20.01.2013 Views

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SUNNY ISLAND 5048 - Technical Description - Wind & Sun Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SMA Solar Technology AG Battery Management<br />

The limits for all three levels can be set independently from each other. This allows individual levels to<br />

be skipped.<br />

Parameter BatPro1Soc < BatPro2Soc<br />

If the BatPro1Soc parameter < BatPro2Soc, level 1 is skipped and only level 2 is carried<br />

out.<br />

For level 1 and 2, a hysteresis of 5 % of the SOC state of charge is designated for exiting this state.<br />

Battery preservation mode LBM1 and LBM2 are automatically exited if an external<br />

voltage source (grid reconnection/generator start) is present.<br />

The battery preservation mode can be exited by manually starting the <strong>Sun</strong>ny Island. If, within<br />

5 minutes (see above), charging current is detected, the <strong>Sun</strong>ny Island continues to operate; otherwise,<br />

it switches off again.<br />

13.6 Battery Diagnostics<br />

The "320# Battery Diagnosis" menu displays several values that provide information on the past<br />

operational behavior of the battery. These values are helpful in checking the efficiency of the set<br />

parameters and in viewing the typical operating conditions of the battery (see section<br />

19.3 ”Diagnosis (300#)” (page 182)).<br />

<strong>Technical</strong> <strong>Description</strong> SI<strong>5048</strong>-TB-TEN110340 105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!