Time Line for proposal • 14 Dec 1962 Proposal prepared for EN (6MV) VdG. • 24 Jan 1963 NSF issues positive report on Nuc. Physics, proposing to double funding and make money available to build facilities • 13 Feb 1963 Provost Porter gets positive review • 15 April 1964 State Legislature appropriates $1.35M for machine and ½ of the building, • 27 October 1964 NSF grant for ½ of building ($291k) approved.
Pond Proposes going for an FN(King) rather than an EN(Standard). This is known as “bait and switch”
- Page 1 and 2: Experimental Nuclear Physics at Sto
- Page 3: 1975 1966 Van de Graaff 1968 Superc
- Page 6 and 7: Proposal for EN tandem Van de Graaf
- Page 8: Time Line for proposal • 14 Dec 1
- Page 14 and 15: Time Line for proposal • 14 Dec 1
- Page 17 and 18: November-10-1966
- Page 19 and 20: February-1-1967
- Page 21 and 22: Completed Van de Graaff building Tr
- Page 23 and 24: Tank entering the building
- Page 25 and 26: Van deGraaff Nuclear Experiment Fac
- Page 27 and 28: Two PDP-9 computers from DEC, each
- Page 29 and 30: Dr. Dan Dietrich, Livermore. (Metca
- Page 31 and 32: Igloo 101
- Page 33 and 34: Prof. Gunter Schatz, Univ. Konstanz
- Page 35 and 36: To expedite the transfer of the sup
- Page 37 and 38: • There were competing developmen
- Page 39 and 40: Next step: Test a prototype module
- Page 42 and 43: The advanced computer control syste
- Page 44 and 45: Mike Brennan and Chen Chia-erh, wor
- Page 46 and 47: 400 W Helium Refrigerator Installat
- Page 48: Installation of Bob McGrath’s sca
- Page 51: Linac room after
- Page 55: Lifetime(seconds) Nuclear Lifetimes
- Page 58 and 59: Dave Fossan Bob McGrath Gene Sprous
- Page 60 and 61: DAVID B. FOSSAN (1934-2003) 21 Ph.D
Time Line for proposal<br />
• 14 Dec 1962 Proposal prepared for EN (6MV) VdG.<br />
• 24 Jan 1963 NSF issues positive report on Nuc. Physics,<br />
proposing to double funding and make money<br />
available to build facilities<br />
• 13 Feb 1963 Provost Porter gets positive review<br />
• 15 April 1964 State Legislature appropriates $1.35M for<br />
machine and ½ of the building,<br />
• 27 October 1964 NSF grant for ½ of building ($291k) approved.