46<br />

6.7.4 NAMAQUALAND CLN<br />

The Namaqualand CLN is supplied via the Aggeneis MTS. All the stations in this CLN have single in-feeds. A number of<br />

projects are included to bring it into compliance with the minimum security standard of N-1 redundancy. The Kronos<br />

400/132kV transformer is needed to strengthen the local distribution network which is expected to become loaded<br />

to capacity.<br />

The projects within the Namaqualand CLN are as follows:<br />

• Install Paulputs second 220/132kV 125MVA transformer 2014/2015<br />

• Construct Aggeneis-Helios 400kV line 2017<br />

• Construct Aggeneis-Nama-Gromis-Oranjemund second 220kV line 2017<br />

• Construct Aggeneis-Paulputs second 220kV line 2017<br />

• Kronos 400/132kV transformer 2017<br />

Northern Cape Reinforcement Ferrum–Garona–Nieuwehoop 400kV<br />

• Install Garona 1 x 125MVA 400/132kV transformer 2017<br />

• Construct Ferrum–Garona first 400kV line 2017<br />

• Construct Garona–Nieuwehoop first 400kV line 2017<br />

6.7.5 SOUTHERN CAPE CLN<br />

This CLN includes Beaufort West, Oudtshoorn, the Garden Route, and the Overberg. The main strengthening<br />

foreseen in this CLN is to accommodate the conversion of OCGT generation at Gourikwa to CCGT, which will<br />

require additional 400kV lines to evacuate the resulting increased output. The date of this project is uncertain, and it<br />

has therefore been omitted. The projects within the Southern Cape CLN are as follows:<br />

• Establish the Blanco 400/132kV substation 2016<br />

• Construct the third Gourikwa-Proteus 400kV line 2019<br />

• Construct the second Proteus-Droërivier 400kV line 2017<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong>