44<br />
Included in the TDP studies is the forecasted export to Namibia via the 400kV and 220kV interconnections. The<br />
export amount has been assumed to remain constant over the TDP period.<br />
The TDP schemes for the West Grid consist of extending the 400kV network and introducing 765kV injection at<br />
two points, namely Omega and Kappa. There is also the installation of additional transformers at existing and new<br />
substations.<br />
The projects associated with Nuclear 1 integration in the West Grid are specifically excluded from this summary, as it<br />
has been assumed, for the purposes of this TDP that the Nuclear 1 site will be at Thuyspunt on the South Grid.<br />
The increase in transmission assets by end 2015 and end <strong>2020</strong> and the cumulative total are shown in Table 6.14.<br />
<strong>Transmission</strong> Assets<br />
for Western Grid<br />
New Assets expected in<br />
<strong>2011</strong> - 2015<br />
<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />
New Assets expected<br />
in 2016 - <strong>2020</strong><br />
Total New<br />
Assets expected<br />
Total kms of line 270 1,216 1,486<br />
765kV Lines (km)<br />
400kV Lines (km)<br />
275kV Lines (km)<br />
Total installed<br />
Transformer MVA<br />
150<br />
120<br />
0<br />
150<br />
746<br />
320<br />
300<br />
866<br />
320<br />
6,525 3,125 9,650<br />
Transformers (no. of) 17 4 21<br />
Capacitors (no. of) 3 0 3<br />
Reactors (no. of) 12 8 20<br />
Table 6.14: Cumulative TDP transmission assets for the West Grid<br />
6.7.1 MAIN CAPE CORRIDOR<br />
The West and the South grids are supplied from the common Cape corridor to the north of Gamma substation. In<br />
2009, the combined demand of the West and South grids was ±5473MW. The difference between the combined<br />
output of local generation and the load must be supplied from the generation pool in the Highveld via the transmission<br />
lines. The main corridor schemes are as follows:<br />
Cape Corridor 765kV – Phases 2 and 3,<br />
• Construct the first Zeus-Perseus-Gamma-Kappa-Omega 765kV line 2012<br />
• Establish 765kV series compensation of the corridor north of Beta/Perseus + first Hydra-Gamma 2012<br />
765kV line