FIGURE 4-2 SUBJECT PROPERTY CONSTRUCTION BUDGET<br />

Conclusion<br />

Component<br />

SOFT/FINANCING COSTS<br />

Project Management<br />

Architectural & Engineering<br />

Interior Design<br />

Permits & Fees<br />

SUB TOTAL SOFT COSTS<br />

Soft Cost Contingency (3%)<br />

TOTAL SOFT COSTS<br />

CONSTRUCTION<br />

Guestrooms (including site work and utilities)<br />

Remodel of Visitor Center (including lobby and<br />

restaurant)<br />

Restaurant Patio<br />

Pool<br />

Kitchen Equipment<br />

FF&E<br />

OS&E<br />

IT Systems<br />

Event Lawn<br />

SUB TOTAL CONSTRUCTION COSTS<br />

Cons tructi on Conti ngency (5%)<br />

TOTAL CONSTRUCTION COSTS<br />

TOTAL SOFT AND CONSTRUCTION COSTS<br />

Financing/Legal/Reports/Closing<br />

Pre-Opening/Working Capita l<br />

Initial Franchise Fee<br />

Cost per Room<br />

$120,000 $923<br />

650,000 5,000<br />

140,000 1,077<br />

815,000 6,269<br />

1,725,000 13,269<br />

51,750 398<br />

1,776,750 13,667<br />

10,780,050 82,923<br />

750,000 5,769<br />

200,000 1,538<br />

250,000 1,923<br />

400,000 3,077<br />

1,105,000 8,500<br />

715,000 5,500<br />

450,000 3,462<br />

200,000 1,538<br />

14,850,050 114,231<br />

742,503 5,712<br />

15,592,553 119,943<br />

17,369,303 133,610<br />

1,000,000 7,692<br />

750,000 5,769<br />

85,000 654<br />

TOTAL DEVELOPMENT COST $19,204,303 $147,725<br />

Contri buted Bui l ding<br />

$2,000,000 $15,385<br />

TOTAL PROJECT COST $21,204,303 $163,110<br />

Overall, the subject property should offer a well-designed, functional layout of<br />

support areas and guestrooms. All typical and market-appropriate features and<br />

amenities appear to be included in the hotel's design. We assume that the building<br />

will be fully open and operational on the assumed opening date and will meet all<br />

local building codes and brand standards. Furthermore, we assume that the hotel<br />

staff will be adequately trained to allow for a successful opening and that premarketing<br />

efforts will have introduced the product to major local accounts at least<br />

six months in advance of the opening date.<br />

February-2011 Description of the Proposed Project<br />

<strong>Sheraton</strong> <strong>Hotel</strong> <strong>Redding</strong> <strong>At</strong> <strong>Sundial</strong> <strong>Bridge</strong> – <strong>Redding</strong>, California 32<br />

Cost

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!