APPENDIX B3F: COSTING FOR NORTH-WEST GRID PROJECTS<br />

Grid Project Cost R’ mil Grid Total<br />

North-West<br />

Bloemfontien Strengthening<br />

Boundary Strengthening<br />

Cape Corridor Phase 2: Zeus-Hydra 765kV Integration<br />

Cape Corridor Phase 3: 765kV Series Capacitors (NOH)<br />

Garona Strengthening<br />

Kimberley 400kV Strengthening Phase 1<br />

Kimberley 400kV Strengthening Phase 2<br />

Kimberley 400kV Strengthening Phase 3<br />

Olein Strengthening<br />

Watershed 275kV Reinforcement<br />

Please note that the amounts in the tables represents cash flows in the <strong>Ten</strong>-year plan periods, any cash flows not falling<br />

within this period have not been added, consequently the total cost of the plan may be higher that reflected here. Excludes<br />

Customer Projects and Includes <strong>Eskom</strong> Generation Projects.<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />

455<br />

930<br />

5,921<br />

906<br />

404<br />

28<br />

1,900<br />

3,272<br />

1,282<br />

166<br />

15,264

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!