54<br />

APPENDIX B3B: COSTING FOR EAST GRID PROJECTS<br />

Grid Project Cost R’ mil Grid Total<br />

Ariadne-Venus 2nd 400kV Line<br />

809<br />

Assmang MTS<br />

317<br />

Avon Ext 3rd 250MVA 275/132kV transformer<br />

93<br />

Invubu Ext 1st and 2nd 500MVA 400/132kV transformers<br />

888<br />

Empangeni Strengthening - Phase 1<br />

1,007<br />

Empangeni Strengthening - Phase 2<br />

1,352<br />

Empangeni Strengthening - Phase 4<br />

3,893<br />

Eros Reinforcement - Ariadne-Eros 400kV<br />

1,154<br />

Eros Reinforcement - Eros 2nd transformer<br />

133<br />

Hector Ext 3rd 800MVA 400/275kV transformer<br />

112<br />

Hector Ext 4th 800MVA 400/275kV transformer<br />

157<br />

Eastern<br />

Incandu Ext 3rd 315MVA 400/132kV transformer<br />

Klaarwater Reinforcement - Phase 1<br />

147<br />

37<br />

21,496<br />

Klaarwater Reinforcement - Phase 2<br />

273<br />

KZN 765kV Integration<br />

3,786<br />

Ottowa Reinforcement<br />

125<br />

Pinetown Strengthening - Phase 1<br />

3,495<br />

South Coast Strengthening<br />

751<br />

Pinetown - Empangeni Interconnection<br />

1,668<br />

Normandie Ext 3rd 160MVA 400/88kV transformer<br />

77<br />

Normandie Ext 2nd 250MVA 400/132kV transformer<br />

102<br />

Mersey Ext 3rd 250MVA 275/132kV transformer<br />

92<br />

Venus-Tugela 275kV Line Loop into Bloukrans<br />

21<br />

Ingula Pumped Storage P/S Intergation<br />

1,007<br />

Please note that the amounts in the tables represents cash flows in the <strong>Ten</strong>-year plan periods, any cash flows not falling<br />

within this period have not been added, consequently the total cost of the plan may be higher that reflected here. Excludes<br />

Customer Projects and includes <strong>Eskom</strong> Generation Projects.<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong>