Multicluster Operation SMA Solar Technology AG<br />
16.6 Communication Test<br />
Using the parameter "510.08 TstClstCom" a communication test between the clusters can be started<br />
from each master device of a cluster. Switch only one master device of the extension cluster to<br />
"Transmit".<br />
The parameter "510.09 ClstComStt" delivers the status of the test. Query this parameter at all master<br />
devices, including the transmitting device. If the communication test is successful, the status "OK"<br />
appears.<br />
16.7 Automatic Frequency Control (AFC)<br />
In Multicluster operation, automatic frequency control (AFC) can only be activated at the main master.<br />
This function is activated using the "250.11 AfraEna" parameter.<br />
16.8 Updating the Firmware<br />
Stopping the <strong>Sun</strong>ny Island<br />
It is recommended to stop the entire cluster network, and to deactivate the loads insofar as<br />
this is possible.<br />
DC circuit breaker<br />
Do not activate the DC circuit breaker during update process!<br />
Carry out the update on all masters of the individual<br />
clusters via an SD card. All extension masters must have<br />
completed their updates! The message shown on the right<br />
is displayed.<br />
After the update of the masters has been carried out,<br />
carry out an automatic update of the slaves.<br />
�������������<br />
�����������<br />
Starting the Multicluster system<br />
Start the system only after the firmware on all <strong>Sun</strong>ny Island devices has been updated.<br />
138 SI<strong>5048</strong>-TB-TEN110340 <strong>Technical</strong> <strong>Description</strong>