSTRUCTION COSTS<br />
Cons tructi on Conti ngency (5%)<br />
TOTAL CONSTRUCTION COSTS<br />
TOTAL SOFT AND CONSTRUCTION COSTS<br />
Financing/Legal/Reports/Closing<br />
Pre-Opening/Working Capita l<br />
Initial Franchise Fee<br />
Cost per Room<br />
$120,000 $923<br />
650,000 5,000<br />
140,000 1,077<br />
815,000 6,269<br />
1,725,000 13,269<br />
51,750 398<br />
1,776,750 13,667<br />
10,780,050 82,923<br />
750,000 5,769<br />
200,000 1,538<br />
250,000 1,923<br />
400,000 3,077<br />
1,105,000 8,500<br />
715,000 5,500<br />
450,000 3,462<br />
200,000 1,538<br />
14,850,050 114,231<br />
742,503 5,712<br />
15,592,553 119,943<br />
17,369,303 133,610<br />
1,000,000 7,692<br />
750,000 5,769<br />
85,000 654<br />
TOTAL DEVELOPMENT COST $19,204,303 $147,725<br />
Contri buted Bui l ding<br />
$2,000,000 $15,385<br />
TOTAL PROJECT COST $21,204,303 $163,110<br />
Overall, the subject property should offer a well-designed, functional layout of<br />
support areas and guestrooms. All typical and market-appropriate features and<br />
amenities appear to be included in the hotel's design. We assume that the building<br />
will be fully open and operational on the assumed opening date and will meet all<br />
local building codes and brand standards. Furthermore, we assume that the hotel<br />
staff will be adequately trained to allow for a successful opening and that premarketing<br />
efforts will have introduced the product to major local accounts at least<br />
six months in advance of the opening date.<br />
February-2011 Description of the Proposed Project<br />
<strong>Sheraton</strong> <strong>Hotel</strong> <strong>Redding</strong> <strong>At</strong> <strong>Sundial</strong> <strong>Bridge</strong> – <strong>Redding</strong>, California 32<br />
Cost