Pre-Opening and<br />
Working Capital Costs<br />
Soft Costs<br />
Replacement Cost<br />
Summary<br />
Allocation of<br />
Developer's Profit<br />
Conclusion<br />
comprise the total cost of furniture, fixtures, and equipment. Based on our<br />
understanding of the expected quality of furnishings, we estimate the replacement<br />
cost of the subject property's furniture, fixtures, and equipment (as if new) at<br />
approximately $20,000 per room, or a total of $2,600,000.<br />
Pre-opening costs include expenses such as marketing, staffing, training, and<br />
administrative expenditures. Working capital includes a working capital reserve to<br />
maintain adequate cash flow until the operation reaches a break-even point. We<br />
estimate the pre-opening costs for the subject property to be roughly $6,500 per<br />
room, or a total of $845,000.<br />
Soft costs include items other than labor and material that are necessary for<br />
construction, but are not typically part of the construction contract. Soft costs can<br />
include professional fees, financing costs and the interest paid on construction<br />
loans, taxes and the builder’s or developer’s all-risk insurance during construction,<br />
marketing, sales, and lease-up costs incurred to achieve occupancy or sales. We<br />
estimate the amount of soft costs for the subject property to be approximately<br />
$15,500 per room, or a total of $2,015,000.<br />
Based on the preceding analysis, we estimate the replacement cost of the subject<br />
property as follows.<br />
FIGURE 12-7 REPLACEMENT COST SUMMARY<br />
Item Cost per Room Cost<br />
Building $109,686 $14,259,141<br />
Furniture, Fixtures, & Equipment 20,000 2,600,000<br />
Pre-Opening & Worki ng Ca pi ta l 6,500 845,000<br />
Soft Costs 15,500 2,015,000<br />
Total Replacement Cost $151,686 $19,719,141<br />
Developer's profit represents the entrepreneurial incentive anticipated by hotel<br />
developers to induce the construction of a new hotel project. As a result of<br />
economic conditions in the hotel industry, developer's profit has not always been<br />
in evidence. <strong>Hotel</strong> developers generate a profit through the hotel’s cash flow and<br />
ultimate sale or refinancing.<br />
In the estimation of development cost for the subject property, the costs of several<br />
components of the total property were quantified. The replacement cost of the<br />
building as if new utilizing the Marshall & Swift Cost Estimator program as well as<br />
our review of the hotel’s construction budget. This replacement cost estimate has<br />
been rounded to $19,700,000. This value estimate compares to the developer’s<br />
February-2011 Cost Approach<br />