21.01.2013 Views

YVAA Style A Air-Cooled Screw Liquid Chillers ... - Johnson Controls

YVAA Style A Air-Cooled Screw Liquid Chillers ... - Johnson Controls

YVAA Style A Air-Cooled Screw Liquid Chillers ... - Johnson Controls

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FORM 201.28-NM1.1<br />

SECTION 5 - TECHNICAL DATA<br />

ISSUE DATE: 8/29/2012<br />

SECTION 5 - TECHNICAL DATA FORM_201.28-NM1.1.EN (1106)<br />

74<br />

ELASTOMETRIC ISOLATOR INSTALLATION (GB CERTIFIED UNITS)<br />

ELASTOMETRIC ISOLATOR INSTALLATION<br />

1. Read the following instructions before begin<br />

ning installation.<br />

(B") (B)<br />

EE E<br />

2. Isolators are shipped fully assembled and are to<br />

1. Read the following instructions before beginning<br />

be positioned in accordance with the submittal<br />

drawings installation. or as otherwise recommended.<br />

2. 3. Isolators Set isolators are shipped on floor, fully housekeeping assembled pad and or are to be<br />

subbase, positioned ensuring in accordance that all isolators’ with the centerlines submittal draw-<br />

match ings or the as otherwise equipment recommended.<br />

mounting holes. It is<br />

recommends that the isolator base (A) be<br />

3. installed Set isolators on a level on the surface. floor, Shim housekeeping or grout as pad or<br />

required, subbase, leveling ensuring all isolator that all bases isolator to the same centerlines<br />

elevation match the (0.03125" equipment (0.78 mounting mm) holes. maximum It is rec-<br />

difference ommended can that be tolerated). the isolator base (A) be installed<br />

on a level surface. Shim or grout the isolator as<br />

Top Bolt<br />

Top Bolt<br />

Top Washer<br />

4. Bolt or anchor all isolators to supporting structure<br />

utilizing base thru holes (B).<br />

5. Remove top bolt and top washer. Place equiprequired,<br />

leveling all isolator bases to the same<br />

ment on top of isolators so that mounting holes<br />

elevation. The maximum difference that can be<br />

in equipment or base line up with threaded hole<br />

(C).<br />

tolerated is 0.03125" (0.78 mm).<br />

6. Reinstall 4. Bolt top or bolt anchor and all washer isolators and tighten to the supporting down. structure<br />

utilizing base thru holes (B).<br />

5. Remove the top bolt and top washer. Place equipment<br />

on top of the isolators so that the mounting<br />

holes in the equipment or base line up with the<br />

threaded hole (C).<br />

6. Reinstall the top bolt and washer and tighten the<br />

bolt down.<br />

52 JOHNSON CONTROLS<br />

(A)<br />

(A")<br />

(C") (C)<br />

Section Section E-E<br />

Top Washer<br />

(B) (B")<br />

LD16179<br />

JOHNSON CONTROLS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!