20.01.2013 Views

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Initial Start-up SMA Solar Technology AG<br />

8 Initial Start-up<br />

8.1 Requirements<br />

Check the connections<br />

Before starting the commissioning process, ensure that all electrical connections have the<br />

correct polarity and make sure that everything is connected according to the instructions.<br />

Always save data<br />

Always use the SD card to save data and events. This way, in case of a failure, SMA<br />

Solar Technology can help you quickly.<br />

The Quick Configuration Guide (QCG) allows you to quickly and easily commission your stand-alone<br />

grid power system. To do so, use the menu to select the 'right' system for you. The display then shows<br />

special queries via which the system's parameters can be set specifically.<br />

56 SI<strong>5048</strong>-TB-TEN110340 <strong>Technical</strong> <strong>Description</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!