Transmission Ten-Year Development Plan 2011-2020 - Eskom
Transmission Ten-Year Development Plan 2011-2020 - Eskom
Transmission Ten-Year Development Plan 2011-2020 - Eskom
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
LIST OF TABLES<br />
Table 4.1: Connection Applications Quoted and Accepted 10<br />
Table 5.1: Major TDP transmission assets expected to be installed 12<br />
Table 6.1: Central Grid CLN load forecast and percentage load increases 15<br />
Table 6.2: New transmission assets for the Central Grid 15<br />
Table 6.3: East Grid CLN load forecast and percentage load increase 20<br />
Table 6.4: East Grid new transmission assets 21<br />
Table 6.5: North Grid CLN load forecast and percentage load increases 24<br />
Table 6.6: North Grid new transmission assets 25<br />
Table 6.7: North East Grid CLN load forecast and percentage load increases 29<br />
Table 6.8: Cumulative TDP transmission assets for the North East Grid 30<br />
Table 6.9: North West Grid CLN load forecast and percentage load increases 34<br />
Table 6.10: Cumulative assets for North West grid 35<br />
Table 6.11: South Grid CLN load forecast and percentage load increases 38<br />
Table 6.12: Cumulative TDP transmission assets for the South Grid 39<br />
Table 6.13: West Grid CLN loads and percentage load increases 43<br />
Table 6.14: Cumulative TDP transmission assets for the West Grid 44<br />
Table 7.1: Capital Expenditure per year for different categories of projects 48<br />
Table 7.2: Reliability capital expenditure per project type 49<br />
© <strong>Eskom</strong> <strong>2011</strong><br />
vi