32<br />

Lowveld West strengthening<br />

• Marble Hall 2x 500MVA transformers 2013<br />

• Marble Hall – Rockdale B 1st 400kV line 2013<br />

• Marble Hall – Tubatse 1st 400kV line 2013<br />

• Marble Hall – Mokopane 1st 400kV line 2014<br />

Lowveld North strengthening<br />

• Steelpoort 400kV switching station 2013<br />

• Steelpoort loop in and out of Duvha – Leseding 2013<br />

• Tubatse – Merensky 400kV line 2014<br />

6.4.4 PRETORIA CLN<br />

Strengthening of the Tshwane Metro network is necessary to ensure adequate capacity for the city’s development.<br />

<strong>Transmission</strong> network injections will be needed at Tshwane Metro’s existing Buffel supply point and Wildebees. The<br />

other substations supplying Tshwane Metro will also experience load growth, namely, Kwagga, Njala, and Verwoerdburg.<br />

The projects in the Pretoria CLN are as follows:<br />

Tshwane Metro Strengthening<br />

• Establishing 400/275/132kV substation at Phoebus 2013<br />

• Establishing 400kV busbar at Phoebus 2013<br />

• 1x250MVA, 400/132kV line bank to Hangklip at Phoebus 2013<br />

• 1x400MVA, 400/275kV line bank to Pelly at Phoebus 2013<br />

• Operate the Hangklip-Pelly 132kV line to Phoebus-Pelly at 275kV 2013<br />

• Loop in-out Apollo-Dinaledi 400kV line into Phoebus 2013<br />

• Establish 400kV busbar at Wildebees 2014<br />

• Loop in and out Apollo-Phoebus 400kV line at Wildebees 2014<br />

• Establish 400kV busbar at Verwoerdburg 2012<br />

• Loop in and out Apollo-Pluto 400kV line at Verwoerdburg 2012<br />

• 2x250MVA, 400/132kV transformers at Verwoerdburg 2012<br />

• 1X275kV line from Lomond to Kwagga 2013<br />

• Verwoerdburg 3rd 250MVA, 400/132kV transformer 2017<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong>