FACTS & FIGURES - Tecnimont ICB
FACTS & FIGURES - Tecnimont ICB
FACTS & FIGURES - Tecnimont ICB
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4<br />
14<br />
10 January<br />
MT signs a contract with API Raffineria di<br />
Falconara to supply engineering and supervisory<br />
services for the Falconara Marittima<br />
integrated energy centre in Italy. The Group<br />
will provide the refinery with a dedicated team<br />
of specialist engineers and project managers.<br />
14 January<br />
MT receives a safety award for 15 million<br />
man-hours without lost-time injury at the<br />
Petro Rabigh project in Saudi Arabia.<br />
15 January<br />
MT signs a contract with Polinter (PEQUIVEN)<br />
for the provision of basic engineering design<br />
services and the procurement of long lead<br />
items for a 300,000 tonnes/year low density<br />
polyethylene (LDPE) as part of the Olefinas<br />
Tercera y Polietilenos El Tablazo complex.<br />
25 January<br />
The go-live date for the new integrated Group<br />
IT system, SEED. The system allows for a<br />
global overview of the business and ensures<br />
the integration and traceability of Group<br />
transactions, creating advantages in terms of<br />
efficiency and optimization.<br />
2008 HIGHLIGHTS<br />
29 January<br />
An MT-led consortium is awarded two<br />
mega-contracts in Brazil for the<br />
construction on a lump-sum turnkey<br />
basis of two power stations with a<br />
combined capacity of 1,080 MW. The first<br />
plant will be realized for the major<br />
Brazilian private investor MPX near the<br />
port of Itaqui, in the state of Maranhao,<br />
the second for MPX and EDP (through its<br />
Brazilian subsidiary Energias do Brasil)<br />
near the port of Pecem, in Cearà state.<br />
Both plants will be built to comply with<br />
stringent environmental standards that<br />
exceed those currently in force in Brazil.<br />
11 February<br />
MT signs a joint venture with the Egyptian<br />
Petrochemicals Holding Company (ECHEM),<br />
controlled by the national Ministry of<br />
Petroleum, for the incorporation of a new<br />
company to provide engineering services and<br />
management for the construction of industrial<br />
plants in Egypt and nearby countries.<br />
20 February<br />
MT signs a contract with Silfab for basic<br />
engineering design services, main<br />
equipment procurement, permitting services<br />
and other support activities for a new high<br />
added value manufacturing plant in the<br />
photovoltaics industry.<br />
15