20.01.2013 Views

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SMA Solar Technology AG Connecting External Sources<br />

14.2.1 Voltage and Frequency Limits<br />

In order to operate on the grid, very strict limits (for voltage and frequency) must generally be<br />

maintained. These strict limits are not sensible for generator operation. The limits are therefore set<br />

separately for grid operation and the generator limits are not used.<br />

Default settings<br />

The default settings for limits during grid operation comply with the following standards:<br />

• For 230V_50Hz: DIN VDE 0126-1-1 (not entirely)<br />

• For 220V_60Hz: UL1741<br />

NOTICE!<br />

For legal reasons, when operated while connected to the power distribution<br />

grid, the <strong>Sun</strong>ny Island must be equipped with a certified automatic disconnection<br />

device.<br />

The <strong>Sun</strong>ny Island does not comply with the VDE 0126-1-1 directive requested in Germany.<br />

Observe the following for legal reasons:<br />

• When operated while connected to the power distribution grid, the <strong>Sun</strong>ny Island must<br />

be equipped with a certified automatic disconnection device.<br />

14.2.2 Starting the <strong>Sun</strong>ny Island<br />

The <strong>Sun</strong>ny Island always starts in stand-alone grid operation. Once the device is operating, it checks<br />

for the presence and validity (voltage and frequency) of the external grid.<br />

14.2.3 Stand-Alone Grid Operation<br />

The power distribution grid and stand-alone grid system are disconnected and the <strong>Sun</strong>ny Island<br />

powers the stand-alone grid system. This state is characterized by the system waiting for the grid to<br />

reconnect.<br />

As long as the battery has a sufficient state of charge, the loads are powered. In stand-alone grid<br />

operation, the AC feed-in generators (e.g. <strong>Sun</strong>ny Boy) perform a charge operation, if required.<br />

<strong>Technical</strong> <strong>Description</strong> SI<strong>5048</strong>-TB-TEN110340 123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!