The Northern Grid load growth is mainly due to platinum group metals (PGM) and ferrochrome mining and processing<br />

activities located in the Rustenburg, Polokwane and Steelpoort areas. The load demand for the years from 2009 to<br />

<strong>2020</strong> is expected to reflect the average annual percentage load increases shown in Table 7-3-1 above.<br />

The TDP Scheme Projects for the Northern Grid consist of extending the 400kV and 275kV networks as well as<br />

establishing the 765kV network, the integration of two power stations (Medupi and Coal 3) and the installation of<br />

additional transformers at existing and new substations.<br />

These main schemes are as follows:<br />

• Tabor and Spencer in the Polokwane area consists of 275kV and 400kV reinforcements.<br />

• Rustenburg 400kV reinforcement.<br />

• Medupi and Coal 3 power stations 400kV and 765kV integration.<br />

• Brits 400kV reinforcement.<br />

The TDP scheme projects for the North Grid consist of extending the 400kV and 275kV networks as well establishing<br />

the 765kV network, the integration of two power stations (Medupi and Coal 3), and the installation of additional<br />

transformers at existing and new substations. The increase in transmission assets by end-2015 and end-<strong>2020</strong> and the<br />

cumulative total are shown in Table 6.6.<br />

<strong>Transmission</strong> Assets<br />

for Northern Grid<br />

Table 6.6 North Grid new transmission assets<br />

New Assets expected<br />

in <strong>2011</strong> - 2015<br />

New Assets expected<br />

in 2016 - <strong>2020</strong><br />

Total New<br />

Assets expected<br />

Total kms of line 2,816 820 3,636<br />

765kV Lines (km)<br />

400kV Lines (km)<br />

275kV Lines (km)<br />

Total installed<br />

Transformer MVA<br />

700<br />

2,116<br />

0<br />

0<br />

670<br />

150<br />

700<br />

2,786<br />

150<br />

3,820 9,500 13,320<br />

Transformers (no. of) 10 8 18<br />

Capacitors (no. of) 0 0 0<br />

Reactors (no. of) 6 2 8<br />

© <strong>Eskom</strong> <strong>2011</strong> 25