44<br />

Included in the TDP studies is the forecasted export to Namibia via the 400kV and 220kV interconnections. The<br />

export amount has been assumed to remain constant over the TDP period.<br />

The TDP schemes for the West Grid consist of extending the 400kV network and introducing 765kV injection at<br />

two points, namely Omega and Kappa. There is also the installation of additional transformers at existing and new<br />

substations.<br />

The projects associated with Nuclear 1 integration in the West Grid are specifically excluded from this summary, as it<br />

has been assumed, for the purposes of this TDP that the Nuclear 1 site will be at Thuyspunt on the South Grid.<br />

The increase in transmission assets by end 2015 and end <strong>2020</strong> and the cumulative total are shown in Table 6.14.<br />

<strong>Transmission</strong> Assets<br />

for Western Grid<br />

New Assets expected in<br />

<strong>2011</strong> - 2015<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />

New Assets expected<br />

in 2016 - <strong>2020</strong><br />

Total New<br />

Assets expected<br />

Total kms of line 270 1,216 1,486<br />

765kV Lines (km)<br />

400kV Lines (km)<br />

275kV Lines (km)<br />

Total installed<br />

Transformer MVA<br />

150<br />

120<br />

0<br />

150<br />

746<br />

320<br />

300<br />

866<br />

320<br />

6,525 3,125 9,650<br />

Transformers (no. of) 17 4 21<br />

Capacitors (no. of) 3 0 3<br />

Reactors (no. of) 12 8 20<br />

Table 6.14: Cumulative TDP transmission assets for the West Grid<br />

6.7.1 MAIN CAPE CORRIDOR<br />

The West and the South grids are supplied from the common Cape corridor to the north of Gamma substation. In<br />

2009, the combined demand of the West and South grids was ±5473MW. The difference between the combined<br />

output of local generation and the load must be supplied from the generation pool in the Highveld via the transmission<br />

lines. The main corridor schemes are as follows:<br />

Cape Corridor 765kV – Phases 2 and 3,<br />

• Construct the first Zeus-Perseus-Gamma-Kappa-Omega 765kV line 2012<br />

• Establish 765kV series compensation of the corridor north of Beta/Perseus + first Hydra-Gamma 2012<br />

765kV line