SMA Solar Technology AG Troubleshooting<br />

20.6 Events<br />

The meanings of the events displayed by the <strong>Sun</strong>ny Island are described in the following table:<br />

20.6.1 Category INV<br />

Display no. <strong>Description</strong><br />

E101 Wait status<br />

E102 Startup process<br />

E103 Operation<br />

E104 Operating on the generator (at external input)<br />

E105 Operating on the grid (at external input)<br />

E106 Feeding-in grid operation (at external input)<br />

E107 Sleep mode (slave in single-phase systems)<br />

E108 Silent mode on the grid<br />

E110 Shutting down due to fault<br />

E115 Emergency charge<br />

E118 Automatic start<br />

E119 Manual start (transition from standby mode to operation)<br />

E120 Manual stop (transition from operation to standby mode)<br />

E129 External start (remote)<br />

E130 External stop (remote)<br />

E131 The AFC control engages<br />

E132 The AFC control stops<br />

20.6.2 Category BAT<br />

Display no. <strong>Description</strong><br />

E202 (Partial) reset of BMS due to new battery<br />

E203 State change, battery charging algorithm for float charge<br />

E204 State change, battery charging algorithm for boost charge<br />

E205 State change, battery charging algorithm for full charge<br />

E206 State change into silent mode option<br />

E207 State change, battery charging algorithm for equalization charge<br />