APPENDIX B3A: COSTING FOR CENTRAL GRID PROJECTS<br />

Grid Project Cost R’ mil Grid Total<br />

Benburg Ext 3rd 250MVA 275/132kV<br />

145<br />

Croydon Ext 3rd 250MVA 275/132kV transformer<br />

144<br />

Demeter 400kV Integration<br />

1,115<br />

Eiger Ext 3rd 80MVA 88/33kV transformer<br />

30<br />

Johannesburg Reactive Power Project<br />

50<br />

Johannesburg East Strengthening - Phase 1<br />

460<br />

Johannesburg East Strengthening - Phase 2<br />

615<br />

Johannesburg East Strengthening- Phase 3 A-D<br />

2,165<br />

Johannesburg East Strengthening - Phase 3 E-F<br />

1,928<br />

Johannesburg North - Phase 2a<br />

208<br />

Johannesburg North - Phase 2b<br />

83<br />

Johannesburg Strengthening<br />

2,437<br />

Kookfontein Phase 1<br />

17<br />

Kookfontein Phase 2<br />

132<br />

Central Kyalami Integration<br />

1,775 17,856<br />

Siluma 275/88kV MTS<br />

821<br />

Simmerpan 275/132kV substation<br />

396<br />

Simmerpan 275/88kV substation<br />

497<br />

Snowdon transformer upgrade<br />

116<br />

Vaal Strengthening Phase 1: Glockner 400/275kV Trfr<br />

509<br />

& Hera-Bernina<br />

.<br />

Vaal Strengthening Phase 2<br />

317<br />

West Rand Strengthening - Phase: Etna 400kV<br />

590<br />

Soweto Strengthening Phase 2 - 275/132kV<br />

563<br />

Soweto Strengthening Phase 1 - 275kV<br />

616<br />

West Rand Strengthening - Phase: Glockner and Hera 400kV<br />

326<br />

Coal 3 Phase 2 - 800kV HVDC<br />

0*<br />

West Rand Strengthening - Phase: Westgate B and<br />

Taunus 400kV<br />

1801<br />

* Cost included in Coal 3 Phase 2 - 800kV HVDC (Northern Region)<br />

Please note that the amounts in the tables represents cash flows in the <strong>Ten</strong>-year plan periods, any cash flows not falling<br />

within this period have not been added, consequently the total cost of the plan may be higher that reflected here. Excludes<br />

Customer Project and includes <strong>Eskom</strong> Generation Projects.<br />

© <strong>Eskom</strong> <strong>2011</strong> 53