APPENDIX B3F: COSTING FOR NORTH-WEST GRID PROJECTS<br />
Grid Project Cost R’ mil Grid Total<br />
North-West<br />
Bloemfontien Strengthening<br />
Boundary Strengthening<br />
Cape Corridor Phase 2: Zeus-Hydra 765kV Integration<br />
Cape Corridor Phase 3: 765kV Series Capacitors (NOH)<br />
Garona Strengthening<br />
Kimberley 400kV Strengthening Phase 1<br />
Kimberley 400kV Strengthening Phase 2<br />
Kimberley 400kV Strengthening Phase 3<br />
Olein Strengthening<br />
Watershed 275kV Reinforcement<br />
Please note that the amounts in the tables represents cash flows in the <strong>Ten</strong>-year plan periods, any cash flows not falling<br />
within this period have not been added, consequently the total cost of the plan may be higher that reflected here. Excludes<br />
Customer Projects and Includes <strong>Eskom</strong> Generation Projects.<br />
<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />
455<br />
930<br />
5,921<br />
906<br />
404<br />
28<br />
1,900<br />
3,272<br />
1,282<br />
166<br />
15,264