20.01.2013 Views

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SMA Solar Technology AG Initial Start-up<br />

8.2 Starting the Quick Configuration Guide (QCG)<br />

Error occurrence<br />

If the device displays an error message unexpectedly, this error must be fixed before the<br />

<strong>Sun</strong>ny Island can be put into operation. For this purpose, refer to section<br />

20 ”Troubleshooting” (page 194).<br />

Default setting of parameters<br />

Upon starting the Quick Configuration Guide, viable parameter values are set by default.<br />

The QCG is automatically activated during the initial start-up of the <strong>Sun</strong>ny Island. In this case begin<br />

with point 3. If the QCG is not activated automatically, begin with point 1.<br />

1. Switch the <strong>Sun</strong>ny Island DC circuit breaker to the "ON" position.<br />

☑ The <strong>Sun</strong>ny Island initiates the start-up phase. The<br />

notifications shown here are displayed. The last ����������������<br />

notification is displayed as soon as the start-up<br />

phase is completed.<br />

������<br />

���������<br />

2. Press and hold down until the <strong>Sun</strong>ny Island beeps three times.<br />

☑ The QCG is started.<br />

������������<br />

������������<br />

Systems with several <strong>Sun</strong>ny Island<br />

If you have a system with more than one <strong>Sun</strong>ny Island, you must first run the QCG on the<br />

slave(s) before starting the master device (display message "INIT MASTER OK START?").<br />

Only the device type is set there. Only start the master device thereafter!<br />

– "Start System" (if you have accidentally accessed the QCG and would only like to restart<br />

the system)<br />

– "New System" (if you would like to start a new system or perform changes to the plant<br />

configuration)<br />

<strong>Technical</strong> <strong>Description</strong> SI<strong>5048</strong>-TB-TEN110340 57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!