2 12 <strong>May</strong>’06 TSIL – Waste Heat Tata Sponge and 31,762<br />
Recovery Based Power Iron Limited<br />
Project<br />
3 03 Jul’06 8MW Waste Heat OCL India 32,498<br />
Recover Based Captive Limited<br />
Power Project at OCL<br />
4 10 Jul’06 Waste heat recovery Monnet Ispat Ltd 1,18,383<br />
based captive power<br />
project at Monnet<br />
5 17 Jul’06 VGL – Waste Heat Vandana Global Limited 18,965<br />
based 4 MW Captive<br />
Power Project at Raipur<br />
6 17 Jul’06 JBSL – Waste Heat Jai Balaji Sponge Limited 46,387<br />
Recovery Based Captive<br />
Power Project<br />
7 08 Oct’06 Shri Bajrang WHR Shri Bajrang Power 1,07,683<br />
CDM Project and Ispat Limited<br />
8 09 Dec’06 Nakoda WHR Shree Nakoda 32,873<br />
CDM Project Ispat Limited<br />
9 15 Dec’06 OSIL – Waste Heat Orissa Sponge 41,052<br />
Recovery Based Captive Iron Limited<br />
Power Project<br />
10 17 Dec’06 “Waste heat recovery SKS Ispat Ltd. 1,16,773<br />
based captive power<br />
generation by SKS<br />
Ispat Limited”<br />
11 23 Dec’06 Usha Martin Limited – Usha Martin Limited 54,340<br />
Waste Heat Recovery<br />
Based Captive Power<br />
Project activity<br />
12 12 Feb’07 Waste Heat based 4.75 Rashmi Sponge<br />
MW captive power project Iron Pvt. Ltd. 23,887<br />
“RSIPL – WHRB (1&2) “<br />
CDM Project activity<br />
13 18 Feb’07 Waste Heat Based 10 MW Godawari Power and 50,620<br />
Captive Power Project Ispat Limited<br />
‘GPIL – WHRB 2 “CDM<br />
Project activity<br />
Total estimated CER/Year 6,93,051<br />
MAY-<strong>2007</strong>/9